150%">Dear all, </p>

<p class="MsoNormal" style="margin-bottom:0in;margin-bottom:.0001pt;line-height:
150%">I have a query about assigning the area light values and miscellaneous
equipment values in eQuest.</p>

<p class="MsoNormal" style="margin-bottom:0in;margin-bottom:.0001pt;line-height:
150%"> </p>

<p class="MsoNormal" style="margin-bottom:0in;margin-bottom:.0001pt;line-height:
150%;tab-stops:45.8pt 91.6pt 137.4pt 183.2pt 229.0pt 274.8pt 320.6pt 366.4pt 412.2pt 458.0pt 503.8pt 549.6pt 595.4pt 641.2pt 687.0pt 732.8pt">While
assigning the area lights, exterior loads and miscellaneous equipment loads; I input
the necessary power densities in the wizard mode. However  I have
realized that<span style="mso-fareast-font-family:"Times New Roman";mso-bidi-font-family:
"Courier New"">, the exterior lighting load (w/sf) input in the Wizard mode is multiplied
by the building area (all floors) and becomes a direct kW load on the electric
meter. This directly resulted in very high numbers for the exterior usage in
the simulation results. This is erroneous in my case and I have figured out a
way to correct it by calculating the actual exterior load figure and assigning
it to the electric meter and updating it with a necessary schedule. <span style="mso-spacerun:yes"> </span></span></p>

<p class="MsoNormal" style="margin-bottom:0in;margin-bottom:.0001pt;line-height:
150%;tab-stops:45.8pt 91.6pt 137.4pt 183.2pt 229.0pt 274.8pt 320.6pt 366.4pt 412.2pt 458.0pt 503.8pt 549.6pt 595.4pt 641.2pt 687.0pt 732.8pt"><span style="mso-fareast-font-family:"Times New Roman";mso-bidi-font-family:"Courier New"">I
was wondering if the software considers a similar analogy for calculating
the area lights and the miscellaneous equipment figures in the simulation
results as it does for the exterior usage. If that is so, i am sure my results are way too wrong or over board. what would be correct
way/s to input the area light and miscellaneous equipment figures. Please find
attached the .INP file for your reference. </span></p>

<p class="MsoNormal" style="margin-bottom:0in;margin-bottom:.0001pt;line-height:
150%;tab-stops:45.8pt 91.6pt 137.4pt 183.2pt 229.0pt 274.8pt 320.6pt 366.4pt 412.2pt 458.0pt 503.8pt 549.6pt 595.4pt 641.2pt 687.0pt 732.8pt"><span style="mso-fareast-font-family:"Times New Roman";mso-bidi-font-family:"Courier New""><br>

</span></p><p class="MsoNormal" style="margin-bottom:0in;margin-bottom:.0001pt;line-height:
150%;tab-stops:45.8pt 91.6pt 137.4pt 183.2pt 229.0pt 274.8pt 320.6pt 366.4pt 412.2pt 458.0pt 503.8pt 549.6pt 595.4pt 641.2pt 687.0pt 732.8pt"><span style="mso-fareast-font-family:"Times New Roman";mso-bidi-font-family:"Courier New"">Thanks
for your time in anticipation.</span></p>

<p class="MsoNormal" style="margin-bottom:0in;margin-bottom:.0001pt;line-height:
150%;tab-stops:45.8pt 91.6pt 137.4pt 183.2pt 229.0pt 274.8pt 320.6pt 366.4pt 412.2pt 458.0pt 503.8pt 549.6pt 595.4pt 641.2pt 687.0pt 732.8pt"><span style="mso-fareast-font-family:"Times New Roman";mso-bidi-font-family:"Courier New""> </span></p>



<p class="MsoNormal" style="margin-bottom:0in;margin-bottom:.0001pt">-- </p><div>Regards,<br>Ar. Kirti Pramod Pabrekar.</div>
<div>IGBC AP, LEED India, <br>M. Arch,<br>Environmental Planning and Design.<br></div>
<div> </div>
<div><em>...Green is a commitment...not a competition...</em></div><br>