<BODY contentEditable=true onload=parent.init()><P></P>
<P>I still cannot do the metering without getting error messages.  Attached is the project (case study for the website <A href="http://bepan.info/">http://bepan.info/</A> ) description and eQ .inp & .pd2 files.  I want to meter EACH</P>
<P>(1) pumping station (CHW, HW & DHW)</P>
<P>(2) plant equipment (Chillers, Boilers, DHW-heater)</P>
<P>(3) system serving floors for Mechanical, UG-parking, Lobby, Retail, Htl-Functions, Htl-Rooms, Restaurant.</P>
<P>The project objective is to compare alternative systems (4P-FCU, WSHP, PTAC, ) for the hotel rooms.  Metering examples in the DOE22 manuals are of no help compared to the DOE21E Supplement.  I will making it work in DOE21E first</P>
<P>Varkie</P>
<P><B>----- Original Message -----</B></P>
<P></P><B>From</B>: "Patrick J. O'Leary, Jr." <poleary1969@gmail.com> 
<P></P><B>Date</B>: Monday, March 14, 2011 3:44 pm 
<P></P><B>Subject</B>: Re: [Equest-users] Sub-Metering 
<P></P>
<P></P>> you can sub-meter each shell.  just be careful on how many meters <BR>> you <BR>> apply to a model though.  25 meter limit max.  you can make more <BR>> but the <BR>> energy & $ applied to meters in excess of the 25 limit won't <BR>> report.  <BR>> typically i just create these in detailed mode by copying & <BR>> pasting in <BR>> from my own set of masters.  though i should note i do use the <BR>> wizard to <BR>> create the external lighting power meter so the schedule is <BR>> already <BR>> setup when i transition to detailed mode.  then i assign the <BR>> external <BR>> power schedules to the meters i create for external power. <BR>> <BR>> look in the DOE22Vol1-Basics.pdf file you can download from the <BR>> same <BR>> site as equest.  page 164 has an example that won't cut & paste <BR>> here <BR>> properly so here's one i've used before. <BR>> <BR>
> em1 = master meter <BR>> em-3 & em-4 are two different buildings assigned to em1 <BR>> em-3- submeters are assigned to em-3 <BR>> em-4- submeters are assigned to em-4 <BR>> <BR>> e-tr is the tradable exterior lighting power meter <BR>> e-nt is the non-tradable exterior lighting power meter <BR>> <BR>> "EM1" = ELEC-METER <BR>>    TYPE             = UTILITY <BR>>    BLDG/SUB-METERS  = ( "EM-3", "EM-4" ) <BR>>    .. <BR>> "EM-3" = ELEC-METER <BR>>    TYPE             = BUILDING <BR>>    SUB-METERS       = ( "EM-3-1", "EM-3-LTG", "EM-3-PRC" ) <BR>>    .. <BR>> "EM-4" = ELEC-METER <BR>
>    TYPE             = BUILDING <BR>>    SUB-METERS       = ( "EM-CORE", "EM-4-1", "EM-4-LTG", "EM-4-PRC", <BR>>          "EM-CORE-LTG", "EM-CORE-PRC" ) <BR>>    .. <BR>> "EM-3-1" = ELEC-METER <BR>>    TYPE             = SUB-METER <BR>>    .. <BR>> "EM-3-LTG" = ELEC-METER <BR>>    TYPE             = SUB-METER <BR>>    .. <BR>> "EM-3-PRC" = ELEC-METER <BR>>    TYPE             = SUB-METER <BR>>    .. <BR>> "EM-CORE" = ELEC-METER <BR>
>    TYPE             = SUB-METER <BR>>    .. <BR>> "EM-4-1" = ELEC-METER <BR>>    TYPE             = SUB-METER <BR>>    .. <BR>> "EM-4-LTG" = ELEC-METER <BR>>    TYPE             = SUB-METER <BR>>    .. <BR>> "EM-4-PRC" = ELEC-METER <BR>>    TYPE             = SUB-METER <BR>>    .. <BR>> "EM-CORE-LTG" = ELEC-METER <BR>>    TYPE             = SUB-METER <BR>>    .. <BR>> "EM-CORE-PRC" = ELEC-METER <BR>
>    TYPE             = SUB-METER <BR>>    .. <BR>> "E-TR" = ELEC-METER <BR>>    TYPE             = UTILITY <BR>>    EXTERIOR-POWER   = ( 5.723 ) <BR>>    EXTERIOR-SCH     = ( "Ext Lighting Sch" ) <BR>>    EXTERIOR-EU      = ( EXT-USAGE ) <BR>>    .. <BR>> "E-NT" = ELEC-METER <BR>>    TYPE             = UTILITY <BR>>    EXTERIOR-POWER   = ( 1.42 ) <BR>>    EXTERIOR-SCH     = ( "Ext Lighting Sch" ) <BR>>    EXTERIOR-EU      = ( EXT-USAGE ) <BR>>    .. <BR>> <BR>
> On 3/14/11 1:30 PM, Varkie C Thomas wrote: <BR>> > <BR>> > How do you sub-meter (electric and fuel) a System or an <BR>> Equipment in <BR>> > Plant?  Can you sub-meter each Shell?  Which summary report <BR>> gives the <BR>> > energy use per month by sub-meter?  Is there documentation on <BR>> how to <BR>> > do this? <BR>> > <BR>> > <BR>> > _______________________________________________ <BR>> > Equest-users mailing list <BR>> > http://lists.onebuilding.org/listinfo.cgi/equest-users- <BR>> onebuilding.org> To unsubscribe from this mailing list send  a <BR>> blank message to EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG <BR>> >    <BR>> <BR>> </BODY>