i'd also forgotten.  there is a length limit to meter names.  i think. 
at least there is in terms of how much of the name is displayed in the
.sim file under the ps-a plant energy utilization.<br>
the example i gave below has 4 meters reported as "em-3 electricity" -
this could be just the way equest/doe pulls the meter info together but
it is not clear to me how the truncation keeps them separated - though
the meters have the same name in the report each appears on a separate
line like the submeter names below ...<br>
<br>
apparently the limit is 4 characters per meter name.<br>
<br>
On 3/14/11 2:58 PM, Varkie C Thomas wrote:
<blockquote cite="mid:fb1e8ef125001.4d7e4920@iit.edu" type="cite">
  <p><b>Thank you.  Varkie</b></p>
  <p><b>----- Original Message -----</b></p>
  <b>From</b>: "Patrick J. O'Leary, Jr." <a class="moz-txt-link-rfc2396E" href="mailto:poleary1969@gmail.com"><poleary1969@gmail.com></a>
  <b>Date</b>: Monday, March 14, 2011 3:44 pm
  <b>Subject</b>: Re: [Equest-users] Sub-Metering
> you can sub-meter each shell.  just be careful on how many meters <br>
> you <br>
> apply to a model though.  25 meter limit max.  you can make more <br>
> but the <br>
> energy & $ applied to meters in excess of the 25 limit won't <br>
> report.  <br>
> typically i just create these in detailed mode by copying & <br>
> pasting in <br>
> from my own set of masters.  though i should note i do use the <br>
> wizard to <br>
> create the external lighting power meter so the schedule is <br>
> already <br>
> setup when i transition to detailed mode.  then i assign the <br>
> external <br>
> power schedules to the meters i create for external power. <br>
> <br>
> look in the DOE22Vol1-Basics.pdf file you can download from the <br>
> same <br>
> site as equest.  page 164 has an example that won't cut &
paste <br>
> here <br>
> properly so here's one i've used before. <br>
> <br>
> em1 = master meter <br>
> em-3 & em-4 are two different buildings assigned to em1 <br>
> em-3- submeters are assigned to em-3 <br>
> em-4- submeters are assigned to em-4 <br>
> <br>
> e-tr is the tradable exterior lighting power meter <br>
> e-nt is the non-tradable exterior lighting power meter <br>
> <br>
> "EM1" = ELEC-METER <br>
>    TYPE             = UTILITY <br>
>    BLDG/SUB-METERS  = ( "EM-3", "EM-4" ) <br>
>    .. <br>
> "EM-3" = ELEC-METER <br>
>    TYPE             = BUILDING <br>
>    SUB-METERS       = ( "EM-3-1", "EM-3-LTG", "EM-3-PRC" ) <br>
>    .. <br>
> "EM-4" = ELEC-METER <br>
>    TYPE             = BUILDING <br>
>    SUB-METERS       = ( "EM-CORE", "EM-4-1", "EM-4-LTG",
"EM-4-PRC", <br>
>          "EM-CORE-LTG", "EM-CORE-PRC" ) <br>
>    .. <br>
> "EM-3-1" = ELEC-METER <br>
>    TYPE             = SUB-METER <br>
>    .. <br>
> "EM-3-LTG" = ELEC-METER <br>
>    TYPE             = SUB-METER <br>
>    .. <br>
> "EM-3-PRC" = ELEC-METER <br>
>    TYPE             = SUB-METER <br>
>    .. <br>
> "EM-CORE" = ELEC-METER <br>
>    TYPE             = SUB-METER <br>
>    .. <br>
> "EM-4-1" = ELEC-METER <br>
>    TYPE             = SUB-METER <br>
>    .. <br>
> "EM-4-LTG" = ELEC-METER <br>
>    TYPE             = SUB-METER <br>
>    .. <br>
> "EM-4-PRC" = ELEC-METER <br>
>    TYPE             = SUB-METER <br>
>    .. <br>
> "EM-CORE-LTG" = ELEC-METER <br>
>    TYPE             = SUB-METER <br>
>    .. <br>
> "EM-CORE-PRC" = ELEC-METER <br>
>    TYPE             = SUB-METER <br>
>    .. <br>
> "E-TR" = ELEC-METER <br>
>    TYPE             = UTILITY <br>
>    EXTERIOR-POWER   = ( 5.723 ) <br>
>    EXTERIOR-SCH     = ( "Ext Lighting Sch" ) <br>
>    EXTERIOR-EU      = ( EXT-USAGE ) <br>
>    .. <br>
> "E-NT" = ELEC-METER <br>
>    TYPE             = UTILITY <br>
>    EXTERIOR-POWER   = ( 1.42 ) <br>
>    EXTERIOR-SCH     = ( "Ext Lighting Sch" ) <br>
>    EXTERIOR-EU      = ( EXT-USAGE ) <br>
>    .. <br>
> <br>
> On 3/14/11 1:30 PM, Varkie C Thomas wrote: <br>
> > <br>
> > How do you sub-meter (electric and fuel) a System or an <br>
> Equipment in <br>
> > Plant?  Can you sub-meter each Shell?  Which summary report <br>
> gives the <br>
> > energy use per month by sub-meter?  Is there documentation on
  <br>
> how to <br>
> > do this? <br>
> > <br>
> > <br>
> > _______________________________________________ <br>
> > Equest-users mailing list <br>
> > <a class="moz-txt-link-freetext" href="http://lists.onebuilding.org/listinfo.cgi/equest-users">http://lists.onebuilding.org/listinfo.cgi/equest-users</a>- <br>
> onebuilding.org> To unsubscribe from this mailing list send  a <br>
> blank message to <a class="moz-txt-link-abbreviated" href="mailto:EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG">EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG</a> <br>
> >    <br>
> <br>
> </blockquote>
<br>
</body>
</html>