<div>Have you looked at the dual duct system?  You may be able to operate this system do do what you want.<br></div><div><br></div><div>--</div><div>Karen</div><br><div class="gmail_quote">On Mon, Feb 21, 2011 at 10:11 AM, Dane Heimerman <span dir="ltr"><<a href="mailto:daneh@mlnai.com">daneh@mlnai.com</a>></span> wrote:<br>
<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex;">Hi all,<br>
I'm trying to model a small commercial building with a changeover bypass system. What I mean is each zone would have it's own damper, but they would not have reheat. When a certain percentage of zones needed heating or cooling, the system would changeover to condition those zones, then change back, etc. The zone dampers would just open and close based on a need for the air being supplied, closing down to a minimum to maintain outdoor air requirements. I'm looking at the PVVT system, but it sounds like that system is only controlled by one zone.<br>

<br>
Also, how do you check to make sure dampers are closing when needed, etc. in the reports? I suppose you would have to make an hourly report for supply cfm, and compare that to the hours the zone is underheated or undercooled?<br>

<br>
Thanks,<br>
<br>
-- <br>
Dane Heimerman<br>
HVAC Engineer<br>
Michael L. Norris&  Associates, Inc.<br>
270 Walker Dr, Suite 201B<br>
State College, PA 16801<br>
p:814.867.3823<br>
f:814.867.4823<br>
<a href="mailto:daneh@mlnai.com" target="_blank">daneh@mlnai.com</a><br>
<br>
<br>
_______________________________________________<br>
Equest-users mailing list<br>
<a href="http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org" target="_blank">http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org</a><br>
To unsubscribe from this mailing list send  a blank message to <a href="mailto:EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG" target="_blank">EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG</a><br>
</blockquote></div><br>