<html><head><style type="text/css"><!-- DIV {margin:0px;} --></style></head><body><div style="font-family:times new roman, new york, times, serif;font-size:12pt"><DIV>Cory:</DIV>
<DIV> </DIV>
<DIV>I think we need to know exactly what schedules you changed. The thermostat settings? The fan schedule? Can you provide us with a .PD2 and .INP file for us to see?<BR></DIV>
<DIV style="FONT-FAMILY: times new roman, new york, times, serif; FONT-SIZE: 12pt"><BR>
<DIV style="FONT-FAMILY: times new roman, new york, times, serif; FONT-SIZE: 12pt"><FONT size=2 face=Tahoma>
<HR SIZE=1>
<B><SPAN style="FONT-WEIGHT: bold">From:</SPAN></B> Cory Duggin <crduggin@gmail.com><BR><B><SPAN style="FONT-WEIGHT: bold">To:</SPAN></B> equest-users@lists.onebuilding.org<BR><B><SPAN style="FONT-WEIGHT: bold">Sent:</SPAN></B> Tue, February 8, 2011 9:10:57 AM<BR><B><SPAN style="FONT-WEIGHT: bold">Subject:</SPAN></B> [Equest-users] Heating and Cooling Schedules<BR></FONT><BR>I edited the heating and cooling schedules in my simulation and reran, but the results didn't change.  I made new schedules for the times of the year when I don't want either heating or cooling running by moving the set point temperature up or down during those months.  How do I tell what equipment is running on the schedule besides the name?  Does the program depend on the format of the name to tell what equipment should use it?  Thanks<BR clear=all><BR>-- <BR>Cory Duggin, EI<BR>Tennessee Tech University<BR>Graduate Research
 Assistant<BR>Mechanical Engineering<BR></DIV></DIV></div><br>







      </body></html>