Hello all,<br><br>For a LEED EA C1 baseline energy model, I'm looking at an axial fan cooling tower performance requirement of 38.2 gpm/hp in the ASHRAE 90.1 standard Table 6.8.1G.<br><br>eQUEST requires input in EIR, what is the best way to convert this gpm/hp into EIR? eQUEST item help offers the following "The default ELEC-INPUT-RATIO for open towers is 0.0105, which corresponds to 
approximately 0.0154 hp/gpm". To directly scale from this, I'm not sure if it's a linear relationship or if it's a curve.<br><br>Thank you,<br>Ramana Koti<br><br>