<html><head><style type="text/css"><!-- DIV {margin:0px;} --></style></head><body><div style="font-family:arial, helvetica, sans-serif;font-size:10pt"><div style="color: black; font-family: arial, helvetica, sans-serif; font-size: 10pt; "></div><div><font class="Apple-style-span" face="arial, helvetica, sans-serif" size="4"><span class="Apple-style-span" style="font-size: 10pt;">The ASHRAE 90.1 Section that Timothy </span></font><font class="Apple-style-span" face="arial, helvetica, sans-serif" size="3"><span class="Apple-style-span" style="font-size: 13px;">referred</span></font><font class="Apple-style-span" face="arial, helvetica, sans-serif" size="4"><span class="Apple-style-span" style="font-size: 10pt;"> to is </span></font><font class="Apple-style-span" face="arial, helvetica, sans-serif" size="3"><span class="Apple-style-span" style="font-size: 13px;">meant</span></font><font class="Apple-style-span" face="arial, helvetica,
 sans-serif" size="4"><span class="Apple-style-span" style="font-size: 10pt;"> to be used with the Energy Cost Budget method.  This is not he </span></font><font class="Apple-style-span" face="arial, helvetica, sans-serif" size="3"><span class="Apple-style-span" style="font-size: 13px;">method</span></font><font class="Apple-style-span" face="arial, helvetica, sans-serif" size="4"><span class="Apple-style-span" style="font-size: 10pt;"> that LEED uses.  To get your pump power equal to 19 W/GPM, I would </span></font><font class="Apple-style-span" face="arial, helvetica, sans-serif" size="3"><span class="Apple-style-span" style="font-size: 13px;">suggest </span></font><font class="Apple-style-span" face="arial, helvetica, sans-serif" size="4"><span class="Apple-style-span" style="font-size: 10pt;">adjusting the static head of the pump until you get the desired W/GPM from the output file.  </span></font><br><font
 class="Apple-style-span" face="arial, helvetica, sans-serif" size="4"><span class="Apple-style-span" style="font-size: 10pt; "> </span></font></div><div style="color: black; font-family: arial, helvetica, sans-serif; font-size: 10pt; ">-Eddie</div><div style="color: black; font-family: arial, helvetica, sans-serif; font-size: 10pt; "><br></div><font class="Apple-style-span" face="arial, helvetica, sans-serif" size="4"><span class="Apple-style-span" style="font-size: 10pt;">__________________________________________________________</span></font><br><div style="color: black; font-family: arial, helvetica, sans-serif; font-size: 10pt; "><div style="font-family:arial, helvetica, sans-serif;font-size:10pt"><div style="font-family:times new roman, new york, times, serif;font-size:12pt"><font size="2" face="Tahoma"><b><span style="font-weight: bold;">From:</span></b> Omar Katanani <omar@ecoconsulting.net><br><b><span style="font-weight:
 bold;">To:</span></b> "Howe, Timothy" <Timothy.Howe@stantec.com>; equest-users@lists.onebuilding.org<br><b><span style="font-weight: bold;">Sent:</span></b> Mon, November 29, 2010 12:09:46 PM<br><b><span style="font-weight: bold;">Subject:</span></b> Re: [Equest-users] Pump kW/gpm<br></font><br>



 
 
<title>RE: Pump kW/gpm</title>




<p><font size="2">Thanks Timothy!<br>
<br>
I never read section 11 of ASHRAE 90.1...<br>
<br>
Is this method approved for LEED purposes?<br>
<br>
Thanks!<br>
Omar<br>
<br>
___________________________<br>
<br>
Omar Katanani<br>
Sustainable Design Engineer<br>
Email: omar@ecoconsulting.net<br>
<br>
<br>
EcoConsulting (Lebanon)<br>
Nahas Building, 4th floor<br>
4 St-Maron Street / Georges Haddad Avenue<br>
Postal Code: 2028 5806 SAIFI<br>
Beirut, Lebanon<br>
Tel:       +961 (0) 1 971 266<br>
Mobile:    +961 (0) 3 045 045<br>
<br>
<br>
EcoConsulting (UK) Ltd<br>
28 Marshalsea Road<br>
London, SE1 1HF<br>
Tel: +44 (0)207 939 0989<br>
Fax: +44 (0)207 939 0981<br>
Website: <a target="_blank" href="http://www.ecoconsulting.net">www.ecoconsulting.net</a><br>
<br>
<br>
<br>
-----Original Message-----<br>
From: Howe, Timothy [<a rel="nofollow" ymailto="mailto:Timothy.Howe@stantec.com" target="_blank" href="mailto:Timothy.Howe@stantec.com">mailto:Timothy.Howe@stantec.com</a>]<br>
Sent: Mon 11/29/2010 4:09 PM<br>
To: Omar Katanani; equest-users@lists.onebuilding.org<br>
Subject: RE: Pump kW/gpm<br>
<br>
Enter the following:<br>
<br>
Chilled Water:<br>
Head: 75<br>
Motor eff: 1<br>
Mech eff: .65<br>
<br>
Hot Water:<br>
Head: 60<br>
Mech eff: 1<br>
Motor eff: .60<br>
<br>
Condenser Water:<br>
Head: 60<br>
Mech eff: 1<br>
Motor eff: .60<br>
<br>
Leave everything else blank to autosize.<br>
<br>
Source: ASHRAE 90.1-2007 Section 11 Page 72<br>
<br>
<br>
Timothy Howe, MS, LEED® AP<br>
Mechanical Engineer<br>
Stantec<br>
61 Commercial Street<br>
Rochester NY 14614<br>
Ph:   (585) 413-5347<br>
Fx:   (585) 272-1814<br>
Cell: (585) 330-8681<br>
<a target="_blank" href="http://stantec.com">stantec.com</a><span><<a target="_blank" href="http://www.stantec.com">http://www.stantec.com</a>></span><br>
<br>
The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately.<br>
<br>
ü Please consider the environment before printing this email.<br>
<br>
From: equest-users-bounces@lists.onebuilding.org [<a rel="nofollow" ymailto="mailto:equest-users-bounces@lists.onebuilding.org" target="_blank" href="mailto:equest-users-bounces@lists.onebuilding.org">mailto:equest-users-bounces@lists.onebuilding.org</a>] On Behalf Of Omar Katanani<br>
Sent: Monday, November 29, 2010 6:24 AM<br>
To: equest-users@lists.onebuilding.org<br>
Subject: [Equest-users] Pump kW/gpm<br>
<br>
Dear all,<br>
<br>
Can someone tell me where I can enter the pump kW/gpm in eQUEST?<br>
<br>
I can see 2 input boxes: 1 for kW and 1 for gpm. If I need to enter 22W/gpm for my baseline chilled water loop pump, how can I do this if I do not have numbers for the wattage and flow?<br>
<br>
Thanks!<br>
Omar<br>
___________________________<br>
Omar Katanani<br>
Sustainable Design Engineer<br>
Email: omar@ecoconsulting.net<<a rel="nofollow" ymailto="mailto:omar@ecoconsulting.net" target="_blank" href="mailto:omar@ecoconsulting.net">mailto:omar@ecoconsulting.net</a>><br>
<br>
EcoConsulting (Lebanon)<br>
Nahas Building, 4th floor<br>
4 St-Maron Street / Georges Haddad Avenue<br>
Postal Code: 2028 5806 SAIFI<br>
Beirut, Lebanon<br>
Tel:          +961 (0) 1 971 266<br>
Mobile:    +961 (0) 3 045 045<br>
<br>
EcoConsulting (UK) Ltd<br>
28 Marshalsea Road<br>
London, SE1 1HF<br>
Tel:  +44 (0) 207 939 0989<br>
Fax:  +44 (0) 207 939 0981<br><span>
Website: <a target="_blank" href="http://www.ecoconsulting.net">www.ecoconsulting.net</a><<a target="_blank" href="http://www.ecoconsulting.net/">http://www.ecoconsulting.net/</a>></span><br>
<br>
<br>
 [cid:image001.jpg@01CB8FA5.16BF9060]<br>
<br>
<br>
</font>
</p>


</div></div></div><div style="position: fixed; color: black; font-family: arial, helvetica, sans-serif; font-size: 10pt; "></div>


</div></body></html>