Has anyone ever integrated the load results from a equest model into a TRNSYS model. I have a complete equest model, but I need to use the solar modeling in TRNSYS. I was hoping to have to not remodel and tweak what I already have done in equest in TRNSYS.<br clear="all">
<br>-- <br>Cory Duggin, EI<br>Tennessee Tech University<br>Graduate Research Assistant<br>Mechanical Engineering<br>