Line 2: Diagnostic Line 4: Title Line 8: Run Period: Entire Year Line 17: Holidays: Standard US Holidays Line 21: Site Parameters: Site Data Line 24: Building Parameters: Building Data Line 28: Baseline: Baseline Data Line 35: Glass Type: Window Type #1 GT Line 40: Glass Type: Window Type #2 GT Line 45: Glass Type: Window Type #3 GT Line 50: Glass Type: Door Type #1 GT Line 59: Construction: EWall Construction Line 66: Construction: Roof Construction Line 73: Layers: Ceilg Cons Layers Line 75: Error Encountered: TYPE=PROPERTIES TH=0.0625 COND=0.1330 DENS=45.0 S-H=0.2 .. Cannot simulate LAYERS Ceilg Cons Layers as given. The wall is too thin or too light. THICKNESS and/or DENSITY*SPECIFIC HEAT is too small. Use U-VALUE CONSTRUCTION. Line 77: Construction: Ceilg Construction Line 80: Error Encountered: .. ** == ************************************************************************** Ceilg Cons Layers has no data due to previous error Line 82: Material: IWall Cons Mat 2 (0.91) Line 87: Layers: IWall Cons Layers Line 92: Construction: IWall Construction Line 97: Layers: IFlr Cons Layers Line 101: Construction: IFlr Construction Line 106: Layers: IFSHL Cons Layers Line 111: Construction: IFSHL Construction Line 120: Polygon: Floor Polygon Line 127: Polygon: Space Polygon 1 Line 139: Day Schedule: ZnGrp 1 Occ 1/0 D1 Line 145: Day Schedule: ZnGrp 1 Occ 1/0 D2 Line 151: Week Schedule: ZnGrp 1 Occ 1/0 W1 Line 157: Annual Schedule: ZnGrp 1 Occ Sch Line 164: Day Schedule: ZnGrp 1 Ltg 1/0 D1 Line 170: Day Schedule: ZnGrp 1 Ltg 1/0 D2 Line 176: Week Schedule: ZnGrp 1 Ltg 1/0 W1 Line 182: Annual Schedule: ZnGrp 1 Ltg Sch Line 189: Day Schedule: ZnGrp 1 Eqp 1/0 D1 Line 195: Day Schedule: ZnGrp 1 Eqp 1/0 D2 Line 201: Week Schedule: ZnGrp 1 Eqp 1/0 W1 Line 207: Annual Schedule: ZnGrp 1 Eqp Sch Line 214: Day Schedule: ZnGrp 1 Sys1 Cool 1/0 D1 Line 220: Day Schedule: ZnGrp 1 Sys1 Cool 1/0 D2 Line 226: Week Schedule: ZnGrp 1 Sys1 Cool 1/0 W1 Line 232: Annual Schedule: ZnGrp 1 Sys1 Cool Sch Line 239: Day Schedule: ZnGrp 1 Sys1 Heat 1/0 D1 Line 245: Day Schedule: ZnGrp 1 Sys1 Heat 1/0 D2 Line 251: Week Schedule: ZnGrp 1 Sys1 Heat 1/0 W1 Line 257: Annual Schedule: ZnGrp 1 Sys1 Heat Sch Line 264: Day Schedule: ZnGrp 1 Sys1 Inf 1/0/0 D1 Line 270: Day Schedule: ZnGrp 1 Sys1 Inf 1/0/0 D2 Line 276: Week Schedule: ZnGrp 1 Sys1 Infil 1/0 W1 Line 282: Annual Schedule: ZnGrp 1 Sys1 Infil Sch Line 297: Floor: Ground Flr Line 309: Space: South Perim Spc (G.S1) Line 330: Material: UFMat (G.S1.U2.M1) Line 335: Layers: UFLyrs (G.S1.U2) Line 340: Construction: UFCons (G.S1.U2) Line 345: Underground Wall: Flr (G.S1.U1) Line 350: Exterior Wall: East Wall (G.S1.E1) Line 356: Window: East Win (G.S1.E1.W1) Line 366: Exterior Wall: North Wall (G.S1.E2) Line 372: Window: North Win (G.S1.E2.W1) Line 382: Window: North Door (G.S1.E2.D1) Line 391: Window: North Win (G.S1.E2.W2) Line 401: Exterior Wall: West Wall (G.S1.E3) Line 407: Window: West Win (G.S1.E3.W1) Line 417: Window: West Win (G.S1.E3.W2) Line 427: Window: West Win (G.S1.E3.W3) Line 437: Window: West Win (G.S1.E3.W4) Line 447: Exterior Wall: South Wall (G.S1.E4) Line 453: Window: South Win (G.S1.E4.W1) Line 463: Window: South Win (G.S1.E4.W2) Line 473: Window: South Win (G.S1.E4.W3) Line 483: Window: South Win (G.S1.E4.W4) Line 493: Interior Wall: Ceiling (G.S1.I1) Line 499: Floor: Mid Flrs Line 513: Space: South Perim Spc (M.S2) Line 534: Interior Wall: Flr (M.S2.I2) Line 540: Exterior Wall: East Slab (M.S2.S5) Line 546: Exterior Wall: East Wall (M.S2.E5) Line 552: Window: East Win (M.S2.E5.W1) Line 562: Exterior Wall: North Slab (M.S2.S6) Line 568: Exterior Wall: North Wall (M.S2.E6) Line 574: Window: North Win (M.S2.E6.W1) Line 584: Exterior Wall: West Slab (M.S2.S7) Line 590: Exterior Wall: West Wall (M.S2.E7) Line 596: Window: West Win (M.S2.E7.W1) Line 606: Window: West Win (M.S2.E7.W2) Line 616: Window: West Win (M.S2.E7.W3) Line 626: Window: West Win (M.S2.E7.W4) Line 636: Exterior Wall: South Slab (M.S2.S8) Line 642: Exterior Wall: South Wall (M.S2.E8) Line 648: Window: South Win (M.S2.E8.W1) Line 658: Window: South Win (M.S2.E8.W2) Line 668: Window: South Win (M.S2.E8.W3) Line 678: Window: South Win (M.S2.E8.W4) Line 688: Interior Wall: Ceiling (M.S2.I3) Line 694: Floor: Top Flr Line 707: Space: South Perim Spc (T.S3) Line 728: Interior Wall: Flr (T.S3.I4) Line 734: Exterior Wall: East Slab (T.S3.S9) Line 740: Exterior Wall: East Wall (T.S3.E9) Line 746: Window: East Win (T.S3.E9.W1) Line 756: Exterior Wall: North Slab (T.S3.S10) Line 762: Exterior Wall: North Wall (T.S3.E10) Line 768: Window: North Win (T.S3.E10.W1) Line 778: Exterior Wall: West Slab (T.S3.S11) Line 784: Exterior Wall: West Wall (T.S3.E11) Line 790: Window: West Win (T.S3.E11.W1) Line 800: Window: West Win (T.S3.E11.W2) Line 810: Window: West Win (T.S3.E11.W3) Line 820: Window: West Win (T.S3.E11.W4) Line 830: Exterior Wall: South Slab (T.S3.S12) Line 836: Exterior Wall: South Wall (T.S3.E12) Line 842: Window: South Win (T.S3.E12.W1) Line 852: Window: South Win (T.S3.E12.W2) Line 862: Window: South Win (T.S3.E12.W3) Line 872: Window: South Win (T.S3.E12.W4) Line 882: Exterior Wall: Roof (T.S3.E13) Line 899: Master Meters: MASTER-METERS 1 Line 904: HVAC System: Sys1 (SUM) Line 910: Thermal Zone: South Perim Zn (G.S1) Line 918: Thermal Zone: South Perim Zn (M.S2) Line 926: Thermal Zone: South Perim Zn (T.S3) Line 934: Loads Report Line 938: Systems Report Line 942: Plant Report Line 946: Economics Report Line 951: End