<html><head><style type="text/css"><!-- DIV {margin:0px;} --></style></head><body><div style="font-family:times new roman, new york, times, serif;font-size:12pt"><DIV>Carol:</DIV>
<DIV> </DIV>
<DIV>I agree, and I am trying to digest all the info I am getting, and also plan on taking Pasha up on the offer of a phone call.  I also sent an email to Marlin, (trainer I had for eQuest).</DIV>
<DIV> </DIV>
<DIV>The building is still on the drawing obpards, and is to be built in a duty-free office park in Montevideo, Uruguay.  I am in Richmond, VA.</DIV>
<DIV><BR> </DIV>
<DIV style="FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new york, times, serif"><BR>
<DIV style="FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new york, times, serif"><FONT face=Tahoma size=2>
<HR SIZE=1>
<B><SPAN style="FONT-WEIGHT: bold">From:</SPAN></B> Carol Gardner <cmg750@gmail.com><BR><B><SPAN style="FONT-WEIGHT: bold">To:</SPAN></B> Matthew Dubrovich <mdubrovich@emcengineers.com><BR><B><SPAN style="FONT-WEIGHT: bold">Cc:</SPAN></B> Paul Brooks <equestpaul@yahoo.com>; "equest-users@lists.onebuilding.org" <equest-users@lists.onebuilding.org><BR><B><SPAN style="FONT-WEIGHT: bold">Sent:</SPAN></B> Fri, May 7, 2010 12:18:50 PM<BR><B><SPAN style="FONT-WEIGHT: bold">Subject:</SPAN></B> Re: [Equest-users] Complex chiller/heat recovery/heat pump to model question<BR></FONT><BR>
<META http-equiv=x-dns-prefetch-control content=off>Hi Paul, <BR><BR>I think Matt is on to something. It does have options for both and you can use Equip Control and maybe Load Management commands. This is heady stuff for a newbie, however, so I would suggest you hire someone to do a peer review with you or to work with you. <BR><BR>So, this is an existing building, right? You will also need to bill match, etc. Where do you actually sit? In Uraguay?<BR><BR>Carol<BR><BR>
<DIV class=gmail_quote>On Fri, May 7, 2010 at 8:57 AM, Matthew Dubrovich <SPAN dir=ltr><<A href="mailto:mdubrovich@emcengineers.com" target=_blank rel=nofollow ymailto="mailto:mdubrovich@emcengineers.com">mdubrovich@emcengineers.com</A>></SPAN> wrote:<BR>
<BLOCKQUOTE class=gmail_quote style="PADDING-LEFT: 1ex; MARGIN: 0pt 0pt 0pt 0.8ex; BORDER-LEFT: rgb(204,204,204) 1px solid">
<DIV lang=EN-US>
<DIV>
<P class=MsoNormal><SPAN style="FONT-SIZE: 11pt; COLOR: rgb(31,73,125)">Hi Paul,</SPAN></P>
<P class=MsoNormal><SPAN style="FONT-SIZE: 11pt; COLOR: rgb(31,73,125)"> </SPAN></P>
<P class=MsoNormal><SPAN style="FONT-SIZE: 11pt; COLOR: rgb(31,73,125)">Though I haven’t had the opportunity to use either yet, eQuest has options for both heat recovery chillers and heat pump chillers, correct?  You can tie the heat recovery chiller into your hot water loop and it should show both a heating savings and condenser fan savings (eliminating those hand calcs hopefully).  The heat pump chillers can be sequenced through Equipment Controls and Load Management to only come on as necessary, after the 165 ton chiller is maxed out.  Coupling the heat pumps with your hot water system may be more of a challenge.  Good luck.</SPAN></P>
<P class=MsoNormal><SPAN style="FONT-SIZE: 11pt; COLOR: rgb(31,73,125)"> </SPAN></P>
<P class=MsoNormal><SPAN style="FONT-SIZE: 11pt; COLOR: rgb(31,73,125)">Matt</SPAN></P>
<P class=MsoNormal><SPAN style="FONT-SIZE: 11pt; COLOR: rgb(31,73,125)"> </SPAN></P>
<DIV>
<DIV style="BORDER-RIGHT: rgb(181,196,223); PADDING-RIGHT: 0in; BORDER-TOP: rgb(181,196,223) 1pt solid; PADDING-LEFT: 0in; PADDING-BOTTOM: 0in; BORDER-LEFT: rgb(181,196,223); PADDING-TOP: 3pt; BORDER-BOTTOM: rgb(181,196,223)">
<P class=MsoNormal><B><SPAN style="FONT-SIZE: 10pt">From:</SPAN></B><SPAN style="FONT-SIZE: 10pt"> <A href="mailto:equest-users-bounces@lists.onebuilding.org" target=_blank rel=nofollow ymailto="mailto:equest-users-bounces@lists.onebuilding.org">equest-users-bounces@lists.onebuilding.org</A> [mailto:<A href="mailto:equest-users-bounces@lists.onebuilding.org" target=_blank rel=nofollow ymailto="mailto:equest-users-bounces@lists.onebuilding.org">equest-users-bounces@lists.onebuilding.org</A>] <B>On Behalf Of </B>Paul Brooks<BR><B>Sent:</B> Friday, May 07, 2010 9:26 AM<BR><B>To:</B> Carol Gardner 
<DIV class=im><BR><B>Cc:</B> <A href="mailto:equest-users@lists.onebuilding.org" target=_blank rel=nofollow ymailto="mailto:equest-users@lists.onebuilding.org">equest-users@lists.onebuilding.org</A><BR></DIV>
<DIV>
<DIV></DIV>
<DIV class=h5><B>Subject:</B> Re: [Equest-users] Complex chiller/heat recovery/heat pump to model question</DIV></DIV></SPAN></DIV></DIV>
<DIV>
<DIV></DIV>
<DIV class=h5>
<P class=MsoNormal> </P>
<DIV>
<DIV>
<P class=MsoNormal>Yes, I did.</P></DIV>
<DIV>
<P class=MsoNormal> </P></DIV>
<DIV>
<P class=MsoNormal>Yes, it is an air-cooled Trane Chiller that has total energy recovery.  It is a non-US product, made by Trane in Europe.  </P></DIV>
<DIV>
<P class=MsoNormal> </P></DIV>
<DIV>
<P class=MsoNormal>The concept is that the chiller provids chilled water, and the energy recovery side provides hot water for reheat at VAV boxes when needed.</P></DIV>
<DIV>
<P class=MsoNormal> </P></DIV>
<DIV>
<P class=MsoNormal>In addition, there are two heat pumps (reversible chillers as the liturature says)that will pprovide additional capacity to etther the chilled water loop or the hot water loop as needed.</P></DIV>
<DIV>
<P class=MsoNormal> </P></DIV>
<DIV>
<P class=MsoNormal>This is for a 110,000 sf high end office building in Uruguay.  Uruguay is ASHRAE climate zone 3, similar to the US southeast, primarily Georga/northern Florida.</P></DIV>
<DIV>
<P class=MsoNormal> </P></DIV>
<DIV>
<P class=MsoNormal>Links to product information:</P></DIV>
<DIV>
<P class=MsoNormal>  </P></DIV>
<DIV>
<P class=MsoNormal>Chiller with energy recovery:  http://doc.trane-eur.com/marketing/cdtrane.nsf/PdfByName/RLC-PRC026-E4_1205.pdf/$file/RLC-PRC026-E4_1205.pdf</P></DIV>
<DIV>
<P class=MsoNormal> </P></DIV>
<DIV>
<P class=MsoNormal>Heat pumps:  http://doc.trane-eur.com/Marketing/CdTrane.nsf/PdfByName/CG-PRC015-E4_0708.pdf/$file/CG-PRC015-E4_0708.pdf</P></DIV>
<DIV>
<P class=MsoNormal> </P></DIV>
<DIV>
<P class=MsoNormal>I am thinking i will need to do a lot of hand calcs for energy use of the chiller and how much "free" heating water I will get.  the hard part is going to be how to account for saving by not running condenser fans.  Yes, it will be a challenge to get it through GBCI review, but if the logic is sound, it will not be that hard.</P></DIV>
<DIV>
<P class=MsoNormal> </P></DIV>
<DIV>
<P class=MsoNormal>Any suggestions on how to wet up a model in eQuest to minimize amount of hand calculations?</P></DIV>
<DIV>
<P class=MsoNormal><BR> </P></DIV>
<DIV>
<P class=MsoNormal> </P>
<DIV>
<DIV class=MsoNormal style="TEXT-ALIGN: center" align=center><SPAN style="FONT-SIZE: 10pt">
<HR align=center width="100%" SIZE=1>
</SPAN></DIV>
<P class=MsoNormal style="MARGIN-BOTTOM: 12pt"><B><SPAN style="FONT-SIZE: 10pt">From:</SPAN></B><SPAN style="FONT-SIZE: 10pt"> Carol Gardner <<A href="mailto:cmg750@gmail.com" target=_blank rel=nofollow ymailto="mailto:cmg750@gmail.com">cmg750@gmail.com</A>><BR><B>To:</B> Paul Brooks <<A href="mailto:equestpaul@yahoo.com" target=_blank rel=nofollow ymailto="mailto:equestpaul@yahoo.com">equestpaul@yahoo.com</A>><BR><B>Cc:</B> <A href="mailto:equest-users@lists.onebuilding.org" target=_blank rel=nofollow ymailto="mailto:equest-users@lists.onebuilding.org">equest-users@lists.onebuilding.org</A><BR><B>Sent:</B> Fri, May 7, 2010 1:54:56 AM<BR><B>Subject:</B> Re: [Equest-users] Complex chiller/heat recovery/heat pump to model question<BR></SPAN><BR>It looks like you stunned everyone into silence, Paul.<BR><BR>So you have 1) an air cooled chiller, 2) heat recovery sending HW to only your reheat coils, 3) 2 air cooled heat pumps that can also provide
 cool or hot water to circulation loops, 4)  french hens, and a partridge in a pear treee...OOPS, its late!<BR><BR>This looks like entropy to me. Try once more to share all of this. I would suggest an itemized list that identifies the equipment type, it's specific use, it's model no. etc. and any comments. Maybe an excel spreadsheet would work best. <BR><BR>Another issue: this project will be neigh on impossible for a LEED reviewer to review, too. That is neither good or bad, it just is. <BR><BR>I will help you as I can, when I can, but I must work for food too. Nobody pays me, yet, to help anyone.<BR><BR>Keep the faith,<BR>Carol</P>
<DIV>
<P class=MsoNormal>On Thu, May 6, 2010 at 1:47 PM, Paul Brooks <<A href="mailto:equestpaul@yahoo.com" target=_blank rel=nofollow ymailto="mailto:equestpaul@yahoo.com">equestpaul@yahoo.com</A>> wrote:</P>
<DIV>
<DIV>
<DIV>
<P class=MsoNormal>I am modeling a building in Uruguay that has a Trane 165 ton Air cooled chiller, (RTAD 165 SE, not available in US.)  In addition to air-cooling, the chiller has a heat exchanger to recover heat for whatever use you want.   Obviously the heat recovery means that in the right condisitons the condenser fans will not run as much.</P></DIV>
<DIV>
<P class=MsoNormal> </P></DIV>
<DIV>
<P class=MsoNormal>For this application, the heat is to be recovered to provide heating hot water VAV box re-heat coils.  In addition to this, there are two air cooled heat pumps (CXAN 214, not available in US) that are available to augment the chiller or the hot wateer loop.</P></DIV>
<DIV>
<P class=MsoNormal> </P></DIV>
<DIV>
<P class=MsoNormal>So, my dilemma, is how to model this in eQuest. I am still more or less a novice user.  I am in the detail mode, and see that I can do some things with condenser water, but then how do I model the condenser fans?  How do I tie in the heat pump loops?</P></DIV>
<DIV>
<P class=MsoNormal> </P></DIV>
<DIV>
<P class=MsoNormal>Lastly, this is a LEED model.  So, any thoughts on how to get data and then do hand calcs to prove savings are also welcome.    </P></DIV>
<DIV>
<P class=MsoNormal> </P></DIV>
<DIV>
<P class=MsoNormal>Thanks!</P></DIV>
<DIV>
<P class=MsoNormal> </P></DIV>
<DIV>
<P class=MsoNormal>If interestede in seeing info on the equipment, go to <A href="http://trane-eur.com/" target=_blank rel=nofollow>Trane-eur.com</A>.  information is available in english for these models. Your local trane rep will probably not be able to help.</P></DIV></DIV>
<P class=MsoNormal> </P></DIV>
<P class=MsoNormal style="MARGIN-BOTTOM: 12pt"><BR>_______________________________________________<BR>Equest-users mailing list<BR>http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org<BR>To unsubscribe from this mailing list send  a blank message to <A href="mailto:EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG" target=_blank rel=nofollow ymailto="mailto:EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG">EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG</A></P></DIV>
<P class=MsoNormal> </P></DIV></DIV></DIV>
<P class=MsoNormal> </P></DIV></DIV></DIV></DIV><BR>_______________________________________________<BR>Equest-users mailing list<BR><A href="http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org" target=_blank rel=nofollow>http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org</A><BR>To unsubscribe from this mailing list send  a blank message to <A href="mailto:EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG" target=_blank rel=nofollow ymailto="mailto:EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG">EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG</A><BR><BR></BLOCKQUOTE></DIV><BR>
<DIV id=avg_ls_inline_popup style="DISPLAY: inline; VISIBILITY: hidden"></DIV>
<STYLE type=text/css>#avg_ls_inline_popup {padding:0px 0px;margin-left:0px;margin-top:0px;width:240px;overflow:hidden;word-wrap:break-word;color:black;font-size:10px;text-align:left;line-height:13px;}</STYLE>

<META http-equiv=x-dns-prefetch-control content=on></DIV></DIV></div><br>







      </body></html>