<DIV><FONT face=Arial size=2>Dear All,</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT> </DIV>
<DIV><FONT face=Arial size=2>In my project with chiller / boiler / fan coil
units combination, I am getting the following warning message:</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT> </DIV>
<DIV><FONT face=Arial size=2>Loop: circLoopTwoPipe
heating capacity is smaller than the secondary demand. Primary= -1569000.
Secondary= -5169419.</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT> </DIV>
<DIV><FONT face=Arial size=2>Here, the primary value is the capacity of my
boiler that I entered.</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT> </DIV>
<DIV><FONT face=Arial size=2>The fan coil system is two pipe and I have one
primary and 5 secondary loops serving the system. For the secondary loops I do
not get any warnings.</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT> </DIV>
<DIV><FONT face=Arial size=2>When I look at the PS-D Circulation Loop Loads
report, I see that for this primary loop my SUM value is -1011 (MBTU) for
heating. The peak value is -4414 (KBTU/Hr). </FONT></DIV>
<DIV><FONT face=Arial size=2></FONT> </DIV>
<DIV><FONT face=Arial size=2>Obviously eQuest does not like the capacity of the
boiler. However, this is a proposed design and the system is quite sufficient.
Why would the secondary demand on the circLoopTwoPipe be so high?</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT> </DIV>
<DIV><FONT face=Arial size=2>Thanks,</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT> </DIV>
<DIV><FONT face=Arial size=2>Ömer Moltay, LEED AP<BR>Mimta Ltd.<BR>Hekimsuyu