<BODY contentEditable=true onload=parent.init()><P>Were there any replies to this?  Are there any sample input files that show how to use the PV input forms, explain what the input fields mean, and how the results are calculated?  Has the eQUEST PV analysis and resuls been checked with other PV programs?</P>
<P>Attached are results for a building that has PV and GSHP.  It uses a simplified layout of the CCGT LEED Platinum building. The questions are in italics (PV in red and GSHP in blue).  The options to look at are 4 and 4a (PV Surface and Shade Mount) and 5 and 5b (GSHP 200'-8x4 and 100'-2x2).  The original analysis was with DOE2.1E.  About 10% (I think) of the direct solar (light with CC) energy was assumed to be converted to 110V electricity since DOE2 did not have PV analysis.</P>
<P>I can send the input files to anyone who is willing to check them.</P>
<P>V. Thomas</P>
<P> </P></BODY>