<div>I am modeling a school that is going for LEED and currently having trouble when trying to have it comply. The building is in CA and needs to meet the T-24 compliance as well. When I run the compliance analysis, it does not comply because of the wall and roof construction were not checked off in the detailed mode. However, when I check off the T-24 in the detailed mode, the compliance report drastically changes from 15% under to about 10% over. The material in both the wizard and detailed mode are the same. Am I inputing this data correctly?</div>
<div>Thanks for your help,</div>
<div>Steven Rutter</div>