<div dir="ltr">Dear all,<br><br>I get 12 pages of the following warnings in my SIM file's 'ATTN Simulation Messages for Review' page. I'd appreciate if someone can explain what it means, how severe the problem is and what can be done to fix it. <br>
<br><br><span class="HcCDpe">**WARNING**********************************************************************<br> Zone: EL1 NNW Perim Zn (G.NNW3) could not successfully<br> allocate all equipment energy to the 5-minute bins<br>
because of an equipment overload. The peak load<br> used in ECONOMICS will not include the fraction due<br> to the overload, but the PLANT reports will.<br> Mon/Day/Hour: 1 1 4 Energy: 87.3 Unallocated: 4.821<br>
</span><br clear="all">Thanks,<br><br>RAMANA KOTI Assoc. ASHRAE LEED® AP <br>Sustainable Building Analyst<br><br>ELEMENTS division of BNIM architects<br>106 West 14th Street Suite 200<br>Kansas City Missouri 64105<br><br>
d 816.783.1635 f 816.783.1501<br><a href="http://bnim.com">bnim.com</a> | <a href="http://elements.bnim.com">elements.bnim.com</a> <br><br>
</div>