[Equest-users] e-Quest doubt

Anthony Hardman anthony at greenengineer.com
Fri Mar 1 14:10:09 PST 2019


This is just saying that your simulated fan demand never reaches the design day values (probably calculated by different engineers, using different assumptions and different software) shown on mechanical schedules.  Take a look at your SS-L reports and you’ll be able to see what your fans are doing relative to design day conditions.

Anthony Hardman, PE, BEAP, LEED AP BD&C
Senior Building Performance Analyst, Owner
The Green Engineer
Sustainable Design Consulting
23 Bradford Street, 1st Floor, Concord, MA 01742
Direct: 978.341.5459  |  Office: 978.369.8978
E: anthony at greenengineer.com<mailto:anthony at greenengineer.com>


Web<https://www.greenengineer.com/> | Twitter<https://twitter.com/thegreeneng/> | LinkedIn<https://www.linkedin.com/company/the-green-engineer-llp/> | Facebook<https://www.facebook.com/The-Green-Engineer-Inc-112879628748247/?ref=bookmarks> | Subscribe to Mixed Greens <http://eepurl.com/daO9Xr>

From: Balaji Jaishankar [mailto:bjaishankar at mepcinc.com]
Sent: Friday, March 1, 2019 12:25 PM
To: equest-users at lists.onebuilding.org
Subject: [Equest-users] e-Quest doubt

We are modelling a typical office building with multiple shells in e-Quest.
1)      The fan demand in the “Performance output tab” which is obtained from “PS-E Energy End use summary “ is less compared to the Fan design input in “ Air side HVAC tab which is obtained through “ SV-A System Design Parameters” report.
This henceforth creates a flag in the final performance outputs tab which reads “The fan demand ( as reported from performance outputs tab) for the baseline and or proposed exceeds the fan power as reported from “ Air side HVAC tab”.

Please advise on where we could be going wrong with the inputs that we are seeing this difference in both proposed and baseline models. Fan curves are as per ASHRAE 90.1 using method 2 of table G3.1.3.15


Balaji Jaishankar, LEED AP BD+C, EMIT | Energy Engineer       [MEPC Logo] <http://www.mepcinc.com/>


MCGUIRE ENGINEERS
300 SOUTH RIVERSIDE PLAZA, SUITE 1650
CHICAGO, IL 60606 | 312.930.2230 | MEPCINC.COM | [LinkedIn] <http://www.linkedin.com/company/mcguire-engineers>

CELEBRATING OVER THIRTY YEARS IN BUSINESS

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20190301/f0279dc5/attachment-0001.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 3896 bytes
Desc: image001.jpg
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20190301/f0279dc5/attachment-0006.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.png
Type: image/png
Size: 176 bytes
Desc: image002.png
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20190301/f0279dc5/attachment-0003.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image003.jpg
Type: image/jpeg
Size: 1634 bytes
Desc: image003.jpg
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20190301/f0279dc5/attachment-0007.jpg>


More information about the Equest-users mailing list