Hello Beran,

 

I agree with Christopher, 

 

I have done this before and had no problems,

 

 

 



Ingeniera Paula Andrea Hernández LEED  AP (BD +C)

Capitulo Argentino de ASHRAE Board Member -  Region XII MP RVC

 

Estudio Ingeniero Mario Pedro Hernández

Tel./Fax: 4302-9561 Tel.: 4303-3481

Av. Montes de Oca 1103 5º D - C.A.B.A.

Web Site:  <http://www.mphingenieria.com.ar/> www.mphingenieria.com.ar

e-mail: paulahernandez4 at fibertel.com.ar <mailto:mphingenieria at fibertel.com.ar> 

 

De: Equest-users [mailto:equest-users-bounces at lists.onebuilding.org] En nombre de Chris Jones via Equest-users
Enviado el: viernes, 16 de diciembre de 2016 04:20 p.m.
Para: Beran Gurtekin Celik <beran at buildingintelligencegroup.com>
CC: equest-users at onebuilding.org
Asunto: Re: [Equest-users] ASHRAE 90.1 baseline HVAC system interpretation

 

My usual interpretation in this type of situation is that the café will have occupants when the gym is unoccupied and I apply the exception – one system for the Gym and one system for the café. 

 

 


 <http://www.rwdi.com/assets/logos/RWDI-logo.gif> 

Christopher Jones, P.Eng. | Senior Energy Analyst
RWDI
901 King Street West, Suite 400, Toronto, ON M5V 3H5 Canada
Tel: (519) 823-1311 ext 2052 | Mobile: (416) 697-0056
 <http://www.rwdi.com/> rwdi.com

 

 

From: Equest-users [mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of Beran Gurtekin Celik via Equest-users
Sent: Friday, December 16, 2016 11:54 AM
To: equest-users at lists.onebuilding.org <mailto:equest-users at lists.onebuilding.org> 
Subject: [Equest-users] ASHRAE 90.1 baseline HVAC system interpretation

 

 

Hi all,

 

I am puzzled with the interpretation of Ashrae 90.1-2007 G3.1.1 where is says each floor shall be modeled with a separate HVAC system. 

 

My proposed building is a 4 story office building with 3 floors office and a first floor consisted of cafeteria, kitchen and gym. Office floors have one system per floor and the first floor has three systems for each specific area. My baseline is using system 6 for the typical office floors. I am trying to interpret the G3.1.1 for the first floor. If I combine all those areas into one system their occupancy schedules, HVAC schedules, OA rates etc are all different and if I use one system, the schedules will not match the proposed. The kitchen qualifies for exception b due to thermal loads, so I will use a single zone system for that area. I am wondering how I should approach the gym and cafeteria. Can I use two systems in the baseline for those areas? They do not fall into exception b since their schedules and loads do not differ significantly from other spaces (office spaces) but they do differ from each other and using one system for those two different usage areas brings the dilemma of using a different schedule from the proposed building. 

 

Any insights will be greatly appreciated.




Regards,

Beran

 

 

 

 

 

  _____  

RWDI - A Platinum Member of Canada's 50 Best Managed Companies 
This communication is intended for the sole use of the party to whom it was addressed and may contain information that is privileged and/or confidential. Any other distribution, copying or disclosure is strictly prohibited. If you received this email in error, please notify us immediately by replying to this email and delete the message without retaining any hard or electronic copies of same. Outgoing emails are scanned for viruses, but no warranty is made to their absence in this email or attachments. If you require any information supplied by RWDI in a different format to facilitate accessibility, contact the sender of the email, email solutions at rwdi.com <mailto:solutions at rwdi.com>  or call +1.519.823.1311. 

  _____  

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20170111/993db556/attachment-0005.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.jpg
Type: image/jpeg
Size: 3723 bytes
Desc: not available
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20170111/993db556/attachment-0004.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image003.jpg
Type: image/jpeg
Size: 2227 bytes
Desc: not available
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20170111/993db556/attachment-0005.jpg>


More information about the Equest-users mailing list