[Equest-users] unmet heating load hours
Tim Burke via Equest-users
equest-users at lists.onebuilding.org
Thu Apr 27 14:50:15 PDT 2017
I have a Costco warehouse equest model with 4 unmet heating load hours in my proposed model with zero in my baseline budget model. I need to be able to tweak my model to get rid of these unmet load hours but minor tweaks don't seem to make a difference. Could there be something wrong with the model that results in having a few unmet load hours that are hard to get rid of?
Tim Burke
T.E., Inc.
830 North Riverside Drive #200
Renton, WA. 98057
(425) 970-3753 Phone
(425) 970-3756 Fax
WWW.TEI-ENGINEERING.COM<http://www.tei-engineering.com/>
This message contains information that is confidential or privileged. The information is intended for the use of the individual or entity named above. If you are not the intended recipient, be aware that any disclosure, copying, distribution or use of the contents of this information is prohibited. If you have received this electronic transmission in error, please notify the sender and delete this message and any attachments
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20170427/961998cc/attachment-0004.htm>
More information about the Equest-users
mailing list