[Equest-users] FW: DOE2 Batch Processing Error

Daniel Knapp danielk at arborus.ca
Fri Feb 5 11:04:53 PST 2016


Try copying the eQUEST library file (from \Documents\eQUEST 3-65 Data\DOE-2\Usrlib.dat) to the DOE2 directory (C:\doe22\exent\USRLIB.dat). 

—
Daniel Knapp PhD, P Phys, LEED AP O+M
danielk at arborus.ca

Energy Efficiency Expert
Arborus Consulting
76 Chamberlain Ave
Ottawa ON K1S 1V9
(613) 234-7178

> On Feb 5, 2016, at 1:04 PM, Drew Morrison <DMorrison at seventhwave.org> wrote:
> 
> Hi Everyone,
>  
> I’ve got an issue trying to run DOE-2.2 models from the command prompt using the batch processing script. The .inp file is rather large (about 47,000 lines) and I’m hoping to get the simulations to run a little faster by bypassing the eQuest interface. I’d like to thank Ben Brannon and Joe Huang for this thread (http://energy-models.com/forum/run-equest-file-command-line-doe2 <http://energy-models.com/forum/run-equest-file-command-line-doe2>) which helped me get started.
>  
> I’m able to run the doe22.bat script, but I’m getting an error when the script runs DOEBDL. When I open up the BDL file, I get a series of errors in the exterior construction layers which say “Symbol Previously Undefined”, which seem to be in reference to the materials which compose the layers. However, the layers all come directly from the DOE-2 library files.
>  
> Is there some reference to the library files I need to establish or have missed? Right now I have the .inp file in C:\doe22, the same directory as the doe22.bat file. I’ve attached the .inp file I’m trying to process, and below are excerpts from my command line and the BDL file generated when I executed the script.
>  
> Thanks,
> Drew
>  
>  
> **** Command Line Screen Shot ****
> <image001.png>
>  
> ***** BDL File Error Text *****
>  
>      * 235 * "H2Roof Cons Layers" = LAYERS
>      * 236 *    MATERIAL         = ( "Blt-Up Roof 3/8in (BR01)", "Polyurethane 1 1/2in",
> *ERROR********************************************************** ====================== ******SYMBOL PREVIOUSLY UNDEFINED
>      * 237 *          "Plywd 5/8in (PW04)", "H2Roof Cons Mat 4 (31.52)" )
>      * 238 *    ..
>      *   1 * $LIBRARY-ENTRY Plywd 5/8in (PW04)              MAT             Plywood
>      *   2 * $Plywood, 5/8 Inch
>      *   3 *  TYPE=PROPERTIES TH=0.0521 COND=0.0667 DENS=34.0 S-H=0.29  ..
> *ERROR****************************************************************************************
> *ERROR*****MATERIAL Layer position number 3 is incomplete or undefined
>  
> Drew Morrison, Energy Engineer
> Seventhwave
> 608.210.7151 seventhwave.org <http://seventhwave.org/>
>  
> <ComplicatedBldg.BDL><ComplicatedBldg.inp>_______________________________________________
> Equest-users mailing list
> http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org <http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org>
> To unsubscribe from this mailing list send  a blank message to EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG <mailto:EQUEST-USERS-UNSUBSCRIBE at onebuilding.org>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20160205/2667044b/attachment-0005.htm>


More information about the Equest-users mailing list