[Equest-users] GSHP with Displ. Vent. & Radiant/Baseboard
    Brian Smith 
    brians at murraypc.com
       
    Fri Nov  8 13:13:12 PST 2013
    
    
  
Any help would be great, Didnt mention but this is also a LEED project 
 
Thanks
Brian
 
 
From: Brian Smith [mailto:brians at murraypc.com] 
Sent: Wednesday, November 06, 2013 4:27 PM
To: gutschow at coffman.com; equest-users at lists.onebuilding.org
Cc: 'Roger Smith'
Subject: [Equest-users] GSHP with Displ. Vent. & Radiant/Baseboard
 
Hey,
 
I'm try to model a Library that will use displacement ventilation being
supplied at about 64F and then the radiant/baseboard heat picking up to rest
of the load to 69F. Read through some eQuest design guides to model the
displacement ventilation to satisfactory results. I ultimately had to use a
PSZ system while I would have preferred to use a single zone reheat system
SZRH or better yet Const-Volume Reheat System RHFS i could make those not
error.  Any luck?
 
Here's my biggest problem though. . .
I used hot water baseboards to approximate the radiant:-(. Everything was
going well until it was decided that for this cost estimate we wanted to
model the system as having both the heating coil and radiant/baseboard hw as
being 100% supplied by the ground source HP system. I cant figure out that
at all? eQuest wants to put the baseboards on a hw loop with boiler and will
error when I try  to put it on a water loop heat pump loop.
 
Any experince or help with doing this would be great
 
Thanks
Brian Smith, Mechanical Design Engineer
Murray & Associates, P.C.
T/907.780.6151 F/907.780.6182
www.murraypc.com
 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20131108/e7e3ceee/attachment.htm>
    
    
More information about the Equest-users
mailing list