[Equest-users] equest/leed 3.0 question
Patrick J. O'Leary, Jr.
poleary1969 at gmail.com
Wed Mar 23 12:16:04 PDT 2011
i am looking at the leed "EAp2 Section 1.4 tables.xls" file for a leed
3.0 project & there is a section for "Model Input Parameter/Energy
Efficiency Measure" for the baseline and proposed case feeder voltage
drop and branch circuit voltage drop.
has anyone filled this out yet? to the best of my knowledge these are
not items than can be input into equest. or hap. or trace. both are
calculations based on the run from the service entrance to the breaker
panel(s) and the longest run to an electrical load from the breaker
panel(s) (the branch drop).
regards,
patrick
More information about the Equest-users
mailing list