[Equest-users] warehouse supplemental supply fans
Will Mak
wmak at epsteinglobal.com
Wed Jan 19 08:42:53 PST 2011
Hello all,
I am working on an energy model for a warehouse in Dallas, TX. The design intent of the warehouse area required 1 air change per hour during the summer. The fans are suppose to operate simultaneously as makeup units that serve the warehouse. Therefore, 10 make up air units and 10 supply fans serve the warehouse area to meet this air change requirement. Modeling the makeup air units can be done by eQuest but I am curious how I should incorporate the supplement supply fans?
Thanks!
William Mak, LEED Green Associate
Mechanical Design Engineer
EPSTEIN
Architecture
Interiors
Engineering
Construction
600 West Fulton Street
Chicago, Illinois 60661-1259
D: (312) 429-8116
F: (312) 559-1217
E: wmak at epsteinglobal.com <mailto:wmak at epsteinglobal.com>
W: www.epsteinglobal.com <http://www.epsteinglobal.com/>
þ Epstein is a firm believer in sustainability. We ask that you please consider the environment before printing this e-mail.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20110119/b76a821a/attachment.htm>
More information about the Equest-users
mailing list