[Equest-users] Crankcase heating in Appendix G
jacob goodman
jacobg at lseng.com
Tue Jan 4 08:00:47 PST 2011
I am working on a reply to some LEED reviewer questions regarding crank
case heating for a PSZ-AC system type for a LEED building. The project
is registered under 90.1 - 2004. The eQuest system type "Packages single
zone" defaults to 0.5 kW of crank case heating which I left in both
models since my proposed model uses the same type system and crankcase
in necessary in the northwest.
The reviewer commented that "because Appendix G does not explicitly
address crankcase heating, it should not be modeled in the baseline
case". This seems to imply that if it is included in the installed units
it need to be in the proposed model, but I need to remove it from the
baseline causing an unfair energy difference.
I didn't find any CIR's, but does anyone have any suggestions?
--
Jacob Goodman , LEED AP, Green Building Specialist
v:509.280.7051 i:www.lseng.com <http://www.lseng.com>
L&S Engineering Associates, Inc.
'High Performance Design'
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20110104/0d54ef0b/attachment.htm>
More information about the Equest-users
mailing list