[Equest-users] Unmet load hours
    John Aulbach 
    jra_sac at yahoo.com
       
    Wed Apr 29 11:06:19 PDT 2009
    
    
  
Erik:
 
Are thoses loads actually active at 100% in the Design Day routine? Check your schedules.
 
John
--- On Wed, 4/29/09, Erik Moore <Erik.Moore at arup.com> wrote:
From: Erik Moore <Erik.Moore at arup.com>
Subject: [Equest-users] Unmet load hours
To: equest-users at lists.onebuilding.org
Date: Wednesday, April 29, 2009, 3:04 AM
Hi there, I am leaving  the systems (FC and SZRH) in the building to
self size. After simulating I've noticed that the zonal loads have a
number of hours that are unmet; and after looking through the SIM file I
have noted that the self sizing calculation (design day, report LS-B) is
not registering the equipment load in the affected spaces (even though
it is shown in the space loads, report LV-B).
Is there any way that I can force DOE to recognise these loads or do you
know if there is a specific reason that it is overlooking them?
Thanks in advance, Erik
____________________________________________________________
Electronic mail messages entering and leaving Arup  business
systems are scanned for acceptability of content and viruses
_______________________________________________
Equest-users mailing list
http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org
To unsubscribe from this mailing list send  a blank message to EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG
      
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20090429/3918a8a4/attachment.htm>
    
    
More information about the Equest-users
mailing list