<div dir="ltr"><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small;color:#0c343d">Hi Chris.</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small;color:#0c343d">I just developed a similar simulation.</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small;color:#0c343d"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small;color:#0c343d">If the LEED project has been registered after March 1, 2024, you must follow the v4 2024 Update. Projects registered before March 1, 2024 are subject to the original v4 criteria.</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small;color:#0c343d"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small;color:#0c343d"><b><u>Envelope:</u></b></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small;color:#0c343d"><ul><li><b>v4 2024 Update:</b> <a href="https://www.usgbc.org/credits/IDC/v4/ea403/2024update?return=/credits/Commercial%20Interiors/v4/Energy%20&%20atmosphere">https://www.usgbc.org/credits/IDC/v4/ea403/2024update?return=/credits/Commercial%20Interiors/v4/Energy%20&%20atmosphere</a>. Comparison against a baseline tenant project that complies with Standard 90.1–2010, Appendix G, with errata but without addenda (or a USGBC-approved equivalent standard outside the U.S.). Baseline envelope parameters must be modeled as “New Construction” according to Table G3.1(5) (baseline), Sections a–e. Alternatively, projects documented with existing conditions prior to renovation per Table G3.1(5)(baseline) Section f shall demonstrate an 8% minimum improvement in proposed performance rating compared with the baseline performance rating.</li><li><b>Original v4 criteria:</b> <a href="https://www.usgbc.org/credits/commercial-interiors-hospitality-commercial-interiors/v4/ea104">https://www.usgbc.org/credits/commercial-interiors-hospitality-commercial-interiors/v4/ea104</a>. The baseline project envelope must be modeled according to Table G3.1(5) (baseline), Sections a–e, and not Section f. Document the energy modeling input assumptions for unregulated loads.</li></ul></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small;color:#0c343d"><u style="font-weight:bold">HVAC:</u> The following data are exposed on the LEED Reference guide:<br></div><div class="gmail_default" style=""><h1 style="color:rgb(0,0,0);font-family:"Source Sans Pro",sans-serif;font-size:26px;box-sizing:border-box;margin-top:0px;margin-bottom:0.5rem;line-height:36px">Contribution of Base Building HVAC and Service Water-Heating Systems</h1><span style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px">In many projects, a portion of a base building HVAC system serves the project’s tenant space. To allocate a percentage of that HVAC system to the tenant area, use whichever of the following two methods is more appropriate. Method 1 is applicable when the additional spaces served by the HVAC or service water heating system have similar occupancies to the project space, provided the resulting unmet load hours for the proposed design do not exceed the amount allowed by ASHRAE 90.1.</span><ul style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px;box-sizing:border-box;margin-top:0px;margin-bottom:1rem"><li style="box-sizing:border-box">Determine the total square footage (square meters) served by the HVAC or service water-heating system.</li><li style="box-sizing:border-box">Determine the project floor area served by the HVAC or service water-heating system.</li><li style="box-sizing:border-box">For air-handling units, determine the design supply airflow, design fan power, design heating capacity, design cooling capacity, and outdoor airflow. For central service water heaters or thermal energy plants (e.g., steam, hot water, or chilled water) located in the building, determine the chiller or boiler quantities and capacities, storage tank volumes as applicable, pump design supply volume for each pump as applicable, heat rejection fan power, and any other pertinent parameters relative to HVAC system capacities.</li><li style="box-sizing:border-box">Determine the relative contribution of the HVAC or service water-heating system to the project floor space by applying the project floor space ratio to each design parameter (design supply airflow, design fan power, design heating capacity, design cooling capacity, outdoor airflow, chiller capacity, service water heating storage volume, or pump capacity):</li></ul><div class="gmail-center-content" style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px;box-sizing:border-box">Adjusted parameter = Parameter x Project area served by system / Total area served by system</div><ul style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px;box-sizing:border-box;margin-top:0px;margin-bottom:1rem"><li style="box-sizing:border-box">Model the HVAC or service water-heating system based on the actual design conditions and sequence of operations, but use the adjusted parameters as calculated above.</li></ul><span style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px">Method 2 is applicable when the other spaces served by the air-handling unit have dissimilar occupancies to the project space.</span><ul style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px;box-sizing:border-box;margin-top:0px;margin-bottom:1rem"><li style="box-sizing:border-box">For air-handling units, determine the design supply airflow, design fan power, design heating capacity, design cooling capacity, and outdoor airflow. For central thermal energy plants or service water heaters located in the building, determine the chiller or boiler quantities and capacities, storage tank volumes as applicable, pump design supply volume for each pump as applicable, heat rejection fan power, and any other pertinent parameters relative to HVAC system capacities.</li><li style="box-sizing:border-box">Determine the percentage allocation of HVAC or service water heating capacity to the project space, using the following equations. % allocation = Airflow allocated to project space / Total design supply airflow % allocation = Chilled water capacity allocated to project space / Total chilled water capacity</li><li style="box-sizing:border-box">Example: A dedicated outside air system supplies the entire building, and VAV boxes distribute the outside air to each tenant space. The team makes the calculation as follows: % allocation = [AHU design supply flow] / [Sum of all VAV box peak design flows] x [VAV box peak design flow for project space]</li><li style="box-sizing:border-box">Provide documentation from the base building’s owner identifying the airflow and/or thermal capacity allocated to the project space versus the total design supply airflow and/or thermal capacity. Justify this percentage allocation in a narrative.</li><li style="box-sizing:border-box">Identify the different occupancies, by type and square footage (square meters), served by the air-handling unit or thermal energy system.</li><li style="box-sizing:border-box">In ASHRAE 90.1 User’s Manual or ASHRAE 62.1, look up default assumptions for the other occupancies’ lighting loads, ventilation, occupancy, etc. Use these values to determine (per square foot or square meter) the peak heating and cooling loads, design supply air volume, and design outside air volume for the other occupancies:</li></ul><div class="gmail-center-content" style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px;box-sizing:border-box">Total load = Sum [(Design load/ft2) x (Area)]</div><div class="gmail-center-content" style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px;box-sizing:border-box">Adjusted parameter = Parameter x Total project area served by AHU or thermal system / Total area served by AHU or thermal system</div><ul style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px;box-sizing:border-box;margin-top:0px;margin-bottom:1rem"><li style="box-sizing:border-box">Model the air-handling unit or thermal energy system based on the actual design conditions, but use the adjusted parameters as calculated above.</li></ul><div style=""><font color="#212529" face="Source Sans Pro, sans-serif"><span style="font-size:16px"><br></span></font></div><div style=""><font color="#212529" face="Source Sans Pro, sans-serif"><span style="font-size:16px"><br></span></font></div><div style=""><h5 style="box-sizing:border-box;margin-top:0px;margin-bottom:0.5rem;line-height:28px;font-size:18px;color:rgb(0,0,0);font-family:"Source Sans Pro",sans-serif">Central Plant or District Energy Systems</h5><span style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px">If the base building is served by a central thermal energy plant or a district thermal energy system and the project is following Option 1, the team may demonstrate compliance with EA Prerequisite Minimum Energy Performance and EA Credit Optimize Energy Performance by using Path 1, ASHRAE 90.1–2010, Appendix G; Path 2, Full DES or central plant performance accounting; or Path 3, Streamlined DES modeling. </span><em style="box-sizing:border-box;color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px">Scope of DES equipment inclusion.</em><span style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px"> Downstream equipment (e.g., heat exchangers, steam pressure reduction stations, pumps, valves, pipes, controls) may not be located in a commercial interiors project, but when present, all such equipment must be included consistently in the scope of EA Prerequisite Minimum Energy Performance and EA Credit Optimize Energy Performance. Upstream equipment is included or excluded depending on the chosen compliance path. The proposed design for any building air distribution systems, ground source heat pump loops, or water source heat pump loops must still be modeled consistent with Method 1 or 2 (see </span><em style="box-sizing:border-box;color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px"><a class="gmail-linknavCol" href="https://www.usgbc.org/credits/commercial-interiors-hospitality-commercial-interiors/v4/ea104?view=guide#" style="box-sizing:border-box;color:rgb(0,146,159);background-color:transparent;text-decoration-line:none">Further Explanation, Contribution of Base Building HVAC and Service Water Heating Systems).</a></em><span style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px"> </span><em style="box-sizing:border-box;color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px">Energy simulation versus postprocessing.</em><span style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px"> Whenever possible, incorporate system and equipment performance parameters directly into the energy simulation. Potential methods include developing efficiency curves and scheduling equipment operation and curves. Postprocessing of DES performance is acceptable if reasonable simulation methods are not available or are too onerous. All postprocessing methodologies must be fully documented.</span><h5 style="box-sizing:border-box;margin-top:0px;margin-bottom:0.5rem;line-height:28px;font-size:18px;color:rgb(0,0,0);font-family:"Source Sans Pro",sans-serif">Path 1. ASHRAE 90.1–2010, Appendix G</h5><span style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px">Model the proposed and baseline designs using purchased energy according to ASHRAE 90.1–2010, Appendix G. The project may be modeled using purchased energy even if the building’s central plant generates the thermal energy for the project space. </span><em style="box-sizing:border-box;color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px">Energy rates</em><span style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px"> All virtual DES energy rates must be identical in the baseline and proposed cases. If tariffs or rates are not available from the district plant servicing the project, such as campus or military plants, or for central plants located within the building, calculate the rates based on the virtual electric and fossil fuel rates from the model. If a flat rate structure, in which the cost per unit of energy is the same throughout the year and there are no demand charges, is being used for all energy sources, then those flat rates become the virtual energy rates for the project. If all energy rate structures are not flat, a preliminary run of the baseline case energy model must first be completed to identify the virtual electric and fossil fuel rates for the project. For this preliminary run only, the rate for the energy supplied by the DES or central plant may be left blank or entered as any value. Once all the virtual energy rates are identified for electricity and fossil fuel, calculate the virtual DES or central plant rates for both the baseline and proposed cases, using the values in the minimum energy performance calculator provided by USGBC. </span><em style="box-sizing:border-box;color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px">Energy Rates for Path 1</em><span style="color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px"> If tariffs or rates are not available from the district plant servicing the project (e.g. for campus or military plants), calculate the rates based on the virtual electric and fossil fuel rates from the model:</span><ul style="box-sizing:border-box;margin-top:0px;margin-bottom:1rem;color:rgb(33,37,41);font-family:"Source Sans Pro",sans-serif;font-size:16px"><li style="box-sizing:border-box">If a flat rate structure is being used for all energy sources (meaning the cost per unit energy is the same throughout the year, and there are no demand charges), then these flat rates simply become the virtual energy rates for the project.</li><li style="box-sizing:border-box">Otherwise, if all energy rate structures are not flat, then a preliminary run of the Option 1 Baseline Case energy model must first be completed to identify the virtual electric and fossil fuel rates for the project. For this preliminary run only, the rate for the DES-supplied energy may be left blank, or may be entered as any value.</li><li style="box-sizing:border-box">Once all the virtual energy rates are known for electricity and fossil fuel, the virtual DES rates for both the Baseline and Proposed Case are then derived as follows: District Chilled Water Rate: Units of $/(Btu x 10<span style="box-sizing:border-box;font-size:12px;line-height:0;vertical-align:baseline">6</span>) = Virtual Electric Rate (in $/kWh) x 71 Units of $/ton-hour = Virtual Electric Rate (in $/kWh) x 0.85 Units of $/kWh = Virtual Electric Rate (in $/kWh) x 0.24<br style="box-sizing:border-box">District Hot Water Rate: Units of $/(Btu x 10<span style="box-sizing:border-box;font-size:12px;line-height:0;vertical-align:baseline">6</span>) = Virtual Fuel Rate (in $/(Btu x 10<span style="box-sizing:border-box;font-size:12px;line-height:0;vertical-align:baseline">6</span>)) x 1.59 + Virtual Electric Rate (in $/kWh) x 3 Units of $/kWh = Virtual Fuel Rate (in $/kWh) x 1.59 + Virtual Electric Rate (in $/kWh) x 0.01 Units of $/therm = Virtual Fuel Rate (in $/therm) x 1.59 + Virtual Electric Rate (in $/kWh x 0.3)<br style="box-sizing:border-box">District Steam Rate: Units of $/ (Btu x 10<span style="box-sizing:border-box;font-size:12px;line-height:0;vertical-align:baseline">6</span>) = Virtual Fuel Rate (in $/(Btu x 10<span style="box-sizing:border-box;font-size:12px;line-height:0;vertical-align:baseline">6</span>)) x 1.81 + Virtual Electric Rate (in $/kWh) x 3 Units of $/kWh = Virtual Fuel Rate (in $/kWh) x 1.81 + Virtual Electric Rate (in $/kWh) x 0.01 Units of $/therm = Virtual Fuel Rate (in $/therm) x 1.81 + Virtual Electric Rate (in $/kWh x 0.3)</li>Exception: to obtain the virtual fuel rate when the connected building does not use fossil fuel but the DES central plant does, use a flat rate consistent with the central plant rates or the historic average local market rates (no preliminary model run is needed). The virtual fuel rates must match in the Baseline and Proposed Case. The virtual DES rates are then input into the modeling software for each DES source and used for the remainder of the process. Alternatively, the virtual DES rates may be used to calculate the DES energy costs directly by multiplying the DES energy consumption for each DES source by its virtual DES rate. All virtual DES energy rates must be identical in the Baseline and Proposed Case.<h5 style="box-sizing:border-box;margin-top:0px;margin-bottom:0.5rem;line-height:28px;font-size:18px;color:rgb(0,0,0)">Path 2. Full DES or central plant performance accounting</h5>Path 2 is available to projects connected to a central plant or DES that wish to account for average efficiency across a smaller time step. The energy model scope accounts for both downstream equipment and upstream equipment and requires calculation of the district energy average efficiencies using either modeling or monitoring. <em style="box-sizing:border-box">Energy rates</em> All DES energy rates must be identical in both the baseline and the proposed cases. Use local rates as they would normally apply to the project for the energy sources under consideration. For energy sources used by the DES but not normally available to the building, such as diesel fuel, use the rates charged to the DES. If this information is not available, use representative market rates. Exception: For DES plants that operate under specific and atypical rate structures and actively take advantage of those rates through strategies such as load management or energy storage, use the rate structures as they apply to the DES. <em style="box-sizing:border-box">Baseline plant</em> Model the baseline case with a dedicated plant that is compliant with ASHRAE 90.1–2010, Appendix G, baseline requirements. Model the baseline building plant with conventional equipment using performance parameters and efficiencies per ASHRAE 90.1–2010, using energy sources corresponding to the DES or central plant. <em style="box-sizing:border-box">Proposed plant</em> Model the proposed case with a virtual central plant or DES-equivalent plant. Model a virtual plant with the same efficiencies as the entire upstream DES heating, cooling, and combined heat and power (CHP) system, including all distribution losses and energy use. Equipment efficiencies, distribution losses, and distribution pumping energy may be determined using any of the following methods:<ul style="box-sizing:border-box;margin-top:0px;margin-bottom:0px"><li style="box-sizing:border-box">Monitored data</li><li style="box-sizing:border-box">Engineering analysis</li><li style="box-sizing:border-box">Default values</li></ul>Efficiencies and losses may be determined and modeled at any level of time resolution, from hourly to annual. However, the time resolution must be sufficiently granular to capture and reasonably represent any significant time- or load-dependent interactions between systems, such as thermal storage or CHP. Monitoring data for heating, cooling, pumping, and cogeneration may be used only if the thermal loads that are monitored represent at least 90% of the load on the building, campus, or district plant predicted after occupancy of the project space. Monitoring and analytical methods may be combined as necessary and appropriate. Whether using monitoring or an analytical method, the methodologies must be fully documented. The following specific requirements apply. <em style="box-sizing:border-box">Heating and cooling plants</em> Efficiencies, whether determined through monitoring or analytically, must include all operational effects, such as standby, equipment cycling, partial-load operation, internal pumping, and thermal losses. <em style="box-sizing:border-box">Thermal distribution losses</em> For central plants located inside the project building, the thermal losses are assumed to be zero. For district systems, use monitored data or an engineering analysis.<ul style="box-sizing:border-box;margin-top:0px;margin-bottom:0px"><li style="box-sizing:border-box">If using monitored data, determine the distribution losses for the DES by measuring the total thermal energy leaving the plant and comparing it with the total thermal energy used by the buildings connected to the DES. De-rate the plant efficiency accordingly in the energy model:</li></ul><div class="gmail-center-content" style="box-sizing:border-box">Plant efficiency (%) x [100% – distribution loss (%)]</div><ul style="box-sizing:border-box;margin-top:0px;margin-bottom:0px"><li style="box-sizing:border-box">An engineering analysis takes into consideration all distribution losses between the DES and the building. For distribution main losses, use a prorated amount based on load. For dedicated branch losses, use the total losses of the branch that feeds the building, including heat losses and steam trap losses. Compare the total losses with the total load of the building to get a percentage distribution loss relative to load and downgrade the plant’s efficiency accordingly in the energy model.</li></ul><em style="box-sizing:border-box">Pumping energy</em> Whether through monitored data or engineering analysis, determine pumping energy for the project by prorating the total pump energy of the DES or central plant by the ratio of the annual thermal load of the project space to the total annual DES thermal load. Model the pump energy as auxiliary electrical load. Pumping energy must be determined or estimated where it applies (i.e., there is no default value). <em style="box-sizing:border-box">Default efficiencies and losses</em> Actual efficiency performance data on the DES serving the project building are preferred. If the project team cannot obtain or determine the actual performance data, use the following default values. These values are conservative and are intended to represent a DES with relatively low efficiency; a well-designed, well-operated DES generally performs better.<ul style="box-sizing:border-box;margin-top:0px;margin-bottom:0px"><li style="box-sizing:border-box">DES heating plant: 70% (higher heating value, HHV) for the total boiler plant average efficiency</li><li style="box-sizing:border-box">DES cooling plant: coefficient of performance (COP) of 4.4 for the total cooling plant average efficiency (including cooling towers and primary pumps)</li><li style="box-sizing:border-box">Thermal distribution losses, including minor leaks or condensate losses:<ul style="box-sizing:border-box;margin-top:0px;margin-bottom:0px"><li style="box-sizing:border-box">Chilled water district cooling, 5%</li><li style="box-sizing:border-box">Hot water district heating, 10%</li><li style="box-sizing:border-box">Closed-loop steam systems, 15%</li><li style="box-sizing:border-box">Open-loop steam systems, 25%</li>For steam systems that are partially open and partially closed, prorate between the above 15% and 25% losses in accordance with the fraction of expected or actual condensate loss.</ul></li></ul>The above guidance assumes that DES-generated heat is used for heat in the connected building, and DES-generated cooling is used for cooling in the connected building. If the DES produces heating that is then converted to cooling for the connected building using absorption chillers or other similar technology, this guidance must be modified (see CHP Modeling Guidance).<h5 style="box-sizing:border-box;margin-top:0px;margin-bottom:0.5rem;line-height:28px;font-size:18px;color:rgb(0,0,0)">Path 3. Streamlined DES modeling</h5>Path 3 is applicable for simple district energy systems. The energy model scope accounts for both downstream equipment and upstream equipment and also requires calculation of the district energy average efficiencies using either the modeling or monitoring methods. <em style="box-sizing:border-box">Energy rates</em> Use Streamlined DES Modeling in the calculator provided by USGBC to allocate the energy costs to the results of the model for each district energy source, in lieu of the purchased energy rates, to determine the baseline energy cost. <em style="box-sizing:border-box">Baseline plant</em> Calculate the average annual efficiency values for each district or central plant fuel source used to generate and distribute the thermal energy, based on ASHRAE 90.1–2010, Appendix G, baseline case requirements. These values depend on the ASHRAE 90.1–2010 system type that would be selected for the building if the baseline case were modeled with on-site equipment. The calculations for baseline cost per district energy source are the same as those for the proposed case model, except that the average efficiency is constant. <em style="box-sizing:border-box">Proposed plant</em> Determine a single value for average annual efficiency, including thermal losses and distribution energy, for each district or central plant fuel source used to generate and distribute the thermal energy. For example, for chilled water:<div class="gmail-credit-embed-wrapper gmail-row gmail-ml-0 gmail-mr-0" style="box-sizing:border-box;display:flex"><div class="gmail-col-lg-12 gmail-col-md-12 gmail-col-sm-12 gmail-col-xs-12" style="box-sizing:border-box;width:610px;padding-right:15px;padding-left:15px;max-width:100%"><img class="gmail-" src="https://www.usgbc.org/sites/default/files/EAeq1_Homes%20Min%20Energy_Cost%20CHW%20building.jpg" style="box-sizing: border-box; vertical-align: middle; border-style: none; width: 580px;"></div></div></ul><div><font color="#212529" face="Source Sans Pro, sans-serif"><span style="font-size:16px"><br></span></font></div><div><font color="#212529" face="Source Sans Pro, sans-serif"><span style="font-size:16px">Best regards.</span></font></div></div></div><div><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div><div dir="ltr"><div style="text-align:center"><font face="arial, helvetica, sans-serif"><br></font></div></div></div><div><div dir="ltr"><p style="font-size:12.8px;margin:0px"><font size="1" face="arial, helvetica, sans-serif" color="#0c343d"><i>Victor Moreno<br></i></font></p><font size="1" face="arial, helvetica, sans-serif" color="#0c343d"><i><p style="margin:0px">Consultor energético y sostenibilidad en edificación</p><p style="margin:0px">LEED AP, BREEAM Asesor, CEM, CMVP, CxA</p><p style="margin:0px">+34 699 135 788</p></i></font></div></div></div></div></div></div></div></div></div></div><br></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">El vie, 30 ago 2024 a las 13:29, Chris Yates via Bldg-sim (<<a href="mailto:bldg-sim@lists.onebuilding.org">bldg-sim@lists.onebuilding.org</a>>) escribió:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><div class="msg-6291093460004188740"><div lang="EN-GB" style="overflow-wrap: break-word;"><div class="m_-6291093460004188740WordSection1"><p class="MsoNormal">Hello,<u></u><u></u></p><p class="MsoNormal"><u></u> <u></u></p><p class="MsoNormal">I’m modelling a Commercial Interior to LEED v4 ID+C. It’s roughly a single floor with purchased heating and cooling piped in to fan coil terminals and a DOAS.<u></u><u></u></p><p class="MsoNormal"><u></u> <u></u></p><p class="MsoNormal">I’m a unclear regarding the baseline, especially the envelope. Furthermore, the guidance that is given seems to go against my expectation.<u></u><u></u></p><p class="MsoNormal"><u></u> <u></u></p><table border="1" cellspacing="0" cellpadding="0" style="border-collapse:collapse;border:none"><tbody><tr style="height:14.05pt"><td width="257" valign="top" style="width:192.55pt;border:1pt solid windowtext;padding:0cm 5.4pt;height:14.05pt"><p class="MsoNormal">BASELINE <u></u><u></u></p></td><td width="257" valign="top" style="width:192.6pt;border-top:1pt solid windowtext;border-right:1pt solid windowtext;border-bottom:1pt solid windowtext;border-left:none;padding:0cm 5.4pt;height:14.05pt"><p class="MsoNormal">My expectation<u></u><u></u></p></td><td width="257" valign="top" style="width:192.6pt;border-top:1pt solid windowtext;border-right:1pt solid windowtext;border-bottom:1pt solid windowtext;border-left:none;padding:0cm 5.4pt;height:14.05pt"><p class="MsoNormal">What LEED seems to say<u></u><u></u></p></td></tr><tr style="height:41.5pt"><td width="257" valign="top" style="width:192.55pt;border-right:1pt solid windowtext;border-bottom:1pt solid windowtext;border-left:1pt solid windowtext;border-top:none;padding:0cm 5.4pt;height:41.5pt"><p class="MsoNormal">Envelope<u></u><u></u></p></td><td width="257" valign="top" style="width:192.6pt;border-top:none;border-left:none;border-bottom:1pt solid windowtext;border-right:1pt solid windowtext;padding:0cm 5.4pt;height:41.5pt"><p class="MsoNormal">As existing shell<u></u><u></u></p></td><td width="257" valign="top" style="width:192.6pt;border-top:none;border-left:none;border-bottom:1pt solid windowtext;border-right:1pt solid windowtext;padding:0cm 5.4pt;height:41.5pt"><p class="MsoNormal">Same as section 5. Explicitly ignore item (f), existing envelope<u></u><u></u></p></td></tr><tr style="height:14.05pt"><td width="257" valign="top" style="width:192.55pt;border-right:1pt solid windowtext;border-bottom:1pt solid windowtext;border-left:1pt solid windowtext;border-top:none;padding:0cm 5.4pt;height:14.05pt"><p class="MsoNormal">Chiller/ boiler<u></u><u></u></p></td><td width="257" valign="top" style="width:192.6pt;border-top:none;border-left:none;border-bottom:1pt solid windowtext;border-right:1pt solid windowtext;padding:0cm 5.4pt;height:14.05pt"><p class="MsoNormal">Not in tenants scope so as existing <u></u><u></u></p></td><td width="257" rowspan="2" valign="top" style="width:192.6pt;border-top:none;border-left:none;border-bottom:1pt solid windowtext;border-right:1pt solid windowtext;padding:0cm 5.4pt;height:14.05pt"><p class="MsoNormal">Not clear but seems to be regular App G/ System 7, etc.<u></u><u></u></p></td></tr><tr style="height:13.3pt"><td width="257" valign="top" style="width:192.55pt;border-right:1pt solid windowtext;border-bottom:1pt solid windowtext;border-left:1pt solid windowtext;border-top:none;padding:0cm 5.4pt;height:13.3pt"><p class="MsoNormal">DOAS<u></u><u></u></p></td><td width="257" valign="top" style="width:192.6pt;border-top:none;border-left:none;border-bottom:1pt solid windowtext;border-right:1pt solid windowtext;padding:0cm 5.4pt;height:13.3pt"><p class="MsoNormal">Not in tenants scope so as existing <u></u><u></u></p></td></tr></tbody></table><p class="MsoNormal"><u></u> <u></u></p><p class="MsoNormal">I have a the 2011 version of “Advanced Energy Modelling for LEED” and can’t seem to find any more detail in there.<u></u><u></u></p><p class="MsoNormal"><u></u> <u></u></p><p class="MsoNormal">Are there any good, current, prescriptive sources for how to model this? Or any simple answers?!<u></u><u></u></p><p class="MsoNormal"><u></u> <u></u></p><p class="MsoNormal">Kind regards<u></u><u></u></p><p class="MsoNormal"><u></u> <u></u></p><p class="MsoNormal"><span>Chris Yates C Eng MCIBSE LCEA</span><span><u></u><u></u></span></p><p class="MsoNormal"><u></u> <u></u></p></div></div>_______________________________________________<br>
Bldg-sim mailing list<br>
<a href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" rel="noreferrer" target="_blank">http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</a><br>
To unsubscribe from this mailing list send  a blank message to <a href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG" target="_blank">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</a><br>
</div></blockquote></div>