<div dir="ltr"><div></div><div>Oops, That's what I get from reading too quickly on a mobile device, I didn't register that you were talking about Section 11 and not App G (It's also part of why I had replied to you privately and not including the whole list).<br></div><div><br></div><div>I'm not all that familiar with Section 11, so don't quote me on this, but from a very cursory look, perhaps you can go with System 6: an electric Water source heat pump with the <u>same</u> backup boilers as in the proposed? I'm having trouble finding another way of trying to satisfy both 11.3.2A (g) and 11.3.2.(j).(2)...</div><div><br></div><div><br></div><div></div><div><div><div><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div>--<br>Julien Marrec, EBCP, BPI MFBA<br>Owner at <a href="http://www.effibem.com" target="_blank">EffiBEM</a><br>T: +33 6 95 14 42 13<br><span style="color:rgb(0,0,0)"><br></span><span style="color:rgb(0,0,0)">LinkedIn (<a href="https://www.linkedin.com/in/julienmarrec" target="_blank">en</a>)<span style="color:rgb(0,0,0)"> <i>| </i></span>(<a href="https://fr.linkedin.com/in/julienmarrec/fr" target="_blank">fr</a>) : </span><br><span style="color:rgb(0,0,0)"><a href="http://www.linkedin.com/in/julienmarrec" target="_blank"></a></span></div></div></div></div></div></div></div></div><br></div></div></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">Le lun. 25 mars 2019 à 15:25, Jones, Christopher <<a href="mailto:Christopher.r.Jones@wsp.com">Christopher.r.Jones@wsp.com</a>> a écrit :<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex">





<div lang="EN-US">
<div class="gmail-m_5371784697842270704WordSection1">
<p class="MsoNormal">Julien,<u></u><u></u></p>
<p class="MsoNormal">I believe you are referring to Appendix G. The PNNL document addresses Appendix G situations. In this case, I am modeling to Section 11:<u></u><u></u></p>
<p class="MsoNormal"><u></u> <u></u></p>
<p class="MsoNormal">2. Select the path that corresponds to the proposed<u></u><u></u></p>
<p class="MsoNormal">building design heat source: electric resistance, heat<u></u><u></u></p>
<p class="MsoNormal">pump (including air-source and water-source), or<u></u><u></u></p>
<p class="MsoNormal">fuel-fired. Systems utilizing district heating (steam or<u></u><u></u></p>
<p class="MsoNormal">hot water) shall be treated as if the heating system<u></u><u></u></p>
<p class="MsoNormal">type were “Fossil Fuel.” Systems with no heating<u></u><u></u></p>
<p class="MsoNormal">capability shall be treated as if the heating system<u></u><u></u></p>
<p class="MsoNormal">type were “Fossil Fuel.” For systems with mixed fuel<u></u><u></u></p>
<p class="MsoNormal">heating sources, the system or systems that use the<u></u><u></u></p>
<p class="MsoNormal">secondary heating source type (the one with the<u></u><u></u></p>
<p class="MsoNormal">smallest total installed output capacity for the spaces<u></u><u></u></p>
<p class="MsoNormal">served by the system) shall be modeled identically in<u></u><u></u></p>
<p class="MsoNormal">the budget building design and the primary heating<u></u><u></u></p>
<p class="MsoNormal">source type shall be used in Figure 11.3.2 to deter-<u></u><u></u></p>
<p class="MsoNormal">mine budget system type.<u></u><u></u></p>
<p class="MsoNormal"><u></u> <u></u></p>
<p class="MsoNormal">In my case, all systems receive heat from both the heat recovered from chillers and from natural gas boilers. It makes it difficult say some systems are electric and some are gas.
<u></u><u></u></p>
<p class="MsoNormal"><u></u> <u></u></p>
<p class="MsoNormal">Also, is heat from a heat recovery chiller the same as a “heat pump”? In other words, should the baseline be a water source heat pump with natural gas boiler? That may be the closest fit?<u></u><u></u></p>
<p class="MsoNormal"><u></u> <u></u></p>
<p class="MsoNormal"><u></u> <u></u></p>
<div>
<p class="MsoNormal"><b><span style="font-size:10pt;font-family:"Arial",sans-serif">Christopher R Jones, P.Eng.<u></u><u></u></span></b></p>
<p class="MsoNormal"><span style="font-size:9pt;font-family:"Arial",sans-serif">T+ 1 416-644-0252<u></u><u></u></span></p>
<p class="MsoNormal"><span style="font-size:8pt;font-family:"Arial",sans-serif"><u></u> <u></u></span></p>
<p class="MsoNormal"><img style="width: 0.625in; height: 0.302in;" id="gmail-m_5371784697842270704_x0000_i1029" src="cid:169b540bf2f692e331" width="60" height="29"><u></u><u></u></p>
</div>
<p class="MsoNormal"><u></u> <u></u></p>
<div>
<div style="border-color:rgb(225,225,225) currentcolor currentcolor;border-style:solid none none;border-width:1pt medium medium;padding:3pt 0in 0in">
<p class="MsoNormal"><b>From:</b> Julien Marrec [mailto:<a href="mailto:julien.marrec@gmail.com" target="_blank">julien.marrec@gmail.com</a>] <br>
<b>Sent:</b> Friday, March 22, 2019 3:07 PM<br>
<b>To:</b> Jones, Christopher <<a href="mailto:Christopher.r.Jones@wsp.com" target="_blank">Christopher.r.Jones@wsp.com</a>><br>
<b>Subject:</b> Re: [Bldg-sim] 90.1-2010 Section 11 question<u></u><u></u></p>
</div>
</div>
<p class="MsoNormal"><u></u> <u></u></p>
<div>
<p class="MsoNormal" style="margin-bottom:12pt">If you interpret ashrae 2010 to the letter, you have a mixed fuel system, in which case I'm afraid you have to model a non electric system in the baseline. This is something I often saw when you have VRF+ gas
 DOAS in residential buildings. Some programs may overrule this by explicitly saying that you should model an electric system in the baseline, but otherwise my interpretation is that you do have to model a non electric one. Do double check as I may be rusty
 here, there is a PNNL paper that deals with ashrae 2010 baselines that would be particularly interesting (can't link directly as I'm on my phone sorry)<u></u><u></u></p>
</div>
<div>
<p class="MsoNormal">--<u></u><u></u></p>
</div>
<div>
<p class="MsoNormal" style="margin-bottom:12pt">Sent from a mobile device, please excuse the brevity.<u></u><u></u></p>
</div>
<div>
<p class="MsoNormal">Julien Marrec, EBCP, BPI MFBA<u></u><u></u></p>
</div>
<div>
<p class="MsoNormal">Owner<u></u><u></u></p>
</div>
<div>
<p class="MsoNormal"><img style="width: 0.5833in; height: 0.1979in;" id="gmail-m_5371784697842270704_x0000_i1025" src="cid:169b540bf307745b42" width="56" height="19"><u></u><u></u></p>
</div>
<div>
<p class="MsoNormal">Direct: +33 6 95 14 42 13<u></u><u></u></p>
</div>
<div>
<p class="MsoNormal">Website: <a href="http://www.effibem.com" target="_blank">www.effibem.com</a><u></u><u></u></p>
</div>
<div>
<p class="MsoNormal">LinkedIn (<a href="https://www.linkedin.com/in/julienmarrec" target="_blank">en</a>) | (<a href="https://fr.linkedin.com/in/julienmarrec/fr" target="_blank">fr</a>)<u></u><u></u></p>
</div>
<div>
<p class="MsoNormal">On Mar 22, 2019, at 18:44, "Jones, Christopher via Bldg-sim" <<a href="mailto:bldg-sim@lists.onebuilding.org" target="_blank">bldg-sim@lists.onebuilding.org</a>> wrote:<u></u><u></u></p>
<blockquote style="border-color:currentcolor currentcolor currentcolor rgb(204,204,204);border-style:none none none solid;border-width:medium medium medium 1pt;padding:0in 0in 0in 6pt;margin-left:4.8pt;margin-right:0in">
<p class="MsoNormal">Apologies for cross posting.<u></u><u></u></p>
<p> <u></u><u></u></p>
<p class="MsoNormal">I am modeling the baseline according to 90.1-2010 Section 11. The proposed design uses heat recovery chillers with boilers to pick up what the heating loads HR chiller isn’t able to meet. In this case, would the heating classification be
 Heat Pump? The HR chillers meet the majority of heating loads. 11.3.2.(j).(2) indicates that the systems served by the secondary heating source type are to be modeled the same in the baseline. In my case I can’t really separate the systems as all systems use
 heating provided by both the HR Chillers and the boiler plant. <u></u><u></u></p>
<p> <u></u><u></u></p>
<p class="MsoNormal">Any idea how the baseline plant and systems should be modelled? Water source heat pumps (System 6) may be appropriate but I would have to add a DOAS.
<u></u><u></u></p>
<p> <u></u><u></u></p>
<p class="MsoNormal">At the moment, the baseline model has System 2 (VAV with boiler and chiller) but this leads to much lower electricity consumption in the baseline. The purpose of the modeling is for an incentive based on electricity savings – either kWh
 or kW which ever gives the best incentive. I do have peak kW savings but it would be much better if the baseline had electric heating of some kind along with the gas heating.<u></u><u></u></p>
<p> <u></u><u></u></p>
<p class="MsoNormal">Any insights appreciated.<u></u><u></u></p>
<p> <u></u><u></u></p>
<p> <u></u><u></u></p>
<p><b> </b><u></u><u></u></p>
<p class="MsoNormal"><b><span style="font-size:10pt;font-family:"Arial",sans-serif" lang="EN-GB">Christopher R. Jones</span></b><span style="font-size:10pt;font-family:"Arial",sans-serif" lang="EN-GB">, P.Eng.</span><u></u><u></u></p>
<p class="MsoNormal"><span style="font-size:9pt;font-family:"Arial",sans-serif" lang="EN-GB">Senior Building Performance Specialist</span><u></u><u></u></p>
<p class="MsoNormal"><span style="font-size:9pt;font-family:"Arial",sans-serif" lang="EN-GB">Sustainability & Energy</span><u></u><u></u></p>
<p> <u></u><u></u></p>
<p class="MsoNormal"><img style="width: 0.625in; height: 0.302in;" id="gmail-m_5371784697842270704_x0031_cc2331b-d8c3-424e-81de-2b17716d444e.png_x003f_ver_x003d_1495657656000" width="60" height="29" border="0"><u></u><u></u></p>
<p class="MsoNormal"><span style="font-size:9pt;font-family:"Arial",sans-serif">T+ 1 416-644-0252</span><u></u><u></u></p>
<p> <u></u><u></u></p>
<p class="MsoNormal"><span style="font-size:9pt;font-family:"Arial",sans-serif">2300 Yonge Street, Suite 2300</span><u></u><u></u></p>
<p class="MsoNormal" style="margin-bottom:12pt"><span style="font-size:9pt;font-family:"Arial",sans-serif">Toronto, ON M4P 1E4 Canada</span><u></u><u></u></p>
<p class="MsoNormal"><span style="font-size:10pt;font-family:"Arial",sans-serif"><a href="http://wsp.com" target="_blank">wsp.com</a></span><u></u><u></u></p>
<p> <u></u><u></u></p>
<p><b> </b><u></u><u></u></p>
<p class="MsoNormal"><i><span style="font-size:10pt;font-family:"Arial",sans-serif;color:rgb(110,169,0)">Please consider the environment before printing...</span></i><u></u><u></u></p>
<p> <u></u><u></u></p>
<p> <u></u><u></u></p>
<p class="MsoNormal"><u></u> <u></u></p>
<div class="MsoNormal" style="text-align:center" align="center">
<hr width="100%" size="2" align="center">
</div>
<p class="MsoNormal"><span style="font-size:7.5pt;font-family:"Arial",sans-serif;color:gray"><br>
<br>
NOTICE: This communication and any attachments ("this message") may contain information which is privileged, confidential, proprietary or otherwise subject to restricted disclosure under applicable law. This message is for the sole use of the intended recipient(s).
 Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on, this message is strictly prohibited. If you have received this message in error, or you are not an authorized or intended recipient, please notify
 the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies. You are receiving this communication because you are listed as a current WSP contact. Should you have any questions
 regarding WSP's electronic communications policy, please consult our Anti-Spam Commitment at
<a href="http://www.wsp.com/casl" target="_blank">www.wsp.com/casl</a>. For any concern or if you believe you should not be receiving this message, please forward this message to
<a href="mailto:caslcompliance@wsp.com" target="_blank">caslcompliance@wsp.com</a> so that we can promptly address your request. Note that not all messages sent by WSP qualify as commercial electronic messages.
<br>
<br>
AVIS : Ce message, incluant tout fichier l'accompagnant (« le message »), peut contenir des renseignements ou de l'information privilégiés, confidentiels, propriétaires ou à divulgation restreinte en vertu de la loi. Ce message est destiné à l'usage exclusif
 du/des destinataire(s) voulu(s). Toute utilisation non permise, divulgation, lecture, reproduction, modification, diffusion ou distribution est interdite. Si vous avez reçu ce message par erreur, ou que vous n'êtes pas un destinataire autorisé ou voulu, veuillez
 en aviser l'expéditeur immédiatement et détruire le message et toute copie électronique ou imprimée. Vous recevez cette communication car vous faites partie des contacts de WSP. Si vous avez des questions concernant la politique de communications électroniques
 de WSP, veuillez consulter notre Engagement anti-pourriel au <a href="http://www.wsp.com/lcap" target="_blank">
www.wsp.com/lcap</a>. Pour toute question ou si vous croyez que vous ne devriez pas recevoir ce message, prière de le transférer au
<a href="mailto:conformitelcap@wsp.com" target="_blank">conformitelcap@wsp.com</a> afin que nous puissions rapidement traiter votre demande. Notez que ce ne sont pas tous les messages transmis par WSP qui constituent des messages electroniques commerciaux.
<br>
</span><br>
<span style="font-size:7.5pt;font-family:"Arial",sans-serif;color:whitesmoke"><br>
<br>
-LAEmHhHzdJzBlTWfa4Hgs7pbKl </span><u></u><u></u></p>
<pre style="text-align:center"><hr width="100%" size="2" align="center"></pre>
<pre><br>Bldg-sim mailing list<br><a href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" target="_blank">http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</a><br>To unsubscribe from this mailing list send  a blank message to <a href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG" target="_blank">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</a><u></u><u></u></pre>
</blockquote>
</div>
</div>
</div>

</blockquote></div>