<div dir="ltr"><div class="gmail_default" style="font-size:large;color:#b45f06">Rathna,</div><div class="gmail_default" style="font-size:large;color:#b45f06">Assuming the you are referring to an ASHRAE 90.1 Baseline, fan power is unchanged except that you can claim a fan pressure credit.  That is what you appear to be referring to.</div><div class="gmail_default" style="font-size:large;color:#b45f06">Each filter manufacturer will show pressure drop for a specific face velocity.  In the US, a typical face velocity is about 500 feet / min.  </div><div class="gmail_default" style="font-size:large;color:#b45f06">If the manufacturer filter pressure drop is .3" at 500 fpm (and the design velocity is also 500 feet / min), then you can use 0.6" as your pressure credit.</div></div><div class="gmail_extra"><br><div class="gmail_quote">On Fri, Apr 10, 2015 at 8:33 AM, Rathna Shree <span dir="ltr"><<a href="mailto:rathnashreep@yahoo.in" target="_blank">rathnashreep@yahoo.in</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div><div style="color:#000;background-color:#fff;font-family:HelveticaNeue,Helvetica Neue,Helvetica,Arial,Lucida Grande,Sans-Serif;font-size:16px"><div dir="ltr">Dear All,</div><div dir="ltr"><br></div><div dir="ltr">We are working on a project with MERV 16 filters used in AHU. For the baseline case, pressure drop adjustment should be added and the description for the same is "calculate Pressure drop calculated at 2× clean filter pressure drop at fan system design condition". It would be very helpful if some one can explain what exactly that means and what has to be considered in base case fan power calculations.</div><div dir="ltr"><br></div><div dir="ltr">Regards,</div><div dir="ltr">Rathnashree</div><div dir="ltr"> </div></div></div><br>_______________________________________________<br>
Bldg-sim mailing list<br>
<a href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" target="_blank">http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</a><br>
To unsubscribe from this mailing list send  a blank message to <a href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</a><br>
<br></blockquote></div><br><br clear="all"><div><br></div>-- <br><div class="gmail_signature"><div dir="ltr"><div><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><p><span style="font-size:10pt;font-family:Arial,sans-serif;color:black;background-image:initial;background-repeat:initial"></span></p>James V Dirkes II, PE, BEMP, LEED AP<br>CEO/President<br>The Building Performance Team Inc.<br>1631 Acacia Dr, GR, Mi 49504<br><br>Direct: 616.450.8653<br><a href="mailto:jim@buildingperformanceteam.com" target="_blank">jim@buildingperformanceteam.com</a><br><br><a href="http://buildingperformanceteamcom" target="_blank">Website </a>l  <a href="https://www.linkedin.com/pub/jim-dirkes/7/444/413" target="_blank">LinkedIn</a><p align="center" style="margin-bottom:0in;margin-bottom:.0001pt;text-align:center"><b><i><span style="font-size:14.0pt;line-height:115%;font-family:"MS Reference Sans Serif","sans-serif""> </span></i></b><span style="font-family:"MS Reference Sans Serif","sans-serif""></span></p><p style="vertical-align:middle">















</p><p style="margin-top:6.0pt"><span style="font-family:Calibri,sans-serif"><font size="4" style="background-color:rgb(255,255,255)" color="#0000ff">The
truth is still the truth, even if nobody believes it.  A lie is still a lie, even if <i>everyone</i>
believes it.</font><span style="font-size:10pt"></span></span></p></div></div></div></div></div></div></div></div></div></div></div></div>
</div>