Hello eQuesters,<div><br></div><div>  I am trying to model a two pipe system with a demand operation loop for a residential building in Maryland.  Currently, my two pipe system turns on cooling when the zones are calling for cooling as expected, however it never changes over to heating during the winter.  It is always either off, or on very rare occasions cooling, resulting in high unmet heating hours.  Can some one explain how the two pipe system determines when to change from heating to cooling mode?  </div>
<div><br></div><div>I've looked at the zones they are definitely below the heating throttling range.  Does eQuest take a sum of the room loads on the loop to determine to heat or to cool?</div><div><br></div><div>Your help is greatly appreciated.</div>
<div><br>Thanks!<br>Justin</div>