    Chris,<br>
    <br>
    Could you re-post the document, or send it to me directly, please?<br>
    <br>
    <br>
    Thanks!<br>
    <br>
    <br>
    <br>
    <pre class="moz-signature" cols="72">Robert Wichert P.Eng. LEED AP BD&C
+1 916 966 9060
FAX +1 916 966 9068







===============================================
</pre>
    <br>
    On 5/14/2012 6:13 AM, Cristian Salvador Jara Toro wrote:
    <blockquote
cite="mid:CACwmnFcox4kiHnLNMm_yG8923UyvhmS_QPByca=JA=pDRNO+sA@mail.gmail.com"
      type="cite">The Document attached by Chris is very helpful to "fee
      path" establishment. In my case, it´s been very inextricable to
      develop some fee-way which can be useful for both, the client an
      me (I work by myself in modelling), but I think that always should
      exist -regardless to ft2 or m2- a "minimum fee requirement" (for
      funny, like the LEED prerequisite), and that I used to do.<br>
      <br>
      Thanks.<br>
      <br clear="all">
      Cristian Jara Toro<br>
      Ingeniero Acústico<br>
      Modelamiento Térmico de Edificios<br>
      Cel: 6 207 8566<br>
      <br>
      <br>
      <br>
      <br>
      <div class="gmail_quote">On Sat, May 12, 2012 at 5:33 PM, Chris
        Jones <span dir="ltr"><<a moz-do-not-send="true"
            href="mailto:cj@enersave.ca" target="_blank">cj@enersave.ca</a>></span>
        wrote:<br>
        <blockquote class="gmail_quote" style="margin:0 0 0
          .8ex;border-left:1px #ccc solid;padding-left:1ex">
          <div>
            The IIBSE IDP_overview.pdf document attached provides a
            detailed
            framework for planning the energy simulation stages.  <br>
            We have been using this type of framework, adjusted for the
            requirements
            of each projects, since 2001.  It is difficult to provide a
            "typical" fee structure as each design team/owner will have
            different goals.  <br>
            As an example, an averaged sized secondary high school might
            allow for
            100 hours for the modeling/reporting for the integrated
            design process
            from concept through design development to tender phase.  <br>
            <br>
            We rarely provide a fee proposal for final LEED modelling
            until project
            has completed the tender phase.  Too much can change from
            final
            design to final tender documents.  <br>
            <br>
            We provide an estimate at the beginning of the project.  The
            client
            is welcome to set a different contract for final LEED
            modelling. 
            <br>
            <br>
            An averaged size secondary high school would take about 100s
            hour for
            final LEED modelling depending on how much has changed over
            the course of
            the design process. <br>
            <br>
            <br>
            At 06:19 PM 11/05/2012, Fonner, Nicholas wrote:<br>
            <blockquote type="cite">Content-class:
              urn:content-classes:message<br>
              Content-Type: multipart/alternative;<br>
                      
              boundary="----_=_NextPart_001_01CD2FC3.EFC76404"
              <div>
                <div class="h5"><br>
                  <br>
                  I would like to see an explanation on the approach for
                  estimation of
                  effort and cost on the various phases throughout a
                  typical project. 
                  The effort for each stage is fairly easy to establish,
                  but it has been
                  difficult to account for iterations within the life of
                  the project. 
                  It may be the case where energy modeling is not given
                  the same
                  consideration as the design teams when large changes
                  require large rework
                  effort.  Does anyone have information that could help
                  establish a
                  fee structure for projects that start early and
                  reoccur throughout the
                  project phases?  The push for integrated building
                  performance in the
                  future is forcing building performance simulation and
                  energy management
                  to the center of design focus.  The original response
                  from Nick,
                  Bill, and Pasha is a great resource that hopefully
                  gets a lot of
                  attention.<br>
                   <br>
                  Thanks,<br>
                   <br>
                  <b>Nic Fonner<br>
                  </b>Energy Modeling Group<br>
                  <b>Henneman </b>Engineering, Inc.  |  energy.
                  focused.<br>
                  1605 South State Street, Champaign, IL 61820<br>
                  V 217.359.1514  |  F 217.359.9354  |  C<br>
                  <a moz-do-not-send="true"
                    href="http://www.henneman.com/" target="_blank">www.henneman.com</a> 
                  | 
                  <a moz-do-not-send="true"
                    href="mailto:nfonner@henneman.com" target="_blank"><u>nfonner@henneman.com</u></a><br>
                   <br>
                   <br>
                </div>
              </div>
              _______________________________________________<br>
              Bldg-sim mailing list<br>
              <a moz-do-not-send="true"
href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org"
                target="_blank">
http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</a><br>
              To unsubscribe from this mailing list send  a blank
              message to
              <a moz-do-not-send="true"
                href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG"
                target="_blank">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</a></blockquote>
            <p>
              >><br>
              Christopher Jones, P.Eng.<br>
              Suite 1801, 1 Yonge Street<br>
              Toronto, ON M5E1W7<br>
              Tel. 416-203-7465<br>
              Fax. 416-946-1005<br>
              email <a moz-do-not-send="true"
                href="mailto:cj@enersave.ca" target="_blank">cj@enersave.ca</a><br>
            </p>
          </div>
          <br>
          _______________________________________________<br>
          Bldg-sim mailing list<br>
          <a moz-do-not-send="true"
href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org"
            target="_blank">http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</a><br>
          To unsubscribe from this mailing list send  a blank message to
          <a moz-do-not-send="true"
            href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</a><br>
          <br>
        </blockquote>
      </div>
      <br>
      <br>
      <fieldset class="mimeAttachmentHeader"></fieldset>
      <br>
      <pre wrap="">_______________________________________________
Bldg-sim mailing list
<a class="moz-txt-link-freetext" href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org">http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</a>
To unsubscribe from this mailing list send  a blank message to <a class="moz-txt-link-abbreviated" href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</a>
</pre>
    </blockquote>
  </body>
</html>