<html>
<head>
<style><!--
.hmmessage P
{
margin:0px;
padding:0px
}
body.hmmessage
{
font-size: 10pt;
font-family:Tahoma
}
--></style>
</head>
<body class='hmmessage'><div dir='ltr'>
Hi Chou,<br><br>I understand that the meaning of these loads are:<br><ol><li>Monthly Heating/Cooling loads: it's the monthly average sume of all gains and loses of your space<br></li><li>Hourly gains: it indicates for every hour of a specific day what its the behaviuor of each kind of energy flow<br></li><li>Specific gain hourly or monthly allow you to know the behaviuor of that energy transfer</li></ol>Each point allows you to know differents aspects. The first only gives you the total for every month, the second allows you analize what load is important in a specific day and the last aspect allows you to know the anual behaviuor of a specific transfer of energy.<br><br>I don't know if it's clearly now or I confuse you more<br><br>Regards<br><br>Paula Esquivias<br>Department of Architectural Construction 1<br>High Technical School of Architecture<br>University of Seville (Spain)<br><br><br><div>From: bldg-sim-request@lists.onebuilding.org<br>Subject: Bldg-sim Digest, Vol 47, Issue 9<br>To: bldg-sim@lists.onebuilding.org<br>Date: Mon, 10 Oct 2011 13:30:45 -0700<br><br><pre>Send Bldg-sim mailing list submissions to<br>   bldg-sim@lists.onebuilding.org<br> <br>To subscribe or unsubscribe via the World Wide Web, visit<br>  <a href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" target="_blank">http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</a><br>or, via email, send a message with subject or body 'help' to<br>     bldg-sim-request@lists.onebuilding.org<br> <br>You can reach the person managing the list at<br>      bldg-sim-owner@lists.onebuilding.org<br> <br>When replying, please edit your Subject line so it is more specific<br>than "Re: Contents of Bldg-sim digest..."<br></pre><br><br>--Archivo adjunto de mensaje reenviado--<br>From: csz59@mst.edu<br>To: bldg-sim@lists.onebuilding.org<br>Date: Mon, 10 Oct 2011 12:20:57 -0500<br>Subject: [Bldg-sim] loads and gians in Ecotect<br><br>Hi <br><br>I have some problem when using Ecotect to make thermal analysis.<br>In thermal calculation I can get some gains and loads as following:<br>1. in MONTHLY HEATING/COOLING LOADS, I can get the Max Heating/Cooling loads and the time<br>
2. in HOURLY GAINS I can choose the particular time in 1 and get the HVAC load<br>3. I can get fabric, direct solar.... gains at some particular time and then make a sum, so I get another gain<br><br>I thin there three gains or laods should be the same, but acturally they aren't. I am confused.<br>
<br clear="all"><br>-- <br>Chou Shen<br>Graduate Research Assistant<br>Department of Civil, Architectural & Environmental Engineering<br>Missouri University of Science and Technology<br><br><br><br>
<br><br>--Archivo adjunto de mensaje reenviado--<br>From: anne.moellenberndt@arup.com<br>To: bldg-sim@lists.onebuilding.org<br>Date: Mon, 10 Oct 2011 12:11:31 -0700<br>Subject: [Bldg-sim] Modeling to the MNECB in canada<br><br>
<meta http-equiv="Content-Type" content="text/html; charset=unicode">
<meta name="Generator" content="Microsoft SafeHTML"><style>
.ExternalClass p.ecxMsoNormal, .ExternalClass li.ecxMsoNormal, .ExternalClass div.ecxMsoNormal
{margin-bottom:.0001pt;font-size:11.0pt;font-family:"Calibri","sans-serif";}
.ExternalClass a:link, .ExternalClass span.ecxMsoHyperlink
{color:blue;text-decoration:underline;}
.ExternalClass a:visited, .ExternalClass span.ecxMsoHyperlinkFollowed
{color:purple;text-decoration:underline;}
.ExternalClass p.ecxMsoListParagraph, .ExternalClass li.ecxMsoListParagraph, .ExternalClass div.ecxMsoListParagraph
{margin-right:0in;margin-bottom:0in;margin-left:.5in;margin-bottom:.0001pt;font-size:11.0pt;font-family:"Calibri","sans-serif";}
.ExternalClass span.ecxEmailStyle17
{font-family:"Calibri","sans-serif";color:windowtext;}
.ExternalClass .ecxMsoChpDefault
{;}
@page WordSection1
{size:8.5in 11.0in;}
.ExternalClass div.ecxWordSection1
{page:WordSection1;}
.ExternalClass ol
{margin-bottom:0in;}
.ExternalClass ul
{margin-bottom:0in;}

</style><div class="ecxWordSection1"><p class="ecxMsoNormal">I’m looking for some feedback from anyone who has used EE4 and/or modeled a building against the MNECB 1997 in Canada.</p><p class="ecxMsoNormal"> </p><p class="ecxMsoListParagraph" style="text-indent:-.25in"><span style="">1.<span style="font:7.0pt "Times New Roman"">       </span></span>How are the Energy Source Adjustment Factors used when modeling a building for LEED against the MNECB?  It appears that these factors are meant to be multiplied by the total energy cost from each type of use. I see that at least in LEED Canada NC 1.0/1.1, the calculations for EQ p2 require 25% improvement in energy consumption (not cost) over MNECB. Presumably this requires use of the ESAF in that calculation.  However, LEED also requires that calculations for energy savings are based on energy cost. When calculating energy costs, do you have to use the ESAF as well as the different utility rates? Or do you use the actual consumption (without using the ESAF) to figure the cost?</p><p class="ecxMsoListParagraph" style="text-indent:-.25in"><span style="">2.<span style="font:7.0pt "Times New Roman"">       </span></span>The code appears to require use of baseline systems that completely mirror the proposed systems – boiler for boiler, chiller for chiller, multi-zone for multi-zone.  How have others found ways to show significant energy savings given this constraint?  The newer versions of ASHRAE allow comparison of a proposed ground-source heat pump system, for example, against a boiler heating baseline system, or a VAV system against a packaged system, depending on various factors.  But the MNECB and ASHRAE 90.1-1999 don’t allow this.  I am struggling to see how it would be possible to get more than 20-30% savings given these rules.  </p><p class="ecxMsoNormal"> </p><p class="ecxMsoNormal">Thanks,</p><p class="ecxMsoNormal"> </p><p class="ecxMsoNormal"><b><span style="font-family:"Times New Roman","serif";color:#696EB4">Anne Marie Moellenberndt </span></b><span style="font-size:10.0pt;font-family:"Times New Roman","serif";color:#595959">PE  LEED AP</span><b><span style="font-family:"Times New Roman","serif";color:#696EB4"></span></b></p><p class="ecxMsoNormal"><span style="font-size:10.0pt;font-family:"Times New Roman","serif";color:#595959">Senior Mechanical Engineer  </span></p><p class="ecxMsoNormal"><span style="font-size:10.0pt;font-family:"Times New Roman","serif";color:#595959"> </span></p><p class="ecxMsoNormal"><b><span style="font-size:12.0pt;font-family:"Times New Roman","serif";color:#595959">Arup</span></b><span style="font-size:10.0pt;font-family:"Times New Roman","serif";color:#595959"></span></p><p class="ecxMsoNormal"><span style="font-size:10.0pt;font-family:"Times New Roman","serif";color:#595959">403 Columbia Street Suite 220  Seattle WA 98104  </span></p><p class="ecxMsoNormal"><b><span style="font-size:10.0pt;font-family:"Times New Roman","serif";color:#595959">t</span></b><span style="font-size:10.0pt;font-family:"Times New Roman","serif";color:#595959"> +1 206 749 9674  <b>d</b> +1 206 493 2244  </span></p><p class="ecxMsoNormal"><b><span style="font-size:10.0pt;font-family:"Times New Roman","serif";color:#595959">f</span></b><span style="font-size:10.0pt;font-family:"Times New Roman","serif";color:#595959"> +1 206 749 0665 </span></p><p class="ecxMsoNormal"><span style="font-size:10.0pt;font-family:"Times New Roman","serif";color:#595959"><a href="http://www.arup.com/" target="_blank"><span style="color:blue">www.arup.com</span></a></span></p><p class="ecxMsoNormal"> </p></div><font face="monospace">____________________________________________________________<br>
Electronic mail messages entering and leaving Arup  business<br>
systems are scanned for acceptability of content and viruses</font><br><br>--Archivo adjunto de mensaje reenviado--<br>From: bfountain@greensim.com<br>To: bldg-sim@lists.onebuilding.org; anne.moellenberndt@arup.com<br>Date: Mon, 10 Oct 2011 15:50:30 -0400<br>Subject: Re: [Bldg-sim] Modeling to the MNECB in canada<br><br>
  
<meta http-equiv="Content-Type" content="text/html; charset=unicode">
<meta name="Generator" content="Microsoft SafeHTML">
    
  
  
    Item 1 - the ESAF's are used in defining the reference building
    envelope parameters -- that is why you must define the primary
    heating source for each zone.  In practise, you just use the energy
    consumption & costs from EE4 to populate the LEED Canada letter
    template.  The ESAF's are not used in the EA-Cr 1 or EA Pr 2
    calculations.<br>
    <br>
    Item 2 - your interpretation is not correct.  There is a document
    called the Performance Compliance for Buildings which defines the
    reference building (automatically generated by EE4).  Roughly
    translated, the reference building has a single 80% efficient boiler
    (if you have hydronic heating in the proposed building, it has 1 or
    2 chillers (2 if your plant exceeds 700 tons) with a COP of 5.2. 
    There are 3 reference building types -- single zone, residential
    (hotels, dorms etc) ... and everything else which has a VAV
    reference system type.  <br>
    <br>
    The MNECB is and old code very easy to beat.  Standard design should
    be 25% better than the MNECB (due mainly to lighting).  Good HVAC
    design (e.g. condensing boilers, dedicated OA systems and
    ventilation heat recovery) can put you 50 to 60% better than the
    MNECB.  (My office is in a building >75% better than the MNECB,
    but that is another story).<br>
    <br>
    <br>
    <br>
    On 10/10/2011 3:11 PM, Anne M. Moellenberndt wrote:
    <blockquote cite="mid:1AF72AA22F6D1B4CBA603B402ED47F046FB5E30570@AMXEXC02.global.arup.com">
      
      
      <style>
.ExternalClass p.ecxMsoNormal, .ExternalClass li.ecxMsoNormal, .ExternalClass div.ecxMsoNormal
{margin-bottom:.0001pt;font-size:11.0pt;font-family:"Calibri","sans-serif";}
.ExternalClass a:link, .ExternalClass span.ecxMsoHyperlink
{color:blue;text-decoration:underline;}
.ExternalClass a:visited, .ExternalClass span.ecxMsoHyperlinkFollowed
{color:purple;text-decoration:underline;}
.ExternalClass p.ecxMsoListParagraph, .ExternalClass li.ecxMsoListParagraph, .ExternalClass div.ecxMsoListParagraph
{margin-right:0in;margin-bottom:0in;margin-left:.5in;margin-bottom:.0001pt;font-size:11.0pt;font-family:"Calibri","sans-serif";}
.ExternalClass span.ecxEmailStyle17
{font-family:"Calibri","sans-serif";color:windowtext;}
.ExternalClass .ecxMsoChpDefault
{;}
@page WordSection1
{size:8.5in 11.0in;}
.ExternalClass div.ecxWordSection1
{page:WordSection1;}
.ExternalClass ol
{margin-bottom:0in;}
.ExternalClass ul
{margin-bottom:0in;}

</style>
      <div class="ecxWordSection1">
        <p class="ecxMsoNormal">I’m looking for some feedback from anyone
          who has used EE4 and/or modeled a building against the MNECB
          1997 in Canada.</p>
        <p class="ecxMsoNormal"> </p>
        <p class="ecxMsoListParagraph" style="text-indent:-.25in"><span style="">1.<span style="font:7.0pt\00000d\00000a              "Times New Roman"">       </span></span>How
          are the Energy Source Adjustment Factors used when modeling a
          building for LEED against the MNECB?  It appears that these
          factors are meant to be multiplied by the total energy cost
          from each type of use. I see that at least in LEED Canada NC
          1.0/1.1, the calculations for EQ p2 require 25% improvement in
          energy consumption (not cost) over MNECB. Presumably this
          requires use of the ESAF in that calculation.  However, LEED
          also requires that calculations for energy savings are based
          on energy cost. When calculating energy costs, do you have to
          use the ESAF as well as the different utility rates? Or do you
          use the actual consumption (without using the ESAF) to figure
          the cost?</p>
        <p class="ecxMsoListParagraph" style="text-indent:-.25in"><span style="">2.<span style="font:7.0pt\00000d\00000a              "Times New Roman"">       </span></span>The
          code appears to require use of baseline systems that
          completely mirror the proposed systems – boiler for boiler,
          chiller for chiller, multi-zone for multi-zone.  How have
          others found ways to show significant energy savings given
          this constraint?  The newer versions of ASHRAE allow
          comparison of a proposed ground-source heat pump system, for
          example, against a boiler heating baseline system, or a VAV
          system against a packaged system, depending on various
          factors.  But the MNECB and ASHRAE 90.1-1999 don’t allow
          this.  I am struggling to see how it would be possible to get
          more than 20-30% savings given these rules.  </p>
        <p class="ecxMsoNormal"> </p>
        <p class="ecxMsoNormal">Thanks,</p>
        <p class="ecxMsoNormal"> </p>
        <p class="ecxMsoNormal"><b><span style="font-family:"Times New\00000d\00000a              Roman","serif";color:#696EB4">Anne Marie
              Moellenberndt </span></b><span style="font-size:10.0pt;font-family:"Times New\00000d\00000a            Roman","serif";color:#595959">PE  LEED AP</span><b><span style="font-family:"Times New\00000d\00000a              Roman","serif";color:#696EB4"></span></b></p>
        <p class="ecxMsoNormal"><span style="font-size:10.0pt;font-family:"Times New\00000d\00000a            Roman","serif";color:#595959">Senior
            Mechanical Engineer  </span></p>
        <p class="ecxMsoNormal"><span style="font-size:10.0pt;font-family:"Times New\00000d\00000a            Roman","serif";color:#595959"> </span></p>
        <p class="ecxMsoNormal"><b><span style="font-size:12.0pt;font-family:"Times New\00000d\00000a              Roman","serif";color:#595959">Arup</span></b><span style="font-size:10.0pt;font-family:"Times New\00000d\00000a            Roman","serif";color:#595959"></span></p>
        <p class="ecxMsoNormal"><span style="font-size:10.0pt;font-family:"Times New\00000d\00000a            Roman","serif";color:#595959">403 Columbia
            Street Suite 220  Seattle WA 98104  </span></p>
        <p class="ecxMsoNormal"><b><span style="font-size:10.0pt;font-family:"Times New\00000d\00000a              Roman","serif";color:#595959">t</span></b><span style="font-size:10.0pt;font-family:"Times New\00000d\00000a            Roman","serif";color:#595959"> +1 206 749
            9674  <b>d</b> +1 206 493 2244  </span></p>
        <p class="ecxMsoNormal"><b><span style="font-size:10.0pt;font-family:"Times New\00000d\00000a              Roman","serif";color:#595959">f</span></b><span style="font-size:10.0pt;font-family:"Times New\00000d\00000a            Roman","serif";color:#595959"> +1 206 749
            0665 </span></p>
        <p class="ecxMsoNormal"><span style="font-size:10.0pt;font-family:"Times New\00000d\00000a            Roman","serif";color:#595959"><a href="http://www.arup.com/" target="_blank"><span style="color:blue">www.arup.com</span></a></span></p>
        <p class="ecxMsoNormal"> </p>
      </div>
      <font face="monospace">____________________________________________________________<br>
        Electronic mail messages entering and leaving Arup  business<br>
        systems are scanned for acceptability of content and viruses</font>
      <br>
      <fieldset class="ecxmimeAttachmentHeader"></fieldset>
      <br>
      <pre>_______________________________________________
Bldg-sim mailing list
<a class="ecxmoz-txt-link-freetext" href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" target="_blank">http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</a>
To unsubscribe from this mailing list send  a blank message to <a class="ecxmoz-txt-link-abbreviated" href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</a>
</pre>
      <br>
      <fieldset class="ecxmimeAttachmentHeader"></fieldset>
      <br>
      <p class="ecxavgcert" align="left">No virus found in
        this message.<br>
        Checked by AVG - <a href="http://www.avg.com" target="_blank">www.avg.com</a><br>
        Version: 10.0.1410 / Virus Database: 1520/3943 - Release Date:
        10/07/11</p>
    </blockquote>
    <br>
  
<hr size="1"><a target="_blank"></a><p class="ecxavgcert" align="left">No virus found in this message.<br>
Checked by AVG - <a href="http://www.avg.com" target="_blank">www.avg.com</a><br>
Version: 10.0.1410 / Virus Database: 1520/3943 - Release Date: 10/07/11</p></div>                                     </div></body>
</html>