<p>A resistance heater, converting 100% of its input electricity to output heat
would have a <b>3.41214 EER</b> (COP = 1), due to the fact that it takes about
0.293071 <a href="http://en.wikipedia.org/wiki/Watt_hours" title="Watt hours">watt
hours</a> to equal one <a href="http://en.wikipedia.org/wiki/BTU" title="BTU">BTU</a>.</p>

Take<i><span lang="DA"> EER = COP x 3.412</span></i>

<br><br>These curves are better explained in iesVE Software.<br><br clear="all">Regards,<br>Sanjay Cholekar<br><br>
<br><br><div class="gmail_quote">On Sat, Jul 9, 2011 at 7:19 PM, sambhav tiwari <span dir="ltr"><<a href="mailto:tiwari.sambhav@gmail.com">tiwari.sambhav@gmail.com</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex;">
Hi All,<br>
         I created a custum curve for  DX system EIR=F(PLR)<br>
<br>
Now as per doe2 manuual it is said that when we enter PLR say 0.9<br>
itgives EIR as Power inputat (90Load/Power at full ie 100load)  so<br>
like this  i had four values of part load at 0.7 .8 .9 and 1 and i<br>
calculated the corrosponding EIR as Power at that load/full load power<br>
and my EIR at different  load 0.7 ,0.8, 0.9 and 1 was0.5968,<br>
0.7193,0.8537 and 1 respectively based on this values i created a<br>
cubic curve for EIR as F(PLR)  but after making the custum curve my<br>
cooling energy in end results is going up by 15% i dont know as far as<br>
i think it should go down because at part load power consumption is<br>
less.<br>
<br>
<br>
So should  i enter EIR= as 1/cop at given load ,not as KWat given<br>
load/Kw at full load.<br>
<br>
Please give me some response.<br>
<br>
Thanks<br>
Sambhav.<br>
_______________________________________________<br>
Bldg-sim mailing list<br>
<a href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" target="_blank">http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</a><br>
To unsubscribe from this mailing list send  a blank message to <a href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</a><br>
</blockquote></div><br>