Hello, <div><br></div><div>We have a building with a dedicated fresh air unit supplying tempered air to compartment units on each floor which feed VAV boxes. Right now, this is being modelled as a separate VAV unit for each floor, with the heating and cooling capacities, fan power, etc. from the DOAS being distributed and added to the cooling capacities, fan power, etc. of the compartment units. I am not sure that this is the correct way to represent this system in EE4 and would welcome suggestions/advise on how to best model this system. </div>

<div><br></div><div>Cheers, <br clear="all"><p><span style="font-size:10.0pt;color:#31849B">___________________________________________</span></p>

<p><span style="font-size:8.0pt;color:#31849B">Oleksandra Onisko, <a href="http://B.A.Sc" target="_blank">B.A.Sc</a>., LEED AP<br></span><span style="font-family:Arial, sans-serif;font-size:11px;color:rgb(49, 132, 155)">Project Manager & Energy Modeler </span></p>

<p><font color="#31849B" face="Arial, sans-serif" size="3"><span style="font-size:8pt">
ECOVERT | Sustainability Consultants</span></font><br><font color="#31849B" face="Arial, sans-serif" size="3"><span style="font-size:8pt">                   Office 416.350.2002</span></font><font color="#595959"><br></font><span style="font-family:Arial, sans-serif;font-size:11px;color:rgb(49, 132, 155)">                   Direct Line 416.987.1105<br>

</span><span style="font-family:Arial, sans-serif;font-size:11px;color:rgb(49, 132, 155)">                   Fax 416.766.5021<br></span><span style="font-family:Arial, sans-serif;font-size:11px;color:rgb(49, 132, 155)">                   55 Ormskirk Avenue<br>

</span><span style="font-family:Arial, sans-serif;font-size:11px;color:rgb(49, 132, 155)">                   Toronto, ON, M6S 4V6<br></span><span style="font-family:Arial, sans-serif;font-size:11px;color:rgb(49, 132, 155)"><span style="color:#31849B">                   <a href="http://www.ecovert.ca" target="_blank">www.ecovert.ca</a></span></span></p>

<br>
</div>