Hi Claire<br><br>We've just done a job in IES-VE 90.1 Ashrae toolkit which took a lot of the set up pain out of the picture for job there, which I imagine you will have access to at HL. As far as I can tell it should be acceptable to use that methodology for Estidama as we've proposed that on a few jobs and have never been told otherwise. I do of course stand to be corrected by all and sundry here.<br><br>Kind Regards<br><br>Paul<br><br><br><br>Sent from my HTC<br><br>Dr Paul Carey<br>Director<br><br>Zero Energy Design Ltd<br>10a Portland Place<br>2-22 Mottram Road<br>Stalybridge<br>Cheshire<br>UK<br>SK15 3AD<br><br>Tel - +44 161 3386200<br>Mob - +44 789 4098012<br>Email - paul@zed-uk.com<br><br><br><br>----- Reply message -----<br>From: "Marcus" <jones.0bj3@gmail.com><br>Date: Tue, Apr 26, 2011 19:34<br>Subject: [Bldg-sim] ASHRAE 90.2 Modelling for Estidama (Abu Dhabi)<br>To: <br>Cc: "<bldg-sim@lists.onebuilding.org>" <bldg-sim@lists.onebuilding.org>, "Audley Franklin" <AudleyFranklin@hoarelea.com>, "Aaron Gillich" <AaronGillich@hoarelea.com><br><br><br>I've only done 90.1 modeling for Estidama PBRS, but I took a look into 90.2<br>out of interest.<br><br><br>   - What heating and cooling systems should be used in the baseline<br>   (prescriptive) building?<br>      - From 90.2-2007 sec. 8.8.4.1., "equipment of the same DOE product<br>      class shall be used in the proposed design and prescriptive..."<br>      - Therefore it depends on your proposed system...<br>      - What ventilation system/ fan powers should be used in the baseline<br>   (prescriptive) building?<br>      - 8.8.4.3., the prescriptive design shall have a similar system<br>      meeting the prescriptive requirements"<br>      - Also depends on system... I might use same fan powers for both or<br>      maybe try the 90.1 sec. G3.1.2.9. fan specs?<br>      - What should the COPs/ EERs/ efficiencies be for these systems?<br>      - From 90.2-2007 sec. 6.9., the equipment performance shall be "in<br>      accordance with federal law or as specified in Table 6.9"<br>      - Therefore if no federal law, use table 6.9<br><br>Hopefully someone with more experience can answer the question more directly<br>or correct me since I haven't submitted any PVRS, and I recommend raising a<br>CCR to UPC if you still have trouble.<br><br>Cheers, and I hope you report your eventual solution!<br><br>Marcus<br>-- <br>Marcus Jones, LEED AP, M.Sc.<br>*Freelance energy consultant*<br>*Vienna, Austria*<br><br><br>On Tue, Apr 26, 2011 at 3:09 PM, Arpan Bakshi <arpanbakshi@gmail.com> wrote:<br><br>> Claire<br>><br>> You are right, Estidama is still in a stage of infancy. When I work on an<br>> Estidama project I develop a baseline by identifying the climate to an<br>> ASHRAE climate zone based on the number of heating and cooling degree days.<br>> You can then make the case for ASHRAE climate zone 1 efficiencies as the<br>> code compliance standard and governing minimum performance.<br>><br>><br>><br>><br>><br>> Arpan Bakshi, LEED AP BD+C<br>> YRG sustainability<br>><br>> On Apr 26, 2011, at 7:30 AM, "Claire Das Bhaumik" <<br>> ClaireDasBhaumik@hoarelea.com> wrote:<br>><br>>  I am carrying out modelling in support of an Estidama (PVRS v1.0)<br>> assessment for a residential development in Abu Dhabi.<br>><br>><br>><br>> Estidama uses the use the Energy cost method in section 8 of ASHRAE 90.2.<br>> However, 90.2 requires the use of HVAC efficiencies in accordance with<br>> federal law. There is currently no federal law regarding efficiencies of<br>> HVAC in Abu Dhabi, although there is the Abu Dhabi International Building<br>> code, which I believe is not yet mandatory but does include minimum<br>> efficiencies.<br>><br>><br>><br>> My questions are:<br>><br>><br>><br>>    - What heating and cooling systems should be used in the baseline<br>>    (prescriptive) building?<br>>    - What ventilation system/ fan powers should be used in the baseline<br>>    (prescriptive) building?<br>>    - What should the COPs/ EERs/ efficiencies be for these systems?<br>><br>><br>><br>> Thanks,<br>><br>> Claire<br>>  *<br>><br>> This email (and any attachment) is intended only for the attention of the<br>> addressee. It is STRICTLY CONFIDENTIAL and may be legally privileged. If you<br>> have received it in error any disclosure distribution or copying of all or<br>> any part of the contents is prohibited. While virus checked by Hoare Lea,<br>> the recipient remains responsible for the consequences of any virus<br>> received.<br>> *<br>><br>> _______________________________________________<br>> Bldg-sim mailing list<br>> <a href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org">http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</a><br>> To unsubscribe from this mailing list send  a blank message to<br>> <BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG>BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG<br>><br>><br>> _______________________________________________<br>> Bldg-sim mailing list<br>> <a href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org">http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</a><br>> To unsubscribe from this mailing list send  a blank message to<br>> BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG<br>><br>><br><br><br>