<font size="2"><font face="tahoma,sans-serif">Hello All,</font></font><div><font size="2"><font face="tahoma,sans-serif"><br></font></font></div><div><font size="2"><font face="tahoma,sans-serif">According to the District Thermal Energy v2 document on the treatment of campus plants, the baseline systems have to altered in concert with the changes provided in Table 3 of the document.</font></font></div>
<div><font size="2"><font face="tahoma,sans-serif"><br></font></font></div><div><font size="2"><font face="tahoma,sans-serif">In Table 3, System 3 of Appendix-G is revised as a <u>4-pipe CV AHU</u>, if the proposed system uses district energy for both cooling and heating.</font></font></div>
<div><font size="2"><font face="tahoma,sans-serif"><br></font></font></div><div><font size="2"><font face="tahoma,sans-serif">My question is - Does 4-pipe CV AHU mean a single constant volume air handler for the whole building? or would it again be single-zone systems as System 3 of Appendix-G was supposed to be?</font></font></div>
<div><font size="2"><font face="tahoma,sans-serif"><br></font></font></div><div><font size="2"><font face="tahoma,sans-serif">It would be great if anyone can throw some light on this.</font></font></div><div><font size="2"><font face="tahoma,sans-serif"><br>
</font></font></div><div><font size="2"><font face="tahoma,sans-serif">Thank you.</font></font></div><div><font size="2"><font face="tahoma,sans-serif"><br></font></font></div><div><font size="2"><font face="tahoma,sans-serif">Regards,</font></font></div>
<div><font size="2"><font face="tahoma,sans-serif">Vinay</font></font></div>