<p style="MARGIN: 0in 0in 0pt" class="MsoNormal"><font size="3"><font face="Calibri">Dear All,</font></font></p>
<p style="MARGIN: 0in 0in 0pt" class="MsoNormal"><font size="3" face="Calibri"> </font></p>
<p style="MARGIN: 0in 0in 0pt" class="MsoNormal"><font size="3"><font face="Calibri">In one of our project the electricity to run all the building uses is produced by the DG set with in the building Campus. The grid electricity is not available at the site and the DG sets are used to produce the electricity for the building end-uses.</font></font></p>

<p style="MARGIN: 0in 0in 0pt" class="MsoNormal"><font size="3" face="Calibri"> </font></p>
<p style="MARGIN: 0in 0in 0pt" class="MsoNormal"><font size="3"><font face="Calibri">How should I compare the end-use energy cost of Ashrae BaseCase and my Proposed Case? </font></font></p>
<div style="MARGIN: 0in 0in 0pt" class="MsoNormal"><font size="3"><font face="Calibri">Should I take the Ashrae BaseCase also running with DG sets and finally compare the cost with diesel to diesel only . </font></font></div>

<div style="MARGIN: 0in 0in 0pt" class="MsoNormal"><font size="3"><font face="Calibri"></font></font> </div>
<div style="MARGIN: 0in 0in 0pt" class="MsoNormal"><font size="3"><font face="Calibri">Ankur Khandelwal</font></font></div>
<div style="MARGIN: 0in 0in 0pt" class="MsoNormal"><font size="3"><font face="Calibri"></font></font> </div>