<br>
I would like to extend a very grateful thank you to the EnergyPlus development team for the improvements made to model <span class="il">run</span>-<span class="il">time</span> found in EnergyPlus v.6<br>
<br>
I have a very large project for which the energy model required just over 40 hours of <span class="il">run</span>-<span class="il">time</span> to complete a detailed model in version 5.<br>
<br>
I added Output:Diagnostics,<p>CreateMinimalSurfaceVariables; and also changed any parameters that I could to speed up the <span class="il">run</span>-<span class="il">time</span>, and it still took 13 hours in version 5 to complete the <span class="il">run</span>.<br>

<br>
I simply transitioned this file into version 6 and the <span class="il">run</span> completed in 2 hours!!!<br>
<br>
If you are an energy modeler who has avoided adopting EnergyPlus due to concerns about <span class="il">run</span>-<span class="il">time</span>,
I would say that the developers have done a wonderful job of addressing
this issue. I have found that, with the most recent version, models can
be <span class="il">run</span> in a reasonable amount of <span class="il">time</span> regardless of the complexity of the geometry and/or systems.<br>
<br>
Many Thanks,<br>
<br>
Jason Kirkpatrick, LEED AP<br>
Skidmore Owings & Merrill<br>
2001 K St NW<br>
Washington, DC 20006<br>
202.367.2564<br>
<a href="mailto:Jason.Kirkpatrick%40SOM.com" target="_blank">Jason.Kirkpatrick@SOM.com</a><br>
</p>