A School with plant already existing, a small addition is made to the
existing school (not separate, more like an extension). The addition has separate space supply
equipments (downstream), but acquires energy from the existing plant
(upstream). And, the addition is the only portion going for LEED accreditation. I
have gotten to know that I would have to build the whole building for
energy model. <br>
<br>Does this situation coincide with the DES (District Energy System) scenario?<br><br>Any
help would be great.<br><br>Thank you.