<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=us-ascii">
<STYLE type=text/css>DIV {
        MARGIN: 0px
}
</STYLE>

<META content="MSHTML 6.00.6000.16890" name=GENERATOR></HEAD>
<BODY>
<DIV dir=ltr align=left><SPAN class=321194715-21052010><FONT face=Arial 
color=#0000ff size=2>John,</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=321194715-21052010><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN>&nbsp;</DIV>
<DIV dir=ltr align=left><SPAN class=321194715-21052010><FONT face=Arial 
color=#0000ff size=2>Looks like I might have awakened a sleeping giant...been 
around awhile, huh?&nbsp; Are you going to tell us how it worked 
out?</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=321194715-21052010><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN>&nbsp;</DIV>
<DIV dir=ltr align=left><SPAN class=321194715-21052010><FONT face=Arial 
color=#0000ff size=2>Glenn</FONT></SPAN></DIV><BR>
<DIV class=OutlookMessageHeader lang=en-us dir=ltr align=left>
<HR tabIndex=-1>
<FONT face=Tahoma size=2><B>From:</B> John Aulbach [mailto:jra_sac@yahoo.com] 
<BR><B>Sent:</B> Friday, May 21, 2010 11:34 AM<BR><B>To:</B> Haynes, Glenn; 
Chris; backer@uidaho.edu; paul@zed-uk.com; thomasv@iit.edu<BR><B>Cc:</B> 
bldg-sim@lists.onebuilding.org<BR><B>Subject:</B> Re: [Bldg-sim] Fwd: Re: RE: 
Voodoo Engineering<BR></FONT><BR></DIV>
<DIV></DIV>
<DIV 
style="FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new york, times, serif">
<DIV>I did all that 30 years ago using the Meriwether ESAS program for Hilton 
Hotels. Before DOE-2. Before DOE-1 !!<BR></DIV>
<DIV 
style="FONT-SIZE: 12pt; FONT-FAMILY: times new roman, new york, times, serif"><BR>
<DIV style="FONT-SIZE: 13px; FONT-FAMILY: arial, helvetica, sans-serif"><FONT 
face=Tahoma size=2>
<HR SIZE=1>
<B><SPAN style="FONT-WEIGHT: bold">From:</SPAN></B> "Haynes, Glenn" 
&lt;Glenn.Haynes@kema.com&gt;<BR><B><SPAN 
style="FONT-WEIGHT: bold">To:</SPAN></B> Chris &lt;chris@zed-uk.com&gt;; 
backer@uidaho.edu; paul@zed-uk.com; thomasv@iit.edu<BR><B><SPAN 
style="FONT-WEIGHT: bold">Cc:</SPAN></B> 
bldg-sim@lists.onebuilding.org<BR><B><SPAN 
style="FONT-WEIGHT: bold">Sent:</SPAN></B> Fri, May 21, 2010 8:22:53 
AM<BR><B><SPAN style="FONT-WEIGHT: bold">Subject:</SPAN></B> Re: [Bldg-sim] Fwd: 
Re: RE: Voodoo Engineering<BR></FONT><BR>Chris,<BR><BR>You make a good point, 
and it also can apply to centrifugal chillers,<BR>which are sometimes most 
efficient at 60-80% loaded.&nbsp; But you still have<BR>to remember that the 
client has to pay for the larger equipment, which<BR>costs more, plus larger 
system components (which cost more) and more<BR>space (which costs 
more).<BR><BR>You also maake a good point about the system loads 90% of the 
time,<BR>which raises an interesting question regarding sizing for 
optimum<BR>operating efficiency.&nbsp; What if we sized certain types of 
equipment to<BR>meet the most predominant loads within their most efficient 
capacity<BR>ranges?&nbsp; That is not difficult when using hourly simulation 
software.<BR>Of course, you have to keep an eye on peak loads and 
capacities.&nbsp; I<BR>haven't thought this through yet, but I'll bet someone 
else has.<BR><BR>Thanks,<BR>Glenn<BR><BR>-----Original Message-----<BR>From: 
"Chris" [mailto:<A href="mailto:chris@zed-uk.com" 
ymailto="mailto:chris@zed-uk.com">chris@zed-uk.com</A>] <BR>Sent: Thursday, May 
20, 2010 7:13 PM<BR>To: Haynes, Glenn; <A href="mailto:backer@uidaho.edu" 
ymailto="mailto:backer@uidaho.edu">backer@uidaho.edu</A>; <A 
href="mailto:paul@zed-uk.com" 
ymailto="mailto:paul@zed-uk.com">paul@zed-uk.com</A>; <A 
href="mailto:thomasv@iit.edu" 
ymailto="mailto:thomasv@iit.edu">thomasv@iit.edu</A><BR>Cc: <A 
href="mailto:bldg-sim@lists.onebuilding.org" 
ymailto="mailto:bldg-sim@lists.onebuilding.org">bldg-sim@lists.onebuilding.org</A><BR>Subject: 
Re: [Bldg-sim] Fwd: Re: RE: Voodoo Engineering<BR><BR>Glenn,<BR><BR>Oversize 
isn't always bad! A condensing boiler is generally at its most<BR>efficient at 
&lt; 20% of its capacity.<BR><BR>All the same, the mid-season is largely ignored 
when it comes to sizing.<BR>Ridiculous really, when you think this is where the 
plant will be 90% of<BR>the time.<BR><BR>Perhaps this is more of an issue when 
you are shifting large amounts of<BR>chilled water to various pieces of zone 
equipment but has anybody<BR>considered Valve Authority? Unfortunately my 
experience is limited when<BR>it comes to the nitty gritty of piping networks. 
But, I do know one<BR>thing: valve response is not linear, especially if there 
is a<BR>substantial head in the system. My hunch is mid season control could 
get<BR>really messed up if plant has spare capacity but designers haven't 
been<BR>quite as generous with pipe sizes.<BR><BR>Such questions should be in 
the domain of simulation in the next few<BR>years.<BR><BR>Chris<BR><BR>on 
20/5/10 8:15 PM, "Haynes, Glenn" &lt;<A href="mailto:Glenn.Haynes@kema.com" 
ymailto="mailto:Glenn.Haynes@kema.com">Glenn.Haynes@kema.com</A>&gt; 
wrote:<BR><BR>&gt; Brad,<BR>&gt;<BR>&gt; I did HVAC design consulting for 14 
years, and I used to oversize <BR>&gt; systems just like everyone else.&nbsp; 
Now I am an energy conservation <BR>&gt; programs evaluator, and have discovered 
the extent and negative <BR>&gt; impacts of over sizing.&nbsp; Not speaking for 
all designers who oversize, <BR>&gt; I did it mainly out of willful 
ignorance.&nbsp; It was easier for me to <BR>&gt; loosely calculate the peak 
loads and then beef those estimates up <BR>&gt; enough to safely cover and 
mistakes or false assumptions than it was <BR>&gt; to calculate the loads with 
enough confidence to properly size the <BR>&gt; systems.&nbsp; I believed in the 
old adage that too much is just right from<BR><BR>&gt; my perspective, because 
it minimized risk.<BR>&gt;<BR>&gt; But now I have to measure the effects of 
excessive over sizing and see<BR><BR>&gt; the results, some of which are poor 
humidity control, short cycling, <BR>&gt; reduced system operating efficiency 
and higher first cost to the<BR>owner.<BR>&gt; My DOE2 models usually indicate 
peak (I mean absolute hourly peak <BR>&gt; loads) at about 20% less than Manual 
J loads, on average, for <BR>&gt; residential applications.&nbsp; But even 
Manual J allows up to 20% above <BR>&gt; their calculated loads, which have 
already been calculated using <BR>&gt; conservative estimates for most inputs 
that are not explicitly <BR>&gt; defined.&nbsp; The observed<BR>&gt; (measured) 
field results have proven the average residential AC system<BR><BR>&gt; to be 
about 70% to 75% oversized, with some as high as 200% (that's 3 <BR>&gt; times 
the peak load).&nbsp; 20% to 25% over ASHRAE's 2.5% design standard <BR>&gt; is 
acceptable to me now, but anything above 25% without some <BR>&gt; overriding 
owner requirement (plans to add on to the current building,<BR><BR>&gt; etc.) 
begins to waste the owner's resources (from first cost to energy<BR><BR>&gt; and 
maintenance costs) and reduce the lifetime of the equipment while <BR>&gt; at 
the same time decreasing his overall level of comfort through <BR>&gt; limited 
latent performance.<BR>&gt;<BR>&gt; There!&nbsp; You obviously rubbed a sore 
spot in my emotional make-up, but <BR>&gt; I appreciate the opportunity to make 
a point.&nbsp; And the point is this: <BR>&gt; no matter how good your modeling 
software is, the outcome is still in <BR>&gt; the hands of the 
user.<BR>&gt;<BR>&gt; Glenn<BR>&gt;<BR>&gt; -----Original Message-----<BR>&gt; 
From: <A href="mailto:bldg-sim-bounces@lists.onebuilding.org" 
ymailto="mailto:bldg-sim-bounces@lists.onebuilding.org">bldg-sim-bounces@lists.onebuilding.org</A><BR>&gt; 
[mailto:<A href="mailto:bldg-sim-bounces@lists.onebuilding.org" 
ymailto="mailto:bldg-sim-bounces@lists.onebuilding.org">bldg-sim-bounces@lists.onebuilding.org</A>] 
On Behalf Of Acker, <BR>&gt; Brad<BR>&gt; Sent: Thursday, May 20, 2010 1:45 
PM<BR>&gt; To: Paul Carey; Chris Yates; Varkie C Thomas<BR>&gt; Cc: <A 
href="mailto:bldg-sim@lists.onebuilding.org" 
ymailto="mailto:bldg-sim@lists.onebuilding.org">bldg-sim@lists.onebuilding.org</A><BR>&gt; 
Subject: Re: [Bldg-sim] Fwd: Re: RE: Voodoo Engineering<BR>&gt;<BR>&gt; I do not 
do modeling on a daily basis so I'm not as experience as many<BR><BR>&gt; other 
here. I do agree modeling just for LEED is silly. I have seen <BR>&gt; modeling 
inform designs, reduce loads, and SIZE SYSTEMS. This last <BR>&gt; part is what 
most bugs me. Why do people put so much effort into <BR>&gt; models and then not 
use them to size the systems? Preventing over <BR>&gt; sizing is a great benefit 
of modeling. What is your experience with <BR>&gt; using models to size systems? 
Why do engineers fall back on the vendor<BR><BR>&gt; based programs and 9 out of 
10 times end up over sizing systems?<BR>&gt;<BR>&gt; Brad Acker, 
P.E.<BR>&gt;<BR>&gt; -----Original Message-----<BR>&gt; From: <A 
href="mailto:bldg-sim-bounces@lists.onebuilding.org" 
ymailto="mailto:bldg-sim-bounces@lists.onebuilding.org">bldg-sim-bounces@lists.onebuilding.org</A><BR>&gt; 
[mailto:<A href="mailto:bldg-sim-bounces@lists.onebuilding.org" 
ymailto="mailto:bldg-sim-bounces@lists.onebuilding.org">bldg-sim-bounces@lists.onebuilding.org</A>] 
On Behalf Of Paul <BR>&gt; Carey<BR>&gt; Sent: Thursday, May 20, 2010 3:42 
AM<BR>&gt; To: 'Chris Yates'; 'Varkie C Thomas'<BR>&gt; Cc: <A 
href="mailto:bldg-sim@lists.onebuilding.org" 
ymailto="mailto:bldg-sim@lists.onebuilding.org">bldg-sim@lists.onebuilding.org</A><BR>&gt; 
Subject: Re: [Bldg-sim] Fwd: Re: RE: Voodoo Engineering<BR>&gt;<BR>&gt; Just to 
add a couple of points to this interesting debate.<BR>&gt;<BR>&gt; I see the 
problem being that, as we increasingly set more defined <BR>&gt; limits 
regarding energy modelling and its role in building regulation,<BR><BR>&gt; we 
are seeing buildings that are being built and designed to purely <BR>&gt; meet 
compliance.&nbsp; This is in some part is useful as it brings all <BR>&gt; 
buildings up to a minimum standard, the flip side of that problem is <BR>&gt; 
that it also means, that to many developers this means there is no <BR>&gt; 
incentive to strive for alternatives or innovative solutions.&nbsp; It can 
<BR>&gt; also allow therefore lead to the use of simpler tools that meet those 
<BR>&gt; prescribed limits, but really don't push the boundaries of 
engineering<BR><BR>&gt; design enhancement of buildings.<BR>&gt;<BR>&gt; The 
correct implementation and use of energy modelling need not be a <BR>&gt; 
hindrance to projects nor be seen as a necessary "extra" or evil if <BR>&gt; you 
consider the design process as a whole.&nbsp; If you use the tools at <BR>&gt; 
the concept or schematic design phases, this can quantitatively <BR>&gt; confirm 
an engineer's instinct or gained experience in way that will <BR>&gt; enable 
them to show compliance later on. It will then allow the team <BR>&gt; to come 
to a decision on the most energy efficient but also compliant <BR>&gt; route of 
design earlier on in the design stage and should stop the <BR>&gt; repeat 
iteration of designs as the building design progresses and <BR>&gt; therefore 
reduce design costs and with luck increase productivity and<BR>profit 
accordingly.<BR>&gt; Fanciful dream perhaps, but it does work.<BR>&gt;<BR>&gt; I 
visited an architect a while back and he said to me "Why do I need <BR>&gt; to 
do modelling, I know the principles of good low energy design, I <BR>&gt; can 
read books<BR>&gt; and learn more if I need to".&nbsp; To which I replied, "Well 
every time<BR>you<BR>&gt; send me a job to check for building regulation 
compliance 3 weeks <BR>&gt; before it goes before a planning team, I normally 
have to tell you <BR>&gt; what you need to do in terms of meeting compliance as 
your buildings <BR>&gt; are consistently failing and you then have to rush to 
make those <BR>&gt; changes.&nbsp; I am effectively designing your buildings for 
you, so if you<BR><BR>&gt; want to continue without using energy modelling then 
please carry on, <BR>&gt; and I'll continue to design your buildings."<BR>&gt; 
As you can imagine this was one of those Eureka moments for this <BR>&gt; 
Architect, as I waved my red rag in front of his face.<BR>&gt;<BR>&gt; My 
tuppence worth.<BR>&gt;<BR>&gt; Paul<BR>&gt;<BR>&gt; -----Original 
Message-----<BR>&gt; From: <A 
href="mailto:bldg-sim-bounces@lists.onebuilding.org" 
ymailto="mailto:bldg-sim-bounces@lists.onebuilding.org">bldg-sim-bounces@lists.onebuilding.org</A><BR>&gt; 
[mailto:<A href="mailto:bldg-sim-bounces@lists.onebuilding.org" 
ymailto="mailto:bldg-sim-bounces@lists.onebuilding.org">bldg-sim-bounces@lists.onebuilding.org</A>] 
On Behalf Of Chris <BR>&gt; Yates<BR>&gt; Sent: 20 May 2010 07:55<BR>&gt; To: 
Varkie C Thomas<BR>&gt; Cc: <A href="mailto:bldg-sim@lists.onebuilding.org" 
ymailto="mailto:bldg-sim@lists.onebuilding.org">bldg-sim@lists.onebuilding.org</A><BR>&gt; 
Subject: Re: [Bldg-sim] Fwd: Re: RE: Voodoo Engineering<BR>&gt;<BR>&gt; 
Varkie<BR>&gt;<BR>&gt; Vast subject. Kudos for condensing it whilst conveying 
all the <BR>&gt; necessary meaning.<BR>&gt;<BR>&gt; We are now at a point where 
Energy Modellers are at the very least <BR>&gt; specialist engineers. In fact, 
you could say the best are indeed <BR>&gt; "wizards"!<BR>&gt;<BR>&gt; 
Chris<BR>&gt;<BR>&gt; Sent from my iPhone<BR>&gt;<BR>&gt; On 19 May 2010, at 
21:35, Varkie C Thomas &lt;<A href="mailto:thomasv@iit.edu" 
ymailto="mailto:thomasv@iit.edu">thomasv@iit.edu</A>&gt; 
wrote:<BR>&gt;<BR>&gt;&gt; Since my response has ended up on Bldg-Sim, I might 
as well include <BR>&gt;&gt; the attachment with the response which gave my 
views <BR>&gt;&gt; &lt;Building-Energy-Programs-VCT.doc&gt;<BR>&gt;&gt; I am 
including the attachment that I included with my earlier <BR>&gt;&gt; 
response<BR>&gt;<BR>&gt;&gt; to John Eurek. Using energy programs is like voodoo 
engineering if <BR>&gt;&gt; you<BR>&gt;<BR>&gt;&gt; don't understand its 
engineering basis.&nbsp; It analyzes the various <BR>&gt;&gt; options 
quantitatively.&nbsp; It cannot be used as a magic black box.<BR>&gt;&gt; 
Experience and judgement have to applied to the results.<BR>&gt;&gt;<BR>&gt;&gt; 
----- Original Message -----<BR>&gt;&gt; From: Eric O'Neill &lt;<A 
href="mailto:elo@MichaelsEngineering.com" 
ymailto="mailto:elo@MichaelsEngineering.com">elo@MichaelsEngineering.com</A>&gt;<BR>&gt;&gt; 
Date: Wednesday, May 19, 2010 12:03 pm<BR>&gt;&gt; Subject: RE: Voodoo 
Engineering<BR>&gt;&gt;<BR>&gt;&gt;&gt; John,<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; 
The purpose of energy modeling is to identify differences between 
<BR>&gt;&gt;&gt; two<BR>&gt;<BR>&gt;&gt;&gt; energy related setups. The idea is 
to tell you how much you could <BR>&gt;&gt;&gt; conceivably save by switching 
from one design to another. This is <BR>&gt;&gt;&gt; usefulfor a payback 
analysis or life cycle cost analysis.<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; Hope this 
helps, (I'm really not trying to be inflammatory :) 
)<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; Eric<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; 
-----Original Message-----<BR>&gt;&gt;&gt; From: Eurek, John S NWO [mailto:<A 
href="mailto:John.S.Eurek@usace.army.mil" 
ymailto="mailto:John.S.Eurek@usace.army.mil">John.S.Eurek@usace.army.mil</A>]<BR>&gt;&gt;&gt; 
Sent: Wednesday, May 19, 2010 11:19 AM<BR>&gt;&gt;&gt; To: Varkie C 
Thomas<BR>&gt;&gt;&gt; Cc: Eric O'Neill; <A href="mailto:cmg750@gmail.com" 
ymailto="mailto:cmg750@gmail.com">cmg750@gmail.com</A><BR>&gt;&gt;&gt; Subject: 
RE: Voodoo Engineering<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; Varkie, I read your 
attached paper.<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; "Energy programs are external to 
the design process. The results are<BR><BR>&gt;&gt;&gt; not used to generate 
construction drawings."&nbsp; This may be my #1 beef<BR><BR>&gt;&gt;&gt; with 
energymodeling.&nbsp; What is the purpose?<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; If 
you say, to save energy...&nbsp; It does 
not.<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; John Eurek<BR>&gt;&gt;&gt; 
LEEP AP<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; -----Original 
Message-----<BR>&gt;&gt;&gt; From: Varkie C Thomas [mailto:<A 
href="mailto:thomasv@iit.edu" 
ymailto="mailto:thomasv@iit.edu">thomasv@iit.edu</A>]<BR>&gt;&gt;&gt; Sent: 
Wednesday, May 19, 2010 10:08 AM<BR>&gt;&gt;&gt; To: Eurek, John S 
NWO<BR>&gt;&gt;&gt; Subject: Voodoo Engineering<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; 
Academia institutions and research centers tend to attach <BR>&gt;&gt;&gt; 
disproportionate amount of importance to energy modeling.&nbsp; Most 
them<BR><BR>&gt;&gt;&gt; have not dealt withreal buildings.&nbsp; Attached are 
my views on energy <BR>&gt;&gt;&gt; modeling.<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; 
----- Original Message -----<BR>&gt;&gt;&gt; From: "Eurek, John S NWO" &lt;<A 
href="mailto:John.S.Eurek@usace.army.mil" 
ymailto="mailto:John.S.Eurek@usace.army.mil">John.S.Eurek@usace.army.mil</A>&gt;<BR>&gt;&gt;&gt; 
Date: Wednesday, May 19, 2010 8:14 am<BR>&gt;&gt;&gt; Subject: Re: 
[Equest-users] Compliance rule set for 
Oregon<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt;&gt;<BR>&gt;&gt;&gt;&gt; I would prefer 
Lynn work to ban/destroy/do-away-with energy<BR>&gt;&gt;&gt; 
modeling.&gt;<BR>&gt;&gt;&gt;&gt; Any chance this voo-doo engineering will go 
away any time soon?<BR>&gt;&gt;&gt;&gt; It is only<BR>&gt;&gt;&gt;&gt; 
statistical analysis with no meaningful/useful results for 
anyone.<BR>&gt;&gt;&gt;&gt;<BR>&gt;&gt;&gt;&gt; As a community I think we are 
going in the wrong direction for<BR>&gt;&gt;&gt; the<BR>&gt;&gt;&gt;&gt; 
rightgoals.<BR>&gt;&gt;&gt;&gt;<BR>&gt;&gt;&gt;&gt; -----Original 
Message-----<BR>&gt;&gt;&gt;&gt; From: <A 
href="mailto:equest-users-bounces@lists.onebuilding.org" 
ymailto="mailto:equest-users-bounces@lists.onebuilding.org">equest-users-bounces@lists.onebuilding.org</A><BR>&gt;&gt;&gt;&gt; 
[mailto:<A href="mailto:equest-users-bounces@lists.onebuilding.org" 
ymailto="mailto:equest-users-bounces@lists.onebuilding.org">equest-users-bounces@lists.onebuilding.org</A>] 
On Behalf Of<BR>&gt;&gt;&gt; Carol<BR>&gt;&gt;&gt;&gt; 
Gardner<BR>&gt;&gt;&gt;&gt; Sent: Wednesday, May 19, 2010 12:30 
AM<BR>&gt;&gt;&gt;&gt; To: Scott Criswell<BR>&gt;&gt;&gt;&gt; Cc: <A 
href="mailto:equest-users@lists.onebuilding.org" 
ymailto="mailto:equest-users@lists.onebuilding.org">equest-users@lists.onebuilding.org</A>; 
<A href="mailto:curt.strobehn@eesinet.com" 
ymailto="mailto:curt.strobehn@eesinet.com">curt.strobehn@eesinet.com</A><BR>&gt;&gt;&gt;&gt; 
Subject: Re: [Equest-users] Compliance rule set for 
Oregon<BR>&gt;&gt;&gt;&gt;<BR>&gt;&gt;&gt;&gt; 
All,<BR>&gt;&gt;&gt;&gt;<BR>&gt;&gt;&gt;&gt; Lynn Bellenger will soon be the 
first female president of ASHRAE..<BR>&gt;&gt; 
_______________________________________________<BR>&gt;&gt; Bldg-sim mailing 
list<BR>&gt;&gt; <A 
href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" 
target=_blank>http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</A><BR>&gt;&gt; 
To unsubscribe from this mailing list send&nbsp; a blank message to<BR>&gt; <A 
href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG" 
ymailto="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</A><BR>&gt; 
_______________________________________________<BR>&gt; Bldg-sim mailing 
list<BR>&gt; <A 
href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" 
target=_blank>http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</A><BR>&gt; 
To unsubscribe from this mailing list send&nbsp; a blank message to <BR>&gt; <A 
href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG" 
ymailto="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</A><BR>&gt;<BR>&gt; 
_______________________________________________<BR>&gt; Bldg-sim mailing 
list<BR>&gt; <A 
href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" 
target=_blank>http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</A><BR>&gt; 
To unsubscribe from this mailing list send&nbsp; a blank message to <BR>&gt; <A 
href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG" 
ymailto="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</A><BR>&gt; 
_______________________________________________<BR>&gt; Bldg-sim mailing 
list<BR>&gt; <A 
href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" 
target=_blank>http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</A><BR>&gt; 
To unsubscribe from this mailing list send&nbsp; a blank message to <BR>&gt; <A 
href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG" 
ymailto="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</A><BR>&gt;<BR>&gt;<BR>&gt;<BR>_______________________________________________<BR>Bldg-sim 
mailing list<BR><A 
href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" 
target=_blank>http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</A><BR>To 
unsubscribe from this mailing list send&nbsp; a blank message to <A 
href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG" 
ymailto="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</A><BR></DIV></DIV></DIV><BR></BODY></HTML>