<html><head><style type="text/css"><!-- DIV {margin:0px;} --></style></head><body><div style="font-family:times new roman, new york, times, serif;font-size:12pt"><DIV>I did all that 30 years ago using the Meriwether ESAS program for Hilton Hotels. Before DOE-2. Before DOE-1 !!<BR></DIV>
<DIV style="FONT-FAMILY: times new roman, new york, times, serif; FONT-SIZE: 12pt"><BR>
<DIV style="FONT-FAMILY: arial, helvetica, sans-serif; FONT-SIZE: 13px"><FONT size=2 face=Tahoma>
<HR SIZE=1>
<B><SPAN style="FONT-WEIGHT: bold">From:</SPAN></B> "Haynes, Glenn" &lt;Glenn.Haynes@kema.com&gt;<BR><B><SPAN style="FONT-WEIGHT: bold">To:</SPAN></B> Chris &lt;chris@zed-uk.com&gt;; backer@uidaho.edu; paul@zed-uk.com; thomasv@iit.edu<BR><B><SPAN style="FONT-WEIGHT: bold">Cc:</SPAN></B> bldg-sim@lists.onebuilding.org<BR><B><SPAN style="FONT-WEIGHT: bold">Sent:</SPAN></B> Fri, May 21, 2010 8:22:53 AM<BR><B><SPAN style="FONT-WEIGHT: bold">Subject:</SPAN></B> Re: [Bldg-sim] Fwd: Re: RE: Voodoo Engineering<BR></FONT><BR>Chris,<BR><BR>You make a good point, and it also can apply to centrifugal chillers,<BR>which are sometimes most efficient at 60-80% loaded.&nbsp; But you still have<BR>to remember that the client has to pay for the larger equipment, which<BR>costs more, plus larger system components (which cost more) and more<BR>space (which costs more).<BR><BR>You also maake a good point about the system loads 90% of the time,<BR>which raises an interesting
 question regarding sizing for optimum<BR>operating efficiency.&nbsp; What if we sized certain types of equipment to<BR>meet the most predominant loads within their most efficient capacity<BR>ranges?&nbsp; That is not difficult when using hourly simulation software.<BR>Of course, you have to keep an eye on peak loads and capacities.&nbsp; I<BR>haven't thought this through yet, but I'll bet someone else has.<BR><BR>Thanks,<BR>Glenn<BR><BR>-----Original Message-----<BR>From: "Chris" [mailto:<A href="mailto:chris@zed-uk.com" ymailto="mailto:chris@zed-uk.com">chris@zed-uk.com</A>] <BR>Sent: Thursday, May 20, 2010 7:13 PM<BR>To: Haynes, Glenn; <A href="mailto:backer@uidaho.edu" ymailto="mailto:backer@uidaho.edu">backer@uidaho.edu</A>; <A href="mailto:paul@zed-uk.com" ymailto="mailto:paul@zed-uk.com">paul@zed-uk.com</A>; <A href="mailto:thomasv@iit.edu" ymailto="mailto:thomasv@iit.edu">thomasv@iit.edu</A><BR>Cc: <A href="mailto:bldg-sim@lists.onebuilding.org"
 ymailto="mailto:bldg-sim@lists.onebuilding.org">bldg-sim@lists.onebuilding.org</A><BR>Subject: Re: [Bldg-sim] Fwd: Re: RE: Voodoo Engineering<BR><BR>Glenn,<BR><BR>Oversize isn't always bad! A condensing boiler is generally at its most<BR>efficient at &lt; 20% of its capacity.<BR><BR>All the same, the mid-season is largely ignored when it comes to sizing.<BR>Ridiculous really, when you think this is where the plant will be 90% of<BR>the time.<BR><BR>Perhaps this is more of an issue when you are shifting large amounts of<BR>chilled water to various pieces of zone equipment but has anybody<BR>considered Valve Authority? Unfortunately my experience is limited when<BR>it comes to the nitty gritty of piping networks. But, I do know one<BR>thing: valve response is not linear, especially if there is a<BR>substantial head in the system. My hunch is mid season control could get<BR>really messed up if plant has spare capacity but designers haven't been<BR>quite as
 generous with pipe sizes.<BR><BR>Such questions should be in the domain of simulation in the next few<BR>years.<BR><BR>Chris<BR><BR>on 20/5/10 8:15 PM, "Haynes, Glenn" &lt;<A href="mailto:Glenn.Haynes@kema.com" ymailto="mailto:Glenn.Haynes@kema.com">Glenn.Haynes@kema.com</A>&gt; wrote:<BR><BR>&gt; Brad,<BR>&gt;<BR>&gt; I did HVAC design consulting for 14 years, and I used to oversize <BR>&gt; systems just like everyone else.&nbsp; Now I am an energy conservation <BR>&gt; programs evaluator, and have discovered the extent and negative <BR>&gt; impacts of over sizing.&nbsp; Not speaking for all designers who oversize, <BR>&gt; I did it mainly out of willful ignorance.&nbsp; It was easier for me to <BR>&gt; loosely calculate the peak loads and then beef those estimates up <BR>&gt; enough to safely cover and mistakes or false assumptions than it was <BR>&gt; to calculate the loads with enough confidence to properly size the <BR>&gt; systems.&nbsp; I
 believed in the old adage that too much is just right from<BR><BR>&gt; my perspective, because it minimized risk.<BR>&gt;<BR>&gt; But now I have to measure the effects of excessive over sizing and see<BR><BR>&gt; the results, some of which are poor humidity control, short cycling, <BR>&gt; reduced system operating efficiency and higher first cost to the<BR>owner.<BR>&gt; My DOE2 models usually indicate peak (I mean absolute hourly peak <BR>&gt; loads) at about 20% less than Manual J loads, on average, for <BR>&gt; residential applications.&nbsp; But even Manual J allows up to 20% above <BR>&gt; their calculated loads, which have already been calculated using <BR>&gt; conservative estimates for most inputs that are not explicitly <BR>&gt; defined.&nbsp; The observed<BR>&gt; (measured) field results have proven the average residential AC system<BR><BR>&gt; to be about 70% to 75% oversized, with some as high as 200% (that's 3 <BR>&gt; times the peak
 load).&nbsp; 20% to 25% over ASHRAE's 2.5% design standard <BR>&gt; is acceptable to me now, but anything above 25% without some <BR>&gt; overriding owner requirement (plans to add on to the current building,<BR><BR>&gt; etc.) begins to waste the owner's resources (from first cost to energy<BR><BR>&gt; and maintenance costs) and reduce the lifetime of the equipment while <BR>&gt; at the same time decreasing his overall level of comfort through <BR>&gt; limited latent performance.<BR>&gt;<BR>&gt; There!&nbsp; You obviously rubbed a sore spot in my emotional make-up, but <BR>&gt; I appreciate the opportunity to make a point.&nbsp; And the point is this: <BR>&gt; no matter how good your modeling software is, the outcome is still in <BR>&gt; the hands of the user.<BR>&gt;<BR>&gt; Glenn<BR>&gt;<BR>&gt; -----Original Message-----<BR>&gt; From: <A href="mailto:bldg-sim-bounces@lists.onebuilding.org"
 ymailto="mailto:bldg-sim-bounces@lists.onebuilding.org">bldg-sim-bounces@lists.onebuilding.org</A><BR>&gt; [mailto:<A href="mailto:bldg-sim-bounces@lists.onebuilding.org" ymailto="mailto:bldg-sim-bounces@lists.onebuilding.org">bldg-sim-bounces@lists.onebuilding.org</A>] On Behalf Of Acker, <BR>&gt; Brad<BR>&gt; Sent: Thursday, May 20, 2010 1:45 PM<BR>&gt; To: Paul Carey; Chris Yates; Varkie C Thomas<BR>&gt; Cc: <A href="mailto:bldg-sim@lists.onebuilding.org" ymailto="mailto:bldg-sim@lists.onebuilding.org">bldg-sim@lists.onebuilding.org</A><BR>&gt; Subject: Re: [Bldg-sim] Fwd: Re: RE: Voodoo Engineering<BR>&gt;<BR>&gt; I do not do modeling on a daily basis so I'm not as experience as many<BR><BR>&gt; other here. I do agree modeling just for LEED is silly. I have seen <BR>&gt; modeling inform designs, reduce loads, and SIZE SYSTEMS. This last <BR>&gt; part is what most bugs me. Why do people put so much effort into <BR>&gt; models and then not use them to
 size the systems? Preventing over <BR>&gt; sizing is a great benefit of modeling. What is your experience with <BR>&gt; using models to size systems? Why do engineers fall back on the vendor<BR><BR>&gt; based programs and 9 out of 10 times end up over sizing systems?<BR>&gt;<BR>&gt; Brad Acker, P.E.<BR>&gt;<BR>&gt; -----Original Message-----<BR>&gt; From: <A href="mailto:bldg-sim-bounces@lists.onebuilding.org" ymailto="mailto:bldg-sim-bounces@lists.onebuilding.org">bldg-sim-bounces@lists.onebuilding.org</A><BR>&gt; [mailto:<A href="mailto:bldg-sim-bounces@lists.onebuilding.org" ymailto="mailto:bldg-sim-bounces@lists.onebuilding.org">bldg-sim-bounces@lists.onebuilding.org</A>] On Behalf Of Paul <BR>&gt; Carey<BR>&gt; Sent: Thursday, May 20, 2010 3:42 AM<BR>&gt; To: 'Chris Yates'; 'Varkie C Thomas'<BR>&gt; Cc: <A href="mailto:bldg-sim@lists.onebuilding.org" ymailto="mailto:bldg-sim@lists.onebuilding.org">bldg-sim@lists.onebuilding.org</A><BR>&gt; Subject:
 Re: [Bldg-sim] Fwd: Re: RE: Voodoo Engineering<BR>&gt;<BR>&gt; Just to add a couple of points to this interesting debate.<BR>&gt;<BR>&gt; I see the problem being that, as we increasingly set more defined <BR>&gt; limits regarding energy modelling and its role in building regulation,<BR><BR>&gt; we are seeing buildings that are being built and designed to purely <BR>&gt; meet compliance.&nbsp; This is in some part is useful as it brings all <BR>&gt; buildings up to a minimum standard, the flip side of that problem is <BR>&gt; that it also means, that to many developers this means there is no <BR>&gt; incentive to strive for alternatives or innovative solutions.&nbsp; It can <BR>&gt; also allow therefore lead to the use of simpler tools that meet those <BR>&gt; prescribed limits, but really don't push the boundaries of engineering<BR><BR>&gt; design enhancement of buildings.<BR>&gt;<BR>&gt; The correct implementation and use of energy modelling need not
 be a <BR>&gt; hindrance to projects nor be seen as a necessary "extra" or evil if <BR>&gt; you consider the design process as a whole.&nbsp; If you use the tools at <BR>&gt; the concept or schematic design phases, this can quantitatively <BR>&gt; confirm an engineer's instinct or gained experience in way that will <BR>&gt; enable them to show compliance later on. It will then allow the team <BR>&gt; to come to a decision on the most energy efficient but also compliant <BR>&gt; route of design earlier on in the design stage and should stop the <BR>&gt; repeat iteration of designs as the building design progresses and <BR>&gt; therefore reduce design costs and with luck increase productivity and<BR>profit accordingly.<BR>&gt; Fanciful dream perhaps, but it does work.<BR>&gt;<BR>&gt; I visited an architect a while back and he said to me "Why do I need <BR>&gt; to do modelling, I know the principles of good low energy design, I <BR>&gt; can read
 books<BR>&gt; and learn more if I need to".&nbsp; To which I replied, "Well every time<BR>you<BR>&gt; send me a job to check for building regulation compliance 3 weeks <BR>&gt; before it goes before a planning team, I normally have to tell you <BR>&gt; what you need to do in terms of meeting compliance as your buildings <BR>&gt; are consistently failing and you then have to rush to make those <BR>&gt; changes.&nbsp; I am effectively designing your buildings for you, so if you<BR><BR>&gt; want to continue without using energy modelling then please carry on, <BR>&gt; and I'll continue to design your buildings."<BR>&gt; As you can imagine this was one of those Eureka moments for this <BR>&gt; Architect, as I waved my red rag in front of his face.<BR>&gt;<BR>&gt; My tuppence worth.<BR>&gt;<BR>&gt; Paul<BR>&gt;<BR>&gt; -----Original Message-----<BR>&gt; From: <A href="mailto:bldg-sim-bounces@lists.onebuilding.org"
 ymailto="mailto:bldg-sim-bounces@lists.onebuilding.org">bldg-sim-bounces@lists.onebuilding.org</A><BR>&gt; [mailto:<A href="mailto:bldg-sim-bounces@lists.onebuilding.org" ymailto="mailto:bldg-sim-bounces@lists.onebuilding.org">bldg-sim-bounces@lists.onebuilding.org</A>] On Behalf Of Chris <BR>&gt; Yates<BR>&gt; Sent: 20 May 2010 07:55<BR>&gt; To: Varkie C Thomas<BR>&gt; Cc: <A href="mailto:bldg-sim@lists.onebuilding.org" ymailto="mailto:bldg-sim@lists.onebuilding.org">bldg-sim@lists.onebuilding.org</A><BR>&gt; Subject: Re: [Bldg-sim] Fwd: Re: RE: Voodoo Engineering<BR>&gt;<BR>&gt; Varkie<BR>&gt;<BR>&gt; Vast subject. Kudos for condensing it whilst conveying all the <BR>&gt; necessary meaning.<BR>&gt;<BR>&gt; We are now at a point where Energy Modellers are at the very least <BR>&gt; specialist engineers. In fact, you could say the best are indeed <BR>&gt; "wizards"!<BR>&gt;<BR>&gt; Chris<BR>&gt;<BR>&gt; Sent from my iPhone<BR>&gt;<BR>&gt; On 19 May
 2010, at 21:35, Varkie C Thomas &lt;<A href="mailto:thomasv@iit.edu" ymailto="mailto:thomasv@iit.edu">thomasv@iit.edu</A>&gt; wrote:<BR>&gt;<BR>&gt;&gt; Since my response has ended up on Bldg-Sim, I might as well include <BR>&gt;&gt; the attachment with the response which gave my views <BR>&gt;&gt; &lt;Building-Energy-Programs-VCT.doc&gt;<BR>&gt;&gt; I am including the attachment that I included with my earlier <BR>&gt;&gt; response<BR>&gt;<BR>&gt;&gt; to John Eurek. Using energy programs is like voodoo engineering if <BR>&gt;&gt; you<BR>&gt;<BR>&gt;&gt; don't understand its engineering basis.&nbsp; It analyzes the various <BR>&gt;&gt; options quantitatively.&nbsp; It cannot be used as a magic black box.<BR>&gt;&gt; Experience and judgement have to applied to the results.<BR>&gt;&gt;<BR>&gt;&gt; ----- Original Message -----<BR>&gt;&gt; From: Eric O'Neill &lt;<A href="mailto:elo@MichaelsEngineering.com"
 ymailto="mailto:elo@MichaelsEngineering.com">elo@MichaelsEngineering.com</A>&gt;<BR>&gt;&gt; Date: Wednesday, May 19, 2010 12:03 pm<BR>&gt;&gt; Subject: RE: Voodoo Engineering<BR>&gt;&gt;<BR>&gt;&gt;&gt; John,<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; The purpose of energy modeling is to identify differences between <BR>&gt;&gt;&gt; two<BR>&gt;<BR>&gt;&gt;&gt; energy related setups. The idea is to tell you how much you could <BR>&gt;&gt;&gt; conceivably save by switching from one design to another. This is <BR>&gt;&gt;&gt; usefulfor a payback analysis or life cycle cost analysis.<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; Hope this helps, (I'm really not trying to be inflammatory :) )<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; Eric<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; -----Original Message-----<BR>&gt;&gt;&gt; From: Eurek, John S NWO [mailto:<A href="mailto:John.S.Eurek@usace.army.mil" ymailto="mailto:John.S.Eurek@usace.army.mil">John.S.Eurek@usace.army.mil</A>]<BR>&gt;&gt;&gt; Sent:
 Wednesday, May 19, 2010 11:19 AM<BR>&gt;&gt;&gt; To: Varkie C Thomas<BR>&gt;&gt;&gt; Cc: Eric O'Neill; <A href="mailto:cmg750@gmail.com" ymailto="mailto:cmg750@gmail.com">cmg750@gmail.com</A><BR>&gt;&gt;&gt; Subject: RE: Voodoo Engineering<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; Varkie, I read your attached paper.<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; "Energy programs are external to the design process. The results are<BR><BR>&gt;&gt;&gt; not used to generate construction drawings."&nbsp; This may be my #1 beef<BR><BR>&gt;&gt;&gt; with energymodeling.&nbsp; What is the purpose?<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; If you say, to save energy...&nbsp; It does not.<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; John Eurek<BR>&gt;&gt;&gt; LEEP AP<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; -----Original Message-----<BR>&gt;&gt;&gt; From: Varkie C Thomas [mailto:<A href="mailto:thomasv@iit.edu" ymailto="mailto:thomasv@iit.edu">thomasv@iit.edu</A>]<BR>&gt;&gt;&gt; Sent:
 Wednesday, May 19, 2010 10:08 AM<BR>&gt;&gt;&gt; To: Eurek, John S NWO<BR>&gt;&gt;&gt; Subject: Voodoo Engineering<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; Academia institutions and research centers tend to attach <BR>&gt;&gt;&gt; disproportionate amount of importance to energy modeling.&nbsp; Most them<BR><BR>&gt;&gt;&gt; have not dealt withreal buildings.&nbsp; Attached are my views on energy <BR>&gt;&gt;&gt; modeling.<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt; ----- Original Message -----<BR>&gt;&gt;&gt; From: "Eurek, John S NWO" &lt;<A href="mailto:John.S.Eurek@usace.army.mil" ymailto="mailto:John.S.Eurek@usace.army.mil">John.S.Eurek@usace.army.mil</A>&gt;<BR>&gt;&gt;&gt; Date: Wednesday, May 19, 2010 8:14 am<BR>&gt;&gt;&gt; Subject: Re: [Equest-users] Compliance rule set for Oregon<BR>&gt;&gt;&gt;<BR>&gt;&gt;&gt;&gt;<BR>&gt;&gt;&gt;&gt; I would prefer Lynn work to ban/destroy/do-away-with energy<BR>&gt;&gt;&gt; modeling.&gt;<BR>&gt;&gt;&gt;&gt; Any chance this voo-doo
 engineering will go away any time soon?<BR>&gt;&gt;&gt;&gt; It is only<BR>&gt;&gt;&gt;&gt; statistical analysis with no meaningful/useful results for anyone.<BR>&gt;&gt;&gt;&gt;<BR>&gt;&gt;&gt;&gt; As a community I think we are going in the wrong direction for<BR>&gt;&gt;&gt; the<BR>&gt;&gt;&gt;&gt; rightgoals.<BR>&gt;&gt;&gt;&gt;<BR>&gt;&gt;&gt;&gt; -----Original Message-----<BR>&gt;&gt;&gt;&gt; From: <A href="mailto:equest-users-bounces@lists.onebuilding.org" ymailto="mailto:equest-users-bounces@lists.onebuilding.org">equest-users-bounces@lists.onebuilding.org</A><BR>&gt;&gt;&gt;&gt; [mailto:<A href="mailto:equest-users-bounces@lists.onebuilding.org" ymailto="mailto:equest-users-bounces@lists.onebuilding.org">equest-users-bounces@lists.onebuilding.org</A>] On Behalf Of<BR>&gt;&gt;&gt; Carol<BR>&gt;&gt;&gt;&gt; Gardner<BR>&gt;&gt;&gt;&gt; Sent: Wednesday, May 19, 2010 12:30 AM<BR>&gt;&gt;&gt;&gt; To: Scott Criswell<BR>&gt;&gt;&gt;&gt; Cc: <A
 href="mailto:equest-users@lists.onebuilding.org" ymailto="mailto:equest-users@lists.onebuilding.org">equest-users@lists.onebuilding.org</A>; <A href="mailto:curt.strobehn@eesinet.com" ymailto="mailto:curt.strobehn@eesinet.com">curt.strobehn@eesinet.com</A><BR>&gt;&gt;&gt;&gt; Subject: Re: [Equest-users] Compliance rule set for Oregon<BR>&gt;&gt;&gt;&gt;<BR>&gt;&gt;&gt;&gt; All,<BR>&gt;&gt;&gt;&gt;<BR>&gt;&gt;&gt;&gt; Lynn Bellenger will soon be the first female president of ASHRAE..<BR>&gt;&gt; _______________________________________________<BR>&gt;&gt; Bldg-sim mailing list<BR>&gt;&gt; <A href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" target=_blank>http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</A><BR>&gt;&gt; To unsubscribe from this mailing list send&nbsp; a blank message to<BR>&gt; <A href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG"
 ymailto="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</A><BR>&gt; _______________________________________________<BR>&gt; Bldg-sim mailing list<BR>&gt; <A href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" target=_blank>http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</A><BR>&gt; To unsubscribe from this mailing list send&nbsp; a blank message to <BR>&gt; <A href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG" ymailto="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</A><BR>&gt;<BR>&gt; _______________________________________________<BR>&gt; Bldg-sim mailing list<BR>&gt; <A href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" target=_blank>http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</A><BR>&gt; To unsubscribe from this mailing list send&nbsp; a blank message to <BR>&gt; <A
 href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG" ymailto="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</A><BR>&gt; _______________________________________________<BR>&gt; Bldg-sim mailing list<BR>&gt; <A href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" target=_blank>http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</A><BR>&gt; To unsubscribe from this mailing list send&nbsp; a blank message to <BR>&gt; <A href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG" ymailto="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</A><BR>&gt;<BR>&gt;<BR>&gt;<BR>_______________________________________________<BR>Bldg-sim mailing list<BR><A href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" target=_blank>http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</A><BR>To unsubscribe from this mailing list send&nbsp; a blank
 message to <A href="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG" ymailto="mailto:BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG">BLDG-SIM-UNSUBSCRIBE@ONEBUILDING.ORG</A><BR></DIV></DIV></div><br>

      </body></html>