<table cellspacing="0" cellpadding="0" border="0" ><tr><td valign="top" style="font: inherit;"><DIV>Kevin:</DIV>
<DIV>&nbsp;</DIV>
<DIV>Hope&nbsp;I didn't steer you wrong. Let me show you the screen shot of what I found..</DIV>
<DIV>&nbsp;</DIV>
<DIV>But I think this may be for something else. I know that in schedules, Monday always comes first, before Sunday.</DIV>
<DIV>&nbsp;</DIV>
<DIV>I also cannot think of any output that assigns a number to a day.</DIV>
<DIV>&nbsp;</DIV>
<DIV>Sorry to confuse you.</DIV>
<DIV>&nbsp;</DIV>
<DIV>John</DIV>
<DIV>&nbsp;</DIV>
<H4>DayOfWeek or #DOW</H4>
<P class=MsoBodyText>Returns an integer index of the day of week corresponding to the Yr/Mo/Da entered.&nbsp; When CalcLeap is set to 1 or a leap year, then the calc assumes 29 days in february, else 28. </DIV>
<P class=MsoBodyText>&nbsp;&nbsp; Return values:</DIV>
<P class=MsoListNumber style="MARGIN-LEFT: 18pt; tab-stops: 36.0pt"><SPAN style="FONT-FAMILY: 'Tms Rmn'">1.&nbsp;&nbsp;&nbsp; </SPAN>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Sun</DIV>
<P class=MsoListNumber style="MARGIN-LEFT: 18pt; tab-stops: 36.0pt"><SPAN style="FONT-FAMILY: 'Tms Rmn'">2.&nbsp;&nbsp;&nbsp; </SPAN>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Mon</DIV>
<P class=MsoListNumber style="MARGIN-LEFT: 18pt; tab-stops: 36.0pt"><SPAN style="FONT-FAMILY: 'Tms Rmn'">3.&nbsp;&nbsp;&nbsp; </SPAN>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Tue</DIV>
<P class=MsoListNumber style="MARGIN-LEFT: 18pt; tab-stops: 36.0pt"><SPAN style="FONT-FAMILY: 'Tms Rmn'">4.&nbsp;&nbsp;&nbsp; </SPAN>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Wed</DIV>
<P class=MsoListNumber style="MARGIN-LEFT: 18pt; tab-stops: 36.0pt"><SPAN style="FONT-FAMILY: 'Tms Rmn'">5.&nbsp;&nbsp;&nbsp; </SPAN>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Thu</DIV>
<P class=MsoListNumber style="MARGIN-LEFT: 18pt; tab-stops: 36.0pt"><SPAN style="FONT-FAMILY: 'Tms Rmn'">6.&nbsp;&nbsp;&nbsp; </SPAN>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Fri</DIV>
<P class=MsoListNumber style="MARGIN-LEFT: 18pt; tab-stops: 36.0pt"><SPAN style="FONT-FAMILY: 'Tms Rmn'">7.&nbsp;&nbsp;&nbsp; </SPAN>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Sat</DIV>
<P class=Exampleinput>Syntax</DIV>
<P class=DOE-2Input>DayOfWeek(Year, Month, Day, CalcLeap ) <BR>or "#CDN(Year, Month, Day, CalcLeap)</DIV>
<P class=MsoBodyText>where the first argument (Azimuth) is the azimuth of the surface, and the second argument (Tilt) is the tile of the surface.</DIV>
<DIV><BR><BR>&nbsp;</DIV></td></tr></table><br>