Dear All,<br><br>I am curious how many systems or fan systems most of you usually create when you model baseline systems? <br><br>I am particularly interested because under point G3.1.2.10 - Exhaust Air Energy Recovery, one only has to apply an energy recovery device if a single fan system is larger than 5000 cfm. I have not seen anywhere (please direct me if there is indeed prescriptions for this in an ASHRAE publication) guidelines for how many fan systems one has to model in a baseline building? It seems that if I have a building with let's say 15000 cfm supply air, I am free to model this building's baseline system with either 2 or 4 fan systems? Then, if I model this building with 4 fan systems (each system sized equally at 3750 cfm), I would not have to use energy recovery in the baseline building, while if I choose to model the baseline with 2 fan systems (each sized equally at 7500 cfm), then I must use energy recovery.<br>



<br>I would also appreciate input on a typical size of a fan system. If I have a building that has a supply design air flow requirement of 100,000 cfm, how many fan systems would typically be modeled? I am not too familiar with HVAC design, and I tried looking for clues at manufacturers' websites but only Carrier indicated an upper threshold of about 150 tons for their coils. Does anyone have an experience with a typical airflow for a very hot climate over a 150 ton coil? I am looking at System 8 for my baseline building, and I imagine that for a large building (35 stories), several coils will be installed. I am using Trace to do the energy model, and for some reason, the more systems I model the higher the energy usage, keeping everything else constant. Therefore I am interested in modeling several fan systems, if that is common design practice.<br>
<br>Lastly, I would like to confirm that the design of the baseline system beyond what is stipulated in Appendix G should comply with common practice? In particular, numbers and sizes of systems does not seem to be much discussed in Appendix G. Please let me know if you share my approach in applying common design practices to size and locate equipment beyond Appendix G prescriptions.<br>
<br>I appreciate any feedback you might have on these issues.<br><br>Faithfully yours,<br><br><br>

<b>Ulrik Welle-Strand Horn </b><br>Sustainability Engineer<br><div><br><b>Silpa Inc.</b><br><font size="1"><b>s</b> i m p l e  .  <b>s</b> c i e n t i f i c  .  <b>s</b> u s t a i n a b l e<br></font></div>
<font size="1"><div>AMERICAS | MIDDLE EAST | ASIA<br>




<a href="http://www.silpainc.com/" target="_blank">www.silpainc.com</a><br></div><font size="2"><br></font></font><font size="2">India: +91.90080.96083</font><br><br>