<div dir="ltr">I am also in the middle of a DES project at the moment.&nbsp; The way that I interpreted Step 1 and 2 is as follows:<br><br>Step 1:<br><br>Baseline: all downstream (on-site) equipment, envelope components, etc, as in Appendix G.&nbsp; heating and cooling is purchased from a DES system.<br>
Proposed: all downstream (on-site) equipment, envelope components, etc, as designed.&nbsp; Heating and cooling is purchased from a DES system.<br><br>Step 2:<br><br>Baseline: all equipment is modeled as on-site.&nbsp; Boilers and Chillers are to be modeled as designed in Appendix G.&nbsp; Utility rates are to be local utility rates<br>
Proposed: building is to be modeled as built.&nbsp; Heating and cooling is purchased from a DES system, energy costs must take into account DES production and transmission losses.<br><br>In my opinion, the vocabulary in Table 1 is confusing, but the guidelines on pages 5 and 6 seem pretty clear.&nbsp; Am I on the same page as everyone else here?<br>
<br>Thanks,<br><br>--<br>Karen<br><br>