<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML dir=ltr><HEAD>
<META http-equiv=Content-Type content="text/html; charset=us-ascii">
<META content="MSHTML 6.00.2900.2963" name=GENERATOR></HEAD>
<BODY>
<DIV dir=ltr align=left><SPAN class=984422521-11082008><FONT face=Arial 
color=#0000ff size=2>Hi Chien Si !!</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=984422521-11082008><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN>&nbsp;</DIV>
<DIV dir=ltr align=left><SPAN class=984422521-11082008><FONT face=Arial 
color=#0000ff size=2>I believe you need only put in the one ASHRAE 90.1 minimum 
wall U-value. Exactly what Table 5.5 asks for.</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=984422521-11082008><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN>&nbsp;</DIV>
<DIV dir=ltr align=left><SPAN class=984422521-11082008>
<DIV align=left>
<DIV align=left><FONT color=#0000ff>John R. Aulbach, PE, CEM</FONT></DIV>
<DIV align=left><FONT face=Arial size=2><EM>Project Manager</EM></FONT></DIV>
<DIV align=left><FONT face=Arial size=2><FONT color=#0000ff>Nexant, 
Inc</FONT>.</FONT></DIV>
<DIV align=left><FONT face=Arial size=2>701 West Kimberly Ave., Suite 
245</FONT></DIV>
<DIV align=left><FONT face=Arial size=2>Placentia, CA 92870-6342 
USA</FONT></DIV>
<DIV align=left><FONT face=Arial size=2>Phone: 714-524-4402</FONT></DIV>
<DIV align=left><FONT face=Arial size=2>Fax: 714-524-4407</FONT></DIV>
<DIV align=left><FONT face=Arial size=2>email: <A 
title=mailto:jaulbach@nexant.com 
href="mailto:jaulbach@nexant.com">jaulbach@nexant.com</A></FONT></DIV>
<DIV>&nbsp;</DIV></DIV></SPAN></DIV><BR>
<DIV class=OutlookMessageHeader lang=en-us dir=ltr align=left>
<HR tabIndex=-1>
<FONT face=Tahoma size=2><B>From:</B> bldg-sim-bounces@lists.onebuilding.org 
[mailto:bldg-sim-bounces@lists.onebuilding.org] <B>On Behalf Of </B>Chien Si 
Harriman<BR><B>Sent:</B> Monday, August 11, 2008 2:21 PM<BR><B>To:</B> 
bldg-sim@lists.onebuilding.org<BR><B>Subject:</B> [Bldg-sim] multiple wall 
constructions for LEED<BR></FONT><BR></DIV>
<DIV></DIV>
<DIV><FONT face=Arial color=#000000 size=2>Hi all-</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2>A quick, but kind of hazy question for me at least, 
regarding LEED projects.&nbsp; Let's just say, that a building is composed of 
multiple wall types, spanning a range of the ASHRAE 90.1 definitions...some 
portions of the building is steel framed, another portion is mass wall, and yet 
another portion is wood framed, for example.&nbsp; In this case, what would the 
baseline be defined as?&nbsp; Does each wall remain categorically intact, and 
you simply choose the baseline U-factor that corresponds to that wall type, or 
do you have to determine the wall type that makes up the majority of the 
proposed building, and choose this wall type as the baseline wall type?&nbsp; 
</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2>Thanks in advance,</FONT></DIV>
<DIV><FONT face=Arial size=2>Chien</FONT></DIV></BODY></HTML>