<table cellspacing='0' cellpadding='0' border='0' ><tr><td valign='top' style='font: inherit;'>Hello, all,<br><br>I am simulating a 3-floor, 78000 ft2 office building with eQUEST for LEED CS. For the ASHRAE basecase (VAV system), there are many zones with the unmet heating setpoint. The unmet hours around 100-180 which are 50 hours more than than the proposed design case (water-loop heat pump system). Is there any method that can reduce the unmet hours in the basecase VAV system? I tried to increase the sizing ratio for heating and etc., but this does not reduce the unmet heated hours.<br><br>Any suggestions?<br><br>Thanks.<br><br>Regards,<br><br>David<br></td></tr></table><br>