<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=utf-8">
<META content="MSHTML 6.00.6000.16608" name=GENERATOR></HEAD>
<BODY style="MARGIN: 4px 4px 1px; FONT: 10pt Tahoma">
<DIV>For the purposes of LEED analysis, I have 3 questions:</DIV>
<DIV> </DIV>
<DIV>1.  is the cost comparison (ES-D) between:  </DIV>
<DIV> </DIV>
<DIV>PROJECT NAME  - T24 Standard Building.SIM </DIV>
<DIV>and </DIV>
<DIV>PROJECT NAME - T24 Proposed Building.SIM</DIV>
<DIV> </DIV>
<DIV>or are these two compared:</DIV>
<DIV> </DIV>
<DIV>PROJECT NAME - T24 Standard Building.SIM </DIV>
<DIV>and</DIV>
<DIV>PROJECT NAME - Baseline Design.SIM (i.e. just the regular building without any T24 requirements)</DIV>
<DIV> </DIV>
<DIV>2.  I realize that process energy needs to be included for these runs, but are there any other ways in which the auto-generated T24 models need to be modified (as compared to a Title 24 analysis)?</DIV>
<DIV> </DIV>
<DIV>3.  What are we allowed to modify from T24 in the Proposed that Title 24 doesn't allow you to modify (schedules?)?</DIV>
<DIV> </DIV>
<DIV>-Eric</DIV></BODY></HTML>