Dear all,<br><br>How does changing the glazing of a historic building affect the way it's modeled in the baseline case for LEED EA Cr1? Would the baseline have to be ASHRAE 90.1 compliant or can it still be an exception?<br>
<br>Thanks,<br><br>Ramana Koti, LEED AP<br>Sustainable Building Analyst<br><br>ELEMENTS division of BNIM architects<br>106 W. 14th Street Suite 200<br>Kansas City, Missouri 64105<br><br>p 816.783.1635 f 816.783.1501<br>www.bnim.com| <a href="http://elements.bnim.com">elements.bnim.com</a>