Dear all,<br><br>I have a question for sizing the LEED ASHRAE base case air flow within eQUEST.<br><br>In ASHRAE Appendex G, the base case for sizing space air flow rate method is based on supply air and space temperature difference of 20 F. <br><br>Within eQUEST, for system wizard 2, in "Air flows"-"Minimum Design Flow", the default value is 0.5CFM/Ft2. I checked the help file, it says for conventional design, the number is 1CFM/Ft2. I did the sizing simulation based on these<br>two values and found big difference in the SV-A report "Supply  flow". In my understanding, the 0.5CFM/Ft2, or 1CFM/Ft2 only describes the minimum flow rate, why this value will affect the design air flow rate? Could somebody tell what number should I use to sizing design air flow rate for meeting LEED-ASHRAE requirements?<br><br>Thanks a lot in advance.<br><br>Regards,<br><br>David<p>