<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=us-ascii">
<META content="MSHTML 6.00.2800.1601" name=GENERATOR></HEAD>
<BODY>
<DIV dir=ltr align=left><SPAN class=268420416-08012008><FONT face=Arial 
color=#0000ff size=2>MDCQ = Maximum Daily Contract Quantity. It should probably 
be included as a peak demand charge for natural gas.</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=268420416-08012008><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=268420416-08012008><FONT face=Arial 
color=#0000ff size=2>Mike</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=268420416-08012008><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=268420416-08012008><!-- Converted from text/rtf format -->
<P><B><SPAN lang=en-us><FONT face="Palatino Linotype" color=#000080 size=2>Mike 
Dillon E.I.T., LEED A.P., MBA</FONT></SPAN></B> <BR><SPAN lang=en-us><FONT 
face="Palatino Linotype" color=#000000 size=2>DSM Engineer</FONT></SPAN> 
<BR><SPAN lang=en-us><FONT face="Palatino Linotype" color=#000000 size=2>Avista 
Utilities</FONT></SPAN> <BR><SPAN lang=en-us><FONT face="Palatino Linotype" 
color=#000000 size=2>1411 E. Mission Avenue - MSC 15</FONT></SPAN> <BR><SPAN 
lang=en-us><FONT face="Palatino Linotype" color=#000000 size=2>Spokane, 
Washington 99202</FONT></SPAN> <BR><SPAN lang=en-us><FONT 
face="Palatino Linotype" color=#000000 size=2>Phone: 509.495.4260</FONT></SPAN> 
<BR><SPAN lang=en-us><FONT face="Palatino Linotype" color=#000000 size=2>Mobile: 
509.270.6453</FONT></SPAN> <BR><SPAN lang=en-us><FONT face="Palatino Linotype" 
color=#000000 size=2>Fax: 509.777.6136</FONT></SPAN> <BR><SPAN lang=en-us><FONT 
face="Palatino Linotype" size=2>www.avistautilities.com</FONT></SPAN> 
</P></SPAN></DIV><BR>
<DIV class=OutlookMessageHeader lang=en-us dir=ltr align=left>
<HR tabIndex=-1>
<FONT face=Tahoma size=2><B>From:</B> bldg-sim-bounces@lists.onebuilding.org 
[mailto:bldg-sim-bounces@lists.onebuilding.org] <B>On Behalf Of </B>Andrew 
McNamara<BR><B>Sent:</B> Tuesday, January 08, 2008 7:05 AM<BR><B>To:</B> Cramer 
Silkworth<BR><B>Cc:</B> bldg-sim@lists.onebuilding.org<BR><B>Subject:</B> Re: 
[Bldg-sim] gas: Btus to cost via pricing scheme<BR></FONT><BR></DIV>
<DIV></DIV>Hello Cramer,<BR><BR>An colleage of mine and I did some recently did 
some research on Natural Gas prices for New York State, and we banged our heads 
against the wall for a fair bit before figuring out how these rate structures 
fit together.  The two of us just took a look at what you listed below and 
here's our best guess. <BR><BR>Customer charge is the monthly 
base<BR>Distribution charge is likely the "delivery" component charged on a "per 
therm" or "per ccf" basis<BR>Cost of Gas Adjustment is likely the "supply" 
component charged on a "per therm" or "mdcq" basis (not sure what mdcq is, but 
it seems to me that only one of these two lines applies to the actual bill, 
depending which unit you are billed in (therms vs. mdcq) <BR>Local Distribution 
Adjustment Charge is likely another fee they tack on per therm, ccf, or 
mdcq.<BR><BR>So.... if you were billed in therms, I believe your total bill 
would be 550.41+(1.0322+0.8651+0.0491) * Therms usage. <BR><BR>Hope that 
helps!<BR><BR>Best,<BR>Andy<BR>-- <BR>Andrew McNamara, LEED AP<BR>Bright Power, 
Inc.<BR><BR>tel: 212.803.5868<BR>fax: 866.379.8026<BR>cell: 917.974.4499<BR><BR>
<DIV><SPAN class=gmail_quote>On 1/7/08, <B class=gmail_sendername>Cramer 
Silkworth</B> <<A 
href="mailto:silkworth@transsolar.com">silkworth@transsolar.com</A>> 
wrote:</SPAN>
<BLOCKQUOTE class=gmail_quote 
style="PADDING-LEFT: 1ex; MARGIN: 0pt 0pt 0pt 0.8ex; BORDER-LEFT: rgb(204,204,204) 1px solid">
  <DIV>
  <DIV><SPAN><FONT face=Arial size=2>Hello everyone,</FONT></SPAN></DIV>
  <DIV><SPAN><FONT face=Arial size=2></FONT></SPAN> </DIV>
  <DIV><SPAN><FONT face=Arial size=2>I'm trying to take my gas use output 
  numbers (Btus) and calculate the cost of the gas using the pricing scheme from 
  the local utility (Keyspan in Boston) for a LEED certification. However, I 
  can't figure out what the scheme means. Can someone tell me what these numbers 
  mean, in terms of how to write an equation to take my hourly outputs of gas 
  use (from Trnsys, but I'm doing this in Excel) and calculate final 
  (monthly) cost?</FONT></SPAN></DIV>
  <DIV><SPAN><FONT face=Arial size=2></FONT></SPAN> </DIV>
  <DIV><SPAN><FONT face=Arial size=2>"Customer Charge (fixed): $550.41": I'm 
  assuming this is the monthly base fee.</FONT></SPAN></DIV>
  <DIV><SPAN><FONT face=Arial size=2>"Distribution Charge: $1.0322": Dollars per 
  ...?</FONT></SPAN></DIV>
  <DIV><SPAN><FONT face=Arial size=2>"Cost of Gas Adjustment CGA (mdcq): 
  $0.8432": Again, no idea</FONT></SPAN></DIV>
  <DIV><SPAN><FONT face=Arial size=2>"Cost of Gas Adjustment CGA (Therm): 
  0.8651": ...</FONT></SPAN></DIV>
  <DIV><SPAN><FONT face=Arial size=2>"Local Distrib. Adjustment Charge LDAC: 
  $0.0491": ...</FONT></SPAN></DIV>
  <DIV><SPAN><FONT face=Arial size=2></FONT></SPAN> </DIV>
  <DIV><SPAN><FONT face=Arial size=2>(These numbers are under the heading "High 
  Load Factor General Service Rate - Extra Large," this is for a rather large 
  commercial building complex.</FONT></SPAN></DIV>
  <DIV><SPAN><FONT face=Arial size=2></FONT></SPAN> </DIV>
  <DIV><SPAN><FONT face=Arial size=2>I've gone to the utility's website and 
  found this data, but nothing to explain it, nor anywhere else on the web. I 
  called them, and just get passed around their service department because no 
  one seems to be able to understand how I can have gas numbers without having a 
  building!</FONT></SPAN></DIV>
  <DIV><SPAN><FONT face=Arial size=2></FONT></SPAN> </DIV>
  <DIV><SPAN><FONT face=Arial size=2>Any help would be greatly appreciated. 
  Thanks,</FONT></SPAN></DIV>
  <DIV><SPAN><FONT face=Arial size=2>Cramer</FONT></SPAN></DIV>
  <DIV><FONT face=Arial size=2></FONT> </DIV>
  <P align=left><FONT face=Arial size=1>J. Cramer Silkworth <BR><A 
  onclick="return top.js.OpenExtLink(window,event,this)" 
  href="mailto:silkworth@transsolar.com" 
  target=_blank>silkworth@transsolar.com</A> <BR>+49 0711-67976-182 
  <BR>Transsolar Energietechnik GmbH <BR></FONT><A 
  title=blocked::http://www.transsolar.com/ 
  onclick="return top.js.OpenExtLink(window,event,this)" 
  href="http://www.transsolar.com/" target=_blank><U 
  title=blocked::http://www.transsolar.com/><FONT 
  title=blocked::http://www.transsolar.com/ face=Arial color=#0000ff 
  size=1>http://www.transsolar.com</FONT></U></A><FONT face=Arial size=1> 
  <BR>Stuttgart - Munich - New York </FONT></P>
  <P align=left><FONT face=Arial size=1>Climate Engineering: Technologies for 
  energy-efficiency and user comfort in buildings.<BR>Transsolar Energietechnik 
  GmbH, Curiestrasse 2, 70563 Stuttgart, Germany</FONT></P>
  <P align=left><FONT face=Arial size=1>Amtsgericht Stuttgart -  HRB 23347 
  / USt-IdNr.: 99073/00911</FONT></P>
  <P align=left><FONT face=Arial size=1>Partners: Dipl.Ing. Matthias Schuler, 
  Dipl.Ing. Thomas Auer, Dipl.Phys. Stefan Holst </FONT></P>
  <DIV> </DIV></DIV><BR>_______________________________________________<BR>Bldg-sim 
  mailing list<BR><A onclick="return top.js.OpenExtLink(window,event,this)" 
  href="mailto:Bldg-sim@lists.onebuilding.org">Bldg-sim@lists.onebuilding.org</A><BR><A 
  onclick="return top.js.OpenExtLink(window,event,this)" 
  href="http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org" 
  target=_blank>http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org</A><BR><BR></BLOCKQUOTE></DIV><BR><BR 
clear=all><BR><BR></BODY></HTML>