<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=utf-8">
<META content="MSHTML 6.00.2900.3243" name=GENERATOR></HEAD>
<BODY style="MARGIN: 4px 4px 1px; FONT: 10pt Tahoma">
<DIV>I don't know where it's documented, but you are right that P is for perimeter and C is for core.</DIV>
<DIV> </DIV>
<DIV>
<DIV><BR>***************************************************************</DIV>
<DIV>Kristin M. Field, EI</DIV>
<DIV>Energy Analysis Group</DIV>
<DIV>Architectural Energy Corporation</DIV>
<DIV>2540 Frontier Ave., Suite 201</DIV>
<DIV>Boulder, CO  80301</DIV>
<DIV>303.444.4149</DIV>
<DIV> </DIV>
<DIV> </DIV><BR><BR>>>> "Brandon Nichols" <BrandonN@Hargis.biz> 12/19/2007 12:03 PM >>><BR><BR>All,<BR><BR>The above-referenced schedules are auto-generated by eQuest... I know<BR>the purpose is to model infiltration, but their difference is unclear. <BR><BR>Perhaps 'P' is for perimeter spaces and 'C' for core spaces?  Where is<BR>this documented?<BR><BR><BR>Thanks<BR><BR>Brandon Nichols, PE, LEED(r) AP<BR>Mechanical<BR>HARGIS ENGINEERS<BR><BR>600 Stewart Street<BR>Suite 1000<BR>Seattle, WA 98101<BR>www.hargis.biz<BR><BR>d | 206.436.0400  c | 206.228.8707<BR>o | 206.448.3376  f  | 206.448.4450<BR><BR><BR><BR>_______________________________________________<BR>Bldg-sim mailing list<BR>Bldg-sim@lists.onebuilding.org<BR><A href="http://lists.onebuilding.org/listinfo.cgi/bldg">http://lists.onebuilding.org/listinfo.cgi/bldg</A>-sim-onebuilding.org<BR></DIV></BODY></HTML>