Hi All,<br><br>I just wanted to pass along a few recent clarifications from the USGBC that may help you out with some of your projects:<br><ol><li>A prescriptive methodology for documenting energy improvements</li><li>More specific guidance regarding methods for crediting future TI efficiency improvements in Core & Shell buildings
</li><li>Revision to an existing LEED-NC CIR that allows credit for exterior lighting (tradable surfaces only)</li></ol>1. <b>A prescriptive method for documenting energy improvements (LEED-NC / LEED-CS /LEED for schools)
</b>.  The USGBC now allows us to use the "Advanced Buildings Core Performance Guide" to document prescriptive compliance for buildings less than 100,000 square feet (not including healthcare, warehouse, or laboratory facilities).  As little as two, and as many as four or five points are available using this approach (depending on building type).
<br><br><div style="margin-left: 80px;">CS Errata Sheet: <a href="http://www.usgbc.org/ShowFile.aspx?DocumentID=3203">http://www.usgbc.org/ShowFile.aspx?DocumentID=3203</a><br><br>Schools Errata Sheet: <a href="http://www.usgbc.org/ShowFile.aspx?DocumentID=3169">
http://www.usgbc.org/ShowFile.aspx?DocumentID=3169</a><br><br>I can't find the corresponding NC requirements on the new website, but based on the most recent information I've seen, it pretty much matches the other two.
<br></div><div style="margin-left: 40px;"><br></div><div style="margin-left: 80px;"></div>2. <b>More specific guidance regarding methods for crediting TI efficiency improvements in Core & Shell Buildings<br><br></b><div style="margin-left: 40px;">
CS Errata Sheet: <a href="http://www.usgbc.org/ShowFile.aspx?DocumentID=3203">http://www.usgbc.org/ShowFile.aspx?DocumentID=3203</a><br><br>This compliance method is available to core and shell projects that incorporate into tenant sales or lease agreements requirements as part of the tenant scope of work. For LEED-CS certification, a core and shell project must meet the mandatory and prescriptive requirements of ASHRAE 
90.1 2004 for all applicable building systems either through the core and shell design and construction scope, or through a tenant sales and lease agreement. A combination of both is acceptable.  Provide the LEED letter template for the credit pursued indicating the following:
<br>•100% of the leased square footage is required to comply with the credit requirements. Lease or sales agreements may be requested.<br>•100% of the unleased square footage shall comply with the credit requirements when leased. A statement signed by the owner/developer that all leases and/or sales agreements will comply may be requested.
<br></div><br>3. <b>Revision to an existing CIR allowing credit for exterior lighting:<br></b><table border="0" cellpadding="0" cellspacing="0" width="100%"><tbody><tr><td valign="top" width="15%"><b>
                                <span id="dlCreditInterpretations__ctl11_lblQuestionDate">4/25/2007</span> - </b></td>
                                <td valign="top"><b>Credit Interpretation Request</b><br>
                                <span id="dlCreditInterpretations__ctl11_lblQuestion">...[extracted text]...<br><br>7.  Exterior Lighting<br>Will
USGBC for LEED 2.2 allow credit for exterior lighting that is more
efficient than the new mandatory provision for exterior lighting in
90.1-2004 section 9.4. Appendix G does not address how exterior
lighting should be modeled for the baseline, and therefore the default
is that it should be modeled the same as the design and no credit for
savings could be taken. <br><br>...<br><br><br></span></td>
                                </tr>
                                <tr>
                                <td> </td>
                                </tr>
                                <tr>
                                <td valign="top" width="15%"><b>
                                <span id="dlCreditInterpretations__ctl11_lblAnswerDate">4/25/2007</span> - </b></td>
                                <td valign="top"><b>Ruling</b><br>
                                <span id="dlCreditInterpretations__ctl11_lblAnswer">[REVISED 10/30/07 to allow energy savings for exterior lighting.]<br></span><span id="dlCreditInterpretations__ctl11_lblQuestion">..[extracted text]...</span><br><span id="dlCreditInterpretations__ctl11_lblAnswer">
7.
Yes, project teams can take credit for efficient exterior lighting
within ASHRAE 90.1 Appendix G. Credit may only be taken for the
tradable surfaces listed in ASHRAE 90.1-2004 Table 9.4.5. All other
exterior lighting must be modeled identically in the Baseline and
Proposed case. The Baseline case exterior lighting power allowance
should be calculated using the methodology outline in Section 9.4.5. <br>...<br><br><br></span></td></tr></tbody></table>Best Regards,<br>Gail Stranske<br>CTG Energetics, Inc.<br>