<div>Dear all</div>
<div> </div>
<div>What does the following waring message mean? Does it matter when I want to get a correct annual energy use and cost? Thank you for your help</div>
<div> </div>
<div> Zone: EL2 NNW Perim Zn (G.NNW1) could not successfully<br> allocate all equipment energy to the 5-minute bins<br> because of an equipment overload. The peak load<br> used in ECONOMICS will not include the fraction due
<br> to the overload, but the PLANT reports will.<br> Mon/Day/Hour: 10 31 1 Energy: 38.0 Unallocated:13.245<br><br clear="all"><br>-- <br>Yours<br>Nicole Chen </div>